Table 3.8-93. Related chapters and sections| Topic | Refer to |
|---|
| Risk equation, risk resolution matrix and risk control hierarchy | Sections 1.1.2, 1.1.7 and 1.1.9 |
| Mechanism, condition and trigger; trigger inventory; rainfall thresholds | Sections 3.8.1, 3.8.11 and 3.8.12 |
| Desktop data sources for the geospatial rating | Chapter 3.2; Section 3.8.23.1 |
| Scales, risk matrix and required responses | Section 3.8.22 |
| Situational and instability attributes; field indicators | Sections 3.8.23 and 3.8.24 |
| Live rating | Section 3.8.26 |
| Cost estimates for alternatives | Chapter 3.7 |
| Slope stability factors of safety | Section 6.3.5 |
| Construction monitoring and quality control | Chapter 5.3 |
| Retaining structures and ground improvement | Chapters 7.1 and 7.2 |
| Rated elements and the criteria for each level of every rating | Section 3.8.27 |
| Track substructure: fouled ballast, pumping, subgrade defects | Chapter 2.3 |
| Hazard monitoring map, river stage watchlist, live risk rating and Site Background Report | Hazard monitoring map |
| Failure mechanisms and triggers; diagnosing the mechanism | Chapter 3.8 |
| Planning the exploration | Chapter 3.9 |
| Borings and sampling | Chapter 4.1 |
| In situ testing: DCP, CPT, GPR | Chapter 5.1 |
| Groundwater, seepage and piezometers | Chapter 2.8 |
| Laboratory testing program | Chapter 5.2 |
| Slope stability analysis | Chapter 6.3 |
| Report preparation | Chapter 8.4 |