GHRMCalculators · Chapter 5.2, Section 5.2.17

Shear Strength from Lab Tests

Companion to Chapter 5.2 · Laboratory Testing, Section 5.2.17 Reducing Shear Strength Test Results. English units throughout.

Sketch of the inputs

shear-strengthnormal stress σshear τφcTriaxial σ3​, σ1​ or direct shear σ, τ; design σ

Mohr circles (triaxial) or σ–τ points (direct shear) from each specimen; the fitted envelope gives c and φ. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell