This section explains why each level of each scale, and each of the five ratings, sits where it does; checks the logic of the scales and the matrix; and compares the method with published practice. It contains no project or client data. Every example in this chapter is generic.
Five is the number of field conditions an engineer can tell apart consistently from what is seen on the ground: not moving and no cause; moved before; cause present; starting to move; failing. Fewer levels would lump an emerging failure with one under way. More would ask for distinctions that visual evidence cannot support, and two engineers would disagree more often. An odd number also gives a middle level, 3, which is the default where data are missing (Section 3.8.22.1). The risk score R = F × S (1 to 25) is an intermediate number whose only job is to place the site in one of the five ratings (Table 3.8-72).
| Level | Rating | Risk score R | Matrix cells (F × S) | Required response (Table 3.8-17) |
|---|---|---|---|---|
| 5 | Severe | 20–25 | 4×5, 5×4, 5×5 | Act now |
| 4 | High | 12–16 | 3×4, 4×3, 3×5, 5×3, 4×4 | Act soon |
| 3 | Elevated | 6–10 | 2×3, 3×2, 2×4, 4×2, 3×3, 2×5, 5×2 | Plan |
| 2 | Guarded | 3–5 | 1×3, 3×1, 1×4, 4×1, 2×2, 1×5, 5×1 | Watch |
| 1 | Low | 1–2 | 1×1, 1×2, 2×1 | Routine inspection only |
The frequency index describes the state of the hazard, because that is what the engineer can see. The indicative annual frequencies attach a number to each state. The 20-year column turns the annual frequency into the chance of at least one failure over a typical planning horizon, 1 − (1 − p)20; it is the column that explains the response tied to each rating.
| F | Level | What defines it | Indicative annual frequency | Chance of ≥1 failure in 20 years | Why the level is here |
|---|---|---|---|---|---|
| 5 | Occurring | The failure is under way and the track is already affected. | 1 or more per year | Near certain | Nothing has to change for the site to fail again; it is failing now. Repeated slow orders or surfacing at the same spot are the record of it. This is the top of the scale because no further evidence of likelihood is possible. |
| 4 | Emerging | Clear signs of movement developing; defects return between surfacing cycles. | 1 in 1 to 1 in 5 years | About 99% | The ground has started to move but the track still runs. Movement that shows between surfacing cycles normally reaches failure within one or two maintenance or budget cycles, so the level spans 1 to 5 years. |
| 3 | Forming | The conditions for failure are present; the ground is not yet moving. | 1 in 5 to 1 in 25 years | About 56% to 99% | Water against the fill, an over-steepened slope or a blocked culvert means the next large storm can start movement. Storms of a 5- to 25-year return period are common enough that failure is more likely than not within a 20-year planning horizon. |
| 2 | Dormant | Past instability, no sign of present activity. | 1 in 25 to 1 in 100 years | About 18% to 56% | The site has failed before, so it can fail again, but reactivation needs a trigger larger than recent ones. That places it in the range of the storms used to size railroad drainage, about the 25- to 100-year event. |
| 1 | Inactive | No evidence of instability, or the cause has been removed. | Less than 1 in 100 years | Less than about 18% | Only an event beyond normal design conditions would cause failure. The level never reaches zero: drains clog and channels move, so an Inactive site is re-screened after major events. |
Spacing. Each level is roughly 4 to 5 times as frequent as the one below. The spacing follows the stages a failing embankment passes through, not a mathematical series; it is finer than the factor-of-10 steps used in some landslide guidance (Table 3.8-78) because most railroad ground hazards that matter fall between once a year and once a century.
Live increments. The live rating (Section 3.8.26) raises F by 1 for one indicator at Watch and by 2 for two Watch indicators or any Warning. One level is the step from “conditions present” to “signs developing”: a single wet indicator moves a site one stage along. Two levels reflect that most rain-triggered failures need both wet ground and heavy rain. Setting F to 5 for a Warning at a site already Emerging recognizes that a moving fill under flood or storm loading should be treated as failing.
The severity levels mark the points where the consequence of a failure passes from one party to the next: from the maintenance budget, to train operations, to the railroad’s service, to the safety of crews and freight, and finally to the public and the environment. Each boundary is a change in who must respond, not only in cost.
| S | Level | Who bears the consequence | Typical outage | Why the level is here |
|---|---|---|---|---|
| 5 | Catastrophic | The public and the environment | More than a week | A failure that can kill, release hazardous materials, take out a structure or reach a river, road or homes is beyond what the railroad alone can absorb. It is the top level because consequences of this kind are not recoverable by repair. |
| 4 | Critical | Train crews, equipment and freight | Several days | Derailment or loss of the main line is likely and serious injury is possible, but the damage stays mostly within the railroad corridor. The step from 3 is the step from a service problem to a safety problem. |
| 3 | Serious | The railroad’s service and its customers | Hours to a day | The track is out of service or under a restrictive slow order and trains are delayed, but no derailment is expected and damage is confined to railroad property. |
| 2 | Minor | Train operations | None to a few hours | A geometry defect needs surfacing or a temporary slow order. Operations notice it; nothing is damaged beyond the track. |
| 1 | Low | The maintenance budget | None | The effect is handled in routine maintenance and never reaches the train schedule. It is the bottom level because a failure here changes nothing but the work list. |
The band limits are set in the gaps between the possible products. R cannot be 7, 11, 13, 14, 17 to 19, or 21 to 24, so no cell sits on a boundary. Every rating therefore has a plain-language description of the cells it contains, given below, and that description is the reason for its required response.
| Level | Rating | What its cells have in common | Why the response fits |
|---|---|---|---|
| 5 | Severe | One scale is at its top level (Occurring or Catastrophic, 5) and the other at 4 or 5: cells 4×5, 5×4 and 5×5 (R 20–25). | Failure is expected within a few years or is under way, and its consequence is Critical or worse, with at least one of the two at the top of its scale. Emerging and Critical together (4×4 = 16) is High, not Severe. Waiting for the next program accepts a likely failure with injury or public harm, so protection, operating restrictions and immediate stabilization are required. |
| 4 | High | Both scales are at 3 or more and at least one is at 4 or 5, short of Severe: cells 3×4, 4×3, 3×5, 5×3 and 4×4 (R 12–16). Failure is more likely than not within the planning horizon, with at least a Serious consequence. | The site will probably fail before a normal capital cycle comes around. A slow order or increased inspection bridges the gap until stabilization in the next program. |
| 3 | Elevated | One scale is at 2 and the other at 3 to 5, or both are at 3: cells 2×3, 3×2, 2×4, 4×2, 2×5, 5×2 and 3×3 (R 6–10). That is a Dormant site with a consequence beyond maintenance, a forming or active failure with only a Minor consequence, or a Forming site with a Serious one. | There is time to plan, but not to ignore the site. Design and scheduling proceed with monitoring in place. Catastrophic sites that are only Dormant land here, so they are not dropped from the program. |
| 2 | Guarded | One scale is at 1 and the other at 3 to 5, or both are at 2: cells 1×3, 3×1, 1×4, 4×1, 1×5, 5×1 and 2×2 (R 3–5). Either the cause has been removed (F 1) or a failure would not affect trains (S 1), with the other scale at 3 or above, or both scales are at 2. | Nothing needs to be built, but the condition that keeps the rating low (a drain, a culvert, a channel position) can change. Routine inspection with defined triggers catches that change. |
| 1 | Low | One scale is at 1 and the other at 1 or 2: cells 1×1, 1×2 and 2×1 (R 1–2). | No credible failure within the planning horizon would affect operations. Routine inspection is enough. |
Tables 3.8-20, 3.8-21 and 3.8-24 describe scores 1, 3 and 5. Table 3.8-76 gives the reason each attribute is scored and descriptions for scores 2 and 4, so that every score from 1 to 5 has a written basis. Where the evidence fits neither description well, use 3 and flag the attribute for the field visit.
| Attribute | Rating | Why it is scored | Score 2 | Score 4 |
|---|---|---|---|---|
| L1 Surficial soils | Situational | Soil type sets strength loss on wetting, erodibility and how fast water drains out of the fill. | Sand and gravel with some fines; well drained | Lean clay or silt that softens when wet; poorly drained in places |
| L2 Geologic setting | Situational | What lies beneath decides whether failures are shallow or deep and whether the ground can subside. | Weathered rock over competent rock at shallow depth | Thick till, colluvium or weak shale; karst or mine workings mapped nearby but not under the track |
| L3 Slope geometry | Situational | Driving stress grows with height and steepness. Score height and steepness separately and use the higher. | Under 10 ft, slopes 2.5H:1V to 3H:1V | Slopes steeper than 2H:1V but not steeper than 1.5H:1V |
| L4 Hydrology | Situational | Water at the toe is the most common trigger of railroad embankment failure. | Intermittent ditch flow away from the toe; outside the 500-year floodplain | Stream within about 50 ft of the toe, or in the 100-year floodplain without flow against the fill |
| L5 Drainage condition | Situational | Blocked or undersized drainage holds water in and against the fill. | Minor sediment or vegetation in ditches; culverts open | Culvert half blocked, damaged or of unknown capacity; ponding seen in imagery |
| L6 Historic instability | Instability | Past movement is the best single predictor of future movement. | Landslide-prone formation mapped, but no instability recorded at or near the site | Documented failure at the site within about 20 years, or an old scarp visible in lidar |
| C1 Track and traffic | Situational (consequence) | Traffic sets how many trains are exposed and what an outage costs. | Lightly used branch line or siding | Main line with moderate traffic |
| C2 Train type | Situational (consequence) | Passengers and hazardous materials turn a derailment into public harm. | No passenger trains; hazardous materials limited to infrequent cars | Regular hazardous materials traffic, or occasional passenger trains |
| C3 Below and beside the track | Situational (consequence) | What a failure would reach once it leaves railroad property. | Railroad or private land with minor drainage | A local road, a stream with fisheries value, or a few dwellings within reach |
| C4 Size of failure | Situational (consequence) | Volume sets repair time and whether the track is lost entirely. | Fill 5 to 10 ft | Fill 20 to 30 ft |
| C5 Redundancy and recovery | Situational (consequence) | Outage length is what the railroad and its customers actually feel. | Parallel route; repair within a day | Long detour; repair in about a week |
The scales and the matrix were checked against the properties a rating method should have. The results, and the limits of the method, are in Table 3.8-77.
| Check | Result | What to do |
|---|---|---|
| Every scale increases with its number | Yes. All attribute scores, F, S and the five ratings run 1 (lowest risk) to 5 (highest). Tables 3.8-14 and 3.8-15 list the highest level first for reading only. | None. Stated in Section 3.8.22.1. |
| All 25 cells of the matrix carry exactly one rating; the bands do not overlap or leave gaps | Yes. R can only take the values 1, 2, 3, 4, 5, 6, 8, 9, 10, 12, 15, 16, 20 and 25; the band limits fall in the gaps between them. | None. |
| Raising F or S never lowers the rating | Yes, for every cell. | None. |
| A Catastrophic site stays Elevated or above until Inactive; a Low-severity site never exceeds Guarded | Yes. | None. |
| The matrix favors consequence over frequency | No. Because F × S is symmetric, a step in F counts exactly as much as a step in S. The extra weight on consequence comes from three rules: the C floor (a 5 on C2 or C3 sets C at 4 or more), “the consequence governs” in Table 3.8-15, and the engineer’s one-level raise. | Apply those three rules every time (Section 3.8.22.4). |
| R measures risk in proportion | No. F and S are ordered levels, not measured quantities, so R = 10 is not twice the risk of R = 5. F levels are roughly 4 to 5 times apart in frequency; S levels are not quantified. | Use R only to place a site in a rating. Within a rating, rank sites by F, then S, or by L × C for preliminary ratings. |
| Desktop Fp means the same as field F | Close. Both are read from Table 3.8-11 using Fg and a defect rating; the desk D comes from the records and the field D from what is seen. | Without defects Fp is capped at Forming (3), so susceptibility alone cannot rate a site as moving. Where the field D differs from the desk D, record why (Section 3.8.24.6; Section 3.8.24.3). The separate situational and instability scores on the report make this visible. |
| Rounding of L and C is defined | Yes. | Round half up: 2.5 becomes 3. |
| L3 is unambiguous when height and steepness disagree | Yes. | Score height and steepness separately and use the higher. |
| The live rating stays on the same scales | Yes. It raises F only, to a maximum of 5, and reads the same matrix; S never changes with the weather. | None. |
Table 3.8-78 compares the GHRM ratings with six published methods: three that agree with its main features and three that do not.
| Source | Method | Position | Where it agrees with GHRM | Where it differs |
|---|---|---|---|---|
| Australian Geomechanics Society (2007), Practice Note Guidelines for Landslide Risk Management, Appendix C | Likelihood levels with indicative annual probabilities, five consequence levels, and a risk matrix read by lookup | Agrees | Five risk levels (Very Low to Very High), each tied to a defined response; likelihood levels tied to annual frequency; risk skewed toward consequence | Six likelihood levels a factor of 10 apart; consequence numbered 1 = Catastrophic; no multiplication |
| NCHRP Research Report 884 (2018), Guidelines for Managing Geotechnical Risks in Design–Build Projects, Ch. 2.1 | Qualitative geotechnical risk analysis with frequency and impact each rated 1 to 5 | Agrees | 1-to-5 scales increasing with risk; ratings combined to rank risks in a register for mitigation | Written for project delivery risk, not for operating ground hazards |
| FTA (2019), Sample Safety Risk Assessment Matrices for Rail Transit Agencies | Likelihood and severity combined in a matrix; risk levels tied to acceptance and action | Agrees | Rail safety practice of combining likelihood and severity, with the required action set by the rating; likelihood calibrated to frequency | 4 severity by 5 likelihood levels; three risk levels; severity numbered 1 = most severe; lookup, not product |
| Cox (2008), “What’s Wrong with Risk Matrices?” Risk Analysis 28(2) | Mathematical critique of risk matrices | Disagrees | Accepts matrices where the embedded judgments are explained, which this section does | Shows matrices have poor resolution, can rank a smaller risk above a larger one, and depend on arbitrary category boundaries |
| FHWA (2019), Unstable Slope Management Program for Federal Land Management Agencies, FHWA-FLH-19-002 | Exponential category scores of 3, 9, 27 and 81, summed into hazard and risk totals | Disagrees | Scores many terrain, drainage and exposure factors from field and desktop data, as the situational attributes do | No matrix; scores are added, and the exponential points let one severe factor dominate; condition reported as Good, Fair or Poor |
| U.S. Department of Defense (2012), MIL-STD-882E, System Safety | Severity category and probability level combined into a Risk Assessment Code read from a matrix | Disagrees | Risk is a combination of severity and probability, with acceptance authority set by the risk level | Four severity categories against six probability levels; four risk levels (High, Serious, Medium, Low); severity numbered 1 = Catastrophic |
Where GHRM goes further. None of the six sources ties the rating to track geometry defect history, to a desktop study that sets each site’s water thresholds, or to a live rating driven by river, rainfall and soil moisture data. These are additions specific to railroad ground hazards and are not covered by the published methods.
Numbering. Several published methods number severity in the opposite direction (1 = most severe). When translating a GHRM rating into another agency’s matrix, reverse the severity number: GHRM S = 5 corresponds to their category 1.