GHRMCalculators · Chapter 2.8, Section 2.8.14

Construction Dewatering and Track Settlement

Companion to Chapter 2.8 · Groundwater Characterization and Seepage, Section 2.8.14 Construction Dewatering and Track Settlement. English units throughout.

Sketch of the inputs

dewatstatic WTaquifer basetrackHhexcavation a × b → resxcompressible layer Hc

An excavation of plan a × b dewatered by a ring of wells, the lowered water table between the excavation and the track, and a compressible layer under the track that settles when it loses buoyancy. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell