Subsections
48Sections 3.8.1 to 3.8.17 describe how track-support and ground-hazard failures develop, the conditions that set them up and the events that set them off (formerly Chapter 2.2). The rest of this chapter sets out the method for rating ground hazard risk on a railroad and applies it to a single site. It starts from the triggering mechanism, which gives every rating its narrative, and determines the current risk from the geospatial risk and the defect rating. It then sets out the 1-to-5 scales, the risk score R = F × S and the risk matrix (Section 3.8.22), and applies them through the situational, instability, static and live ratings and the rated elements behind them. Each proposed solution is rated through three stages (the solution itself, design and construction, and post-stabilization implementation) so that the risk reduction is measured, not assumed. The chapter closes with the Ground Hazard Risk Assessment Report (Section 3.8.42), the worksheet that records the ratings for a site. Primary references: Chapter 1.1 risk framework; Chapter 3.8 failure mechanisms; Chapters 5.3, 7.1 and 7.2 stabilization methods.
- 3.8.0Purpose and Overviewopen →
- 3.8.1Mechanism, Condition and Triggeropen →
- 3.8.2Track Substructure Failure Mechanismsopen →
- 3.8.3Embankment and Slope Failure Mechanismsopen →
- 3.8.4Hydraulic Failure Mechanismsopen →
- 3.8.5Subsidence and Collapse Mechanismsopen →
- 3.8.6Seismic Mechanismsopen →
- 3.8.7Spring Break-Up: Hydraulic Geohazardsopen →
- 3.8.8Frost Heave, Thaw Weakening and Silt Liquefactionopen →
- 3.8.9Traffic-Induced Settlement of Ballast and Subgradeopen →
- 3.8.10Failure Mechanisms of Old Railroad Earthworksopen →
- 3.8.11Trigger Inventoryopen →
- 3.8.12Rainfall Thresholds and Weather-Based Operating Protocolsopen →
- 3.8.13Diagnosing the Mechanism from the Symptomopen →
- 3.8.14Monitoring and Early-Warning Indicatorsopen →
- 3.8.15Worked Calculation Examplesopen →
- 3.8.16Practical Recommendationsopen →
- 3.8.17Failure Mechanism Assessment Checklistopen →
- 3.8.18Triggering Mechanismsopen →
- 3.8.19Determination of Current Risk: Geospatial Risk Plus Defect Ratingopen →
- 3.8.20Severityopen →
- 3.8.21Current Risk Ratingopen →
- 3.8.22Ratings: Scales and How They Are Appliedopen →
- 3.8.23Situational Ratings: Location and Inherent Site Conditionsopen →
- 3.8.24Instability Ratings: Evidence That the Ground Is Movingopen →
- 3.8.25Static Hazard Ratings: Network Exposure and the Preliminary Ratingopen →
- 3.8.26Live Ratings: Weather and River Eventsopen →
- 3.8.27Rated Elements and Rating Criteriaopen →
- 3.8.28Vegetation, Fill Plasticity and Permeability as Likelihood Modifiersopen →
- 3.8.29Rock Fall Hazard Rating for Cuts Along Trackopen →
- 3.8.30Return Period, Exposure and the Trigger and Frequency Bandsopen →
- 3.8.31Combining Probabilities: Conditional Probability, Bayes’ Theorem and Event Treesopen →
- 3.8.32Counting Hazard Events: Poisson, Exponential and Extreme-Value Distributionsopen →
- 3.8.33Small Data Sets: Confidence Limits, Sample Size and Goodness of Fitopen →
- 3.8.34Semi-Quantitative Landslide Risk Scores as a Cross-Checkopen →
- 3.8.35Acceptable Probability of Failure by Consequenceopen →
- 3.8.36Basis and Rationale of the Risk Ratingsopen →
- 3.8.37Risk Reduction Ratings: The Solutionopen →
- 3.8.38Risk Reduction Ratings: Design and Constructopen →
- 3.8.39Risk Reduction Ratings: Post-Stabilization Construction and Implementationopen →
- 3.8.40Life-Cycle Cost of Ground Hazard Mitigationopen →
- 3.8.41Worked Exampleopen →
- 3.8.42The Ground Hazard Risk Assessment Reportopen →
- 3.8.43Documenting the Rationaleopen →
- 3.8.44Limitationsopen →
- 3.8.45Case Studiesopen →
- 3.8.46Practice Questionsopen →
- 3.8.47Cross-Referencesopen →