Rock Wedge Factor of Safety
Sketch of the inputs
Tetrahedral wedge bounded by joint planes 1 and 2, the upper slope (3), the face (4) and an optional tension crack (5), with slope height H1 and anchor force T. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- D.C. Wyllie and C.W. Mah, Rock Slope Engineering: Civil and Mining, 4th edition: Appendix III comprehensive wedge solution and its worked example; Chapter 7 wedge charts
- C.A. Kliche, Rock Slope Stability (SME): wedge failure analysis and stabilization
- FHWA, Rock Slopes: Design, Excavation, Stabilization, FHWA-TS-89-045 (1989): rock slope design, wedge analysis and stabilization methods
- Slope Engineering for Mountain Roads (Geological Society of London, Engineering Geology Special Publication): rock slope hazards along transport corridors