Curve Superelevation and Speed
Sketch of the inputs
Superelevation E raises the outside rail; the balance speed depends on E plus the allowed underbalance and the curve degree D or radius R. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- A Class I railroad's recommended method for superelevation, spiral length and maximum train speed on curves (2002), Carriers folder.
- A Class I railroad's standard specifications for private sidetracks (2016), Carriers folder: curvature limits and grade compensation.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell