Infinite Slope and Rock Plane Slide
Sketch of the inputs
Left: infinite slope at angle β with slip depth z and water at m·z above the slip plane. Right: plane slide of height H, face ψf, plane ψp, tension crack depth zt and bolt force T at plunge θ. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- Stability of Slopes (R. E. Hunt, handbook chapter) and Stability of Slopes Part 2, 09 Slopes / Slope Stability folder: analytical approaches, infinite slope, planar and circular surfaces.
- Rock Slope Engineering (Wyllie and Mah, 4th and 5th editions), 09 Slopes folder: plane failure with tension crack and water.
- Use of Fully Softened Shear Strength in Slope Stability Analyses (2016 draft), Slope Stability folder: strength selection for clay slopes.
- Slope Stability and Stabilization Methods (book) and Landslide Remediation Using Unconventional Methods.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell