GHRMCalculators · Chapter 2.3, Section 2.3.6.1

Track Modulus and Rail Deflection

Companion to Chapter 2.3 · Track Substructure, Section 2.3.6.1 Track Modulus and Rail Deflection. English units throughout.

Sketch of the inputs

track-modulusP (wheel)second wheelsrail deflection y(x)ts​track modulus u = support force per unit rail length per unit deflectionRail section: I, E, base section modulus Sb​; measured Pm​ and δm​ back-calculate u

Rail on ties at spacing ts, loaded by wheel P (and a second wheel at spacing s); the track modulus u is the continuous support stiffness under the rail. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell