Seismic Slope Displacement (Newmark)
Sketch of the inputs
Infinite-slope or plane-slide block on a slip surface; yield acceleration from c′, φ′, γ and water, then Newmark sliding under the design ground motion. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- J.M. Duncan, S.G. Wright and T.L. Brandon, Soil Strength and Slope Stability, 2nd edition: Chapter 10, pseudo-static analysis, sliding block analysis and the yield coefficient
- D.C. Wyllie and C.W. Mah, Rock Slope Engineering: Civil and Mining, 4th edition: Sections 7.3 to 6.7, plane failure, pseudo-static stability, Newmark analysis, CDMG guidance and Example Problem 6.1
- MIL-HDBK-1007/3, Soil Dynamics and Special Design Aspects (in the library as Soil Dynamics): slopes vulnerable to earthquakes and the Newmark procedure