Rainfall, Suction and Shallow Slides
Sketch of the inputs
Infinite slope at angle β with slip depth ds and water table Hw below the surface; steady infiltration q controls suction above the water table; root cohesion c′R acts above depth zr. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- N. Lu and W.J. Likos, Unsaturated Soil Mechanics: Chapter 7, steady suction profiles (Eqs. 7.4 and 7.5), van Genuchten effective saturation (Eq. 7.11), the effective stress parameter (Eqs. 7.15 and 7.16), and Tables 7.1 and 7.2
- J.M. Duncan, S.G. Wright and T.L. Brandon, Soil Strength and Slope Stability, 2nd edition: infinite slope analysis and shallow slides
- B.M. Das, Principles of Geotechnical Engineering, 7th edition: effective stress in partially saturated soil
- ICE Manual of Geotechnical Engineering, Vol. II (2012), Ch. 70 (Nowak), Section 70.5 and Table 70.7: root cohesion from vegetation. Chapter 6.3, Section 6.3.18.
- O'Brien (2013), in Partial Saturation in Compacted Soils (ICE Publishing): seasonal pore pressure in clay-fill railway embankments. Chapter 6.4, Section 6.4.12.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell