GHRMCalculators · Chapter 7.1, Section 7.1.22

Cantilever Soldier Pile and Lagging Wall

Companion to Chapter 7.1 · Retaining Structures, Section 7.1.22 Cantilever Soldier Pile and Lagging Walls. English units throughout.

Sketch of the inputs

soldierS (track centerline)active over spacing s (lagging)passive on the discrete pile(f·b or Eq. 7.1-6) / FSHDPlan: piles at spacing s with width b; lagging spans the clear gap s − b.

A cantilever soldier pile wall of retained height H and embedment D next to track at distance S. Lagging carries active pressure over the pile spacing; below the excavation the discrete pile mobilizes passive resistance over more than its own width. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources