A hypothetical main line fill, used only to illustrate the method. Alternative A assumes a subsurface investigation and analysis have been completed, so it earns full credit under Table 3.8-80.
At a 22-ft fill of lean clay across a creek, a partly blocked 48-in. culvert makes the fill susceptible to softening and slope movement by a drainage-driven mechanism. The site was buttressed with a berm 15 years ago; today the track has been surfaced twice in 12 months and a bulge is forming downstream. The current risk is rated, and three alternatives are carried through the three risk reduction stages of Sections 3.8.37 to 3.8.39.
| Variable | Value | Description |
|---|---|---|
| L1–L5, weights | 4, 3, 3, 4, 5; L5 weighted 2 | Lean clay fill; creek near the toe; blocked culvert |
| L6 | 3 | Past berm 15 years ago |
| T | 4 | Ponding about every 3 years |
| D | 4 | Same defects return between surfacing cycles; fresh bulge |
| S | 4, Critical | Main line, moderate to heavy freight |
| Alternatives | A: replace culvert (100-yr), toe drain and berm; B: clean culvert only; C: monitoring with slow orders | Investigation complete for A: full credit (Table 3.8-80) |
Table 3.8-83 records the current-risk inputs as they appear on the report.
| Input | Value | Reason |
|---|---|---|
| L1 to L5 (L5 weighted 2), L6 | 4, 3, 3, 4, 5 (×2), 3 | Lean clay fill; creek near the toe; blocked culvert; past berm |
| L | (4 + 3 + 3 + 4 + 10 + 3) / 7 = 3.86 → 4 | Equation 3.8-2 |
| T | 4 | Ponding about every 3 years |
| Fg | lesser of 4 and 4 = 4 | |
| D | 4 | Same defects return between surfacing cycles; fresh bulge |
| Fc | 4 (Table 3.8-11) | Evidence governs; no amplification (Fg is not ≥ D + 1) |
| S | 4 Critical | Main line, moderate to heavy freight traffic |
| Current risk | Rc = 16, High | Act soon: slow order or increased inspection; stabilize in the next program |
| Stage | A. Replace culvert (100-year capacity), toe drain and berm | B. Clean culvert only | C. Monitoring with slow orders |
|---|---|---|---|
| Solution | T 4→1, L5 5→1; D expected 1; Fsol = 1; S = 4; R = 4 Guarded | T 4→3, L5 5→3; L = 3; Fg = 3; D stays 4 until movement stops; Fsol = 4; R = 16 High (interim) | F unchanged 4; S 4→3 while the response is in force; R = 12 High (interim) |
| Design and construct | Culvert for 100-year event; slope FS 1.5 with drained berm: Fdes = 1. Culvert trench through fill: Fcon = 5; with track out of service S = 3; R = 15 High for the work window | No design; maintenance item: Fdes = Fsol | Not applicable |
| Post-stabilization | Provisional Fpost = 2; R = 8 Elevated. After one wet season with no movement and a culvert maintenance plan: Fpost = 1; R = 4 Guarded | R = 16 High until defects stop | R = 12 High while in force |
| Risk reduction | High (16) to Guarded (4): 2 levels, 12 points, once verified | None while defects continue | None in F; one level in S, interim only |
The site is High (16). Alternative A reaches a verified Guarded (4), a reduction of 12 points and two levels; B and C remain High and are interim. A is the only alternative that acts on the trigger and the resistance, and the only one that reaches a verified Guarded rating. B treats part of the trigger but not the movement already under way, so the defects, and the rating, stay. C manages exposure while a permanent fix is designed and is labeled interim.