GHRMCalculators · Chapter 2.1, Section 2.1.17

Granular Layer Thickness (Li-Selig)

Companion to Chapter 2.1 · Track Foundation Elements, Section 2.1.17 Granular Layer Thickness Design (Li-Selig Method). English units throughout.

Sketch of the inputs

trackbed-designgranular layer Eb​subgrade Es​, σs​, soil typestiff basePd​H (to find)Tσd​ at subgrade surfaceLoads: Ps​, V, D (or Pd​); tonnage T1​ (and T2​, Ps2​); allowable εpa​, ρa​

Granular layer of thickness H (modulus Eb) over a deformable subgrade of depth T (Es, σs); H is sized so subgrade strain and deformation stay within limits. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell