Concrete Mix and Strength Acceptance
Sketch of the inputs
Each strength test is checked against f′c − 500 psi and every average of three consecutive tests against f′c; mix proportioning uses the producer standard deviation. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- S.H. Kosmatka and M.L. Wilson, Design and Control of Concrete Mixtures, 15th edition (Portland Cement Association): required average strength, the w/cm table, proportioning steps and acceptance criteria
- J.H. Bungey, Testing of Concrete in Structures, 3rd edition: cores, in-place tests and interpreting low results
- P. Domone and J. Illston (eds.), Construction Materials: Their Nature and Behaviour, 4th edition: hydration, strength development and durability of concrete
- A Class I railroad's general construction specifications (concrete, Section 3.09 to 3.11): sampling frequency, cylinder sets, acceptance and testing-laboratory reporting
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell