10This chapter sets out how a ground hazard or geotechnical assignment is scoped and proposed. It follows the proposal from the first request through the desktop look, the boring layout, the subconsultant quotes and the cost estimate to the assumptions that go out with the fee. The examples are drawn from recent railroad proposals (an intermodal parking expansion on filled marshland and a siding re-grade on steep embankment slopes), with client details removed.
- 3.1.0Purpose and Overviewopen →
- 3.1.1Understanding the Requestopen →
- 3.1.2Scope of Services and Deliverablesopen →
- 3.1.3Assumptions, Exclusions and Limitationsopen →
- 3.1.4Schedule and Phasingopen →
- 3.1.5Fee Basisopen →
- 3.1.6Risk Allocation and Contract Termsopen →
- 3.1.7Proposal Review Checklistopen →
- 3.1.8Cross-Referencesopen →
- 3.1.9Apps and Tools 5open →