GHRMCalculators · Chapter 2.2, Section 2.2.15

Expansive Clay Heave

Companion to Chapter 2.2 · Soil and Rock Classification, Section 2.2.15 Expansive Clay: Screening by Activity and Estimating Heave. English units throughout.

Sketch of the inputs

expansive-heavenon-expansive caplayer 1: thickness, swell datalayer 2: thickness, swell datalayer 3: thickness, swell databelow active zonecapza​Seasonal moisture change reaches depth za​

Layered expansive clay within the active zone of depth za, under a non-expansive cap. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell