GHRMCalculators · Chapter 7.3, Section 7.3.18

AASHTO 1993 Rigid Pavement Design

Companion to Chapter 7.3 · Pavement Subgrade Evaluation, Section 7.3.18 AASHTO 1993 Pavement Design for Crossings, Access Roads and Yards. English units throughout.

Sketch of the inputs

rigidConcrete slab D: S′c, Ecjoint with dowels (J)subbaseSubgrade: effective k (pci); drainage CdW18 (rigid ESALs)

Jointed concrete slab of thickness D on a subbase and subgrade with effective modulus of subgrade reaction k. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell