SPT Corrections and Property Correlations
Sketch of the inputs
SPT sample at depth z with field blow count N, hammer energy ratio ER and borehole and sampler factors; groundwater at zw. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- Soil Properties and their Correlations (Carter and Bentley, 2nd edition, 2016).
- Handbook of Geotechnical Investigation and Design Tables (Look, 2007), Site Investigation folder.
- Evaluation of Soil and Rock Properties (FHWA Geotechnical Engineering Circular 5), Soil Mechanics folder.
- Settlement Analysis, USACE EM 1110-1-1904, Table 3-7.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell