GHRMCalculators · Chapter 3.4, Section 3.4.9

Rock Slope Kinematic Screen

Companion to Chapter 3.4 · Site Review and Reconnaissance, Section 3.4.9 Recognizing Rock Structure and Screening Cut Slopes. English units throughout.

Sketch of the inputs

rock-orientationNcut facejoint setfriction cone φface dipjoint dipFace dip and dip direction; lateral limit; sets

Stereonet screen of the cut face against each discontinuity set (dip, dip direction) and the friction angle for planar, wedge and toppling failure. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell