GHRM Library References

Documents in the reference library folders reviewed (03, 05, 09, 11, 15 and 16 under Geotechnical; 09 Manuals, 10 Geometrics, 12 Hydraulics and Hydrology, 13 Structural; Manuals\Geotechnical ASCE 7 and Reference; engineering titles from _books to be sorted) for the GHRM manual, with the GHRM chapters they support. Cited marks documents whose values, criteria or procedures appear in the manual, the Soil & Rock Properties Database or its chapter panels. Library files are held locally; paths are given so the original can be checked.
GHRM home · Soil & Rock Properties Database · Database sources
DocumentFolderGHRM chaptersLibrary file

Excluded from this list: personal and project working files, client project reports, proposals, rate sheets, insurance certificates, committee working drafts, internal forms, software files, image and spreadsheet files, and titles unrelated to geotechnical or railway engineering. Conference proceedings, the AREMA Manual and the ICE Manual of Geotechnical Engineering are copyrighted; only titles are listed.