Test Pit Excavation Safety
Sketch of the inputs
Test pit of depth D and bottom width B, with the nearest track at the distance shown. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- C.D. Reese and J.V. Eidson, Handbook of OSHA Construction Safety and Health, 2nd edition (reprints 29 CFR 1926 Subpart P): soil classification, slopes, protective systems, egress and inspection
- Construction Inspection Manual, 8th edition: inspection of excavation, backfill and compaction
- A Class I railroad's guidelines for temporary shoring: clearances, flagging and excavation next to track
- AREMA Manual for Railway Engineering, Chapter 1, Part 5 (Pipelines and utilities): clearance for utility excavations and bores
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell