GHRMCalculators · Chapter 2.2, Section 2.2.17

Field Soil Description Builder

Companion to Chapter 2.2 · Soil and Rock Classification, Section 2.2.17 Field Soil Descriptions: Word Pictures for Boring Logs. English units throughout.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell