GHRMCalculators · Chapter 6.3, Section 6.3.3.7

Circular Slip (Simplified Bishop)

Companion to Chapter 6.3 · Slope Stability Analysis, Section 6.3.3.7 Circular Slip Analysis of Embankments by the Simplified Bishop Method. English units throughout.

Sketch of the inputs

bishop-slopelayer boundarypiezometric line(xc​, yc​)RE80 strip q, width Lt​grid of centersSlices ns​; seismic kh​

Circular slip of radius R about center (xc, yc), or a grid of centers; ground points, layer boundaries and a piezometric line; train strip load at the track centerline. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell