Trigger Probability over an Exposure Period
Sketch of the inputs
The chance that an event with return period Tr (annual probability pa) happens at least once in n years. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- J.M. Duncan, S.G. Wright and T.L. Brandon, Soil Strength and Slope Stability, 2nd edition: Table 10.2, peak rock accelerations for 10% and 2% probability of exceedance in 50 years
- U.S. Navy, Soil Dynamics and Special Design Aspects, MIL-HDBK-1007/3: response spectrum for 10% exceedance in 100 years (950-year average return period)
- Slope Engineering for Mountain Roads (Geological Society of London, Engineering Geology Special Publication): Section A4, probability of a landslide during a 20-year design life
- B.G. Look, Handbook of Geotechnical Investigation and Design Tables (2007): Tables 14.5 and 14.6, factors of safety for a 10-year return period rainfall
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell