Critical Speed on Soft Ground
Sketch of the inputs
Train at speed V over a soft layer with shear-wave velocity Vs; track response grows sharply as V approaches the critical speed. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- Railway Geotechnics (Li, Hyslip, Sussmann and Chrismer, 2016), Chapter 3.3.8 (critical speed) and Chapter 8 (FWD and surface wave methods).
- The Effects of Railway Traffic on Embankment Stability (UK rail safety research report, 2011): dynamic response of embankments.
- Design and Construction of Pavements and Rail Tracks (Balkema): soft-ground case histories with low shear wave velocity.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell