Oedometer cv, mv and k
Sketch of the inputs
Dial readings with time for one load increment; t50 (or t90) gives cv, and the pressure change with the specimen strain gives mv and k. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- R.F. Craig, Craig's Soil Mechanics, 7th edition: Section 7.8, determination of the coefficient of consolidation, compression ratios, Example 7.4 and Problem 7.1
- B.M. Das, Principles of Geotechnical Engineering, 7th edition: one-dimensional consolidation testing
- P.J. Sabatini and others, Evaluation of Soil and Rock Properties, FHWA Geotechnical Engineering Circular No. 5: consolidation properties and their variability
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell