GHRMCalculators · Chapter 3.8, Section 3.8.9

Traffic-Induced Track Settlement

Companion to Chapter 3.8 · Failure Mechanisms and Triggers, Section 3.8.9 Traffic-Induced Settlement of Ballast and Subgrade. English units throughout.

Sketch of the inputs

traffic-deformationballast hb​: ε1​, bsoft subgrade Hs​: σd​, σs​PyearssettlementMGT/yr; years already carried y0​; share in high-plasticity soil

Ballast (thickness hb) and soft subgrade (thickness Hs) under repeated wheel load P; settlement accumulates with tonnage. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell