GHRMCalculators · Chapter 6.5, Section 6.5.5.4

Liquefaction Triggering (SPT)

Companion to Chapter 6.5 · Seismic Hazard and Liquefaction, Section 6.5.5.4 SPT-Based Liquefaction Triggering Calculator. English units throughout.

Sketch of the inputs

liquefactionzw​N, FCN, FCN, FCN, FCN, FCzγm​ above, γs​ belowshaking amax​, Mw​hammer ER, CB​, CS​

SPT boring with blow count N and fines content at each depth z; groundwater at zw during shaking of amax and magnitude Mw. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell