GHRMCalculators · Chapter 7.1, Section 7.1.3.1

Lateral Earth Pressure with Railroad Surcharge

Companion to Chapter 7.1 · Retaining Structures, Section 7.1.3.1 Earth Pressure with Railroad Surcharge. English units throughout.

Sketch of the inputs

earth-pressurebs​xs​qHwater behind wallzw​p(z)backfill γ, φ′δroller line load P (compaction) acts along the backfill surface

Wall of height H retaining backfill (γ, φ′, wall friction δ) with water at depth zw, uniform surcharge q and a railroad strip surcharge qs of width bs at xs from the wall. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell