Risk ratings (Sections 3.8.18 to 3.8.47) put sites in order so that money goes first where it does the most good. For rock cuts the established system is the Rock Fall Hazard Rating System (RHRS). Pierson and others developed it in 1990 from earlier work by Brawner and Wyllie (1975) and Wyllie (1987), and Wyllie and Mah summarize it in their Chapter 12. Each category is scored 3, 9, 27 or 81 points, and measured categories fall on a continuous scale between those values. The exponential scale makes the worst sites stand out. The highway system has nine categories. For track, two of them (decision sight distance and roadway width) have no equivalent, and average vehicle risk becomes the share of time a train occupies the section.
| Category | 3 points | 9 points | 27 points | 81 points |
|---|---|---|---|---|
| (a) Slope height | 25 ft | 50 ft | 75 ft | 100 ft |
| (b) Ditch effectiveness | Good catchment | Moderate | Limited | No catchment |
| (c) Exposure (% of time occupied) | 25% | 50% | 75% | 100% |
| (f) Geologic character, case 1: structure | Discontinuous joints, favorable | Discontinuous, random | Continuous, adverse | Continuous, adverse, persistent |
| (f) Geologic character, case 1: friction | Rough, irregular | Undulating | Planar | Clay infilling or slickensided |
| (g) Block size | 1 ft | 2 ft | 3 ft | 4 ft |
| (h) Climate and water | Low precipitation, no freezing, dry | Moderate, short freezing or intermittent water | High precipitation or long freezing or continual water | High precipitation and long freezing |
| (i) Rock fall history | Few falls | Occasional | Many | Constant |
Measured categories score 3x; for example 3H/25 for height in feet. Case 2 (differential erosion) replaces the two case 1 entries where erosion controls the falls.
Equation 3.8-5. Train exposure (adapted from average vehicle risk)
The continuous scores agree with Wyllie and Mah's examples. Their highway example, 7,000 vehicles a day over 0.2 km at 90 km/h, gives an average vehicle risk of 65% (64.8% before rounding); the formula scores that 17, against the 18 read from the RHRS chart. Their sight-distance example (52% of the decision distance) gives 3(120 − 52)/20 = 42, the same as published. Each slope also receives an inspection rating (Urgent, Priority, Observe or Okay), and that rating sets the permissible actions in Wyllie and Mah's Table 12.5. An Urgent or Priority slope may never be assigned no action.
A 60 ft cut over 800 ft of single track carries 30 trains a day averaging 7,000 ft at 40 mph. Each train occupies the section for about two minutes, so trains are present 4.6% of time and the exposure score is low. The cut has limited ditch catchment, continuous adverse joints with undulating surfaces, 2 ft blocks, continual seepage and occasional falls, and rates 123. The ditch, the jointing and the water are the largest contributors. Those are what a ditch widening, scaling or drainage project would change. Low train exposure does not make a cut safe: one block on the rail can derail the next train.
Open the rock fall rating calculator →
RHRS-based scoring of a rock cut along track, with continuous scores for height, train exposure and block size, the category breakdown, and the inspection rating with its permissible actions.
Wyllie and Mah set the rating inside a seven-step program for transportation agencies. The program inventories and rates every slope, picks the highest priorities each year, designs and builds the work under a contract flexible enough for conditions found during construction, updates the database with falls and repairs, and re-rates. Because conditions get worse over time and nobody can re-rate hundreds of cuts every year, they add an annual inspection of the higher-priority slopes. Each inspected slope gets an inspection rating, and the rating limits which actions are allowed.
| Inspection rating | Typical condition | Permissible actions |
|---|---|---|
| Urgent | Obvious recent movement or falls; a kinematically feasible block large enough to be a hazard; weather working against stability; failure possible within months | Limit service and work within one month, or follow-up inspection |
| Priority | Likely movement since the last inspection of a block large enough to be a hazard; failure possible within about two years | Work in the current year, follow-up inspection, or work in one to two years |
| Observe | Possible recent movement, no imminent instability | No action; check specific conditions at the next inspection |
| Okay | No evidence of movement | No action |
Urgent and Priority slopes may not be assigned no action.
| Reinforcement | Rock removal | Protection |
|---|---|---|
| Rock bolts and dowels | Resloping | Ditches |
| Tied-back walls | Trimming | Mesh |
| Shotcrete | Scaling | Catch fences |
| Buttresses, including shot-in-place | Warning fences | |
| Drainage | Rock sheds and tunnels |
Where the face is steep and the toe is close to the track, there is no room for a ditch or barrier, so removal, bolting or mesh become the practical choices.
Three cuts on one subdivision were rated with the calculator at the same train traffic. Cut A is the worked example. Cut B is 100 ft high with no catchment, 3 ft blocks and constant falls. Cut C is 35 ft high with a good ditch, random jointing, moderate climate, 1 ft blocks and few falls. The exponential scoring separates them sharply. Cut B scores about eight times Cut C, although none of its categories is more than 27 times Cut C's. That separation is what the system is designed to produce.
| Cut | Score | Rank |
|---|---|---|
| Cut B: 100 ft, no catchment, constant falls | 334 | 1 |
| Cut A (default) | 123 | 2 |
| Cut C: 35 ft, good ditch, few falls | 42 | 3 |
Paraphrased from these documents in the reference library.
Probability and statistics behind the ratings: combining probabilities and updating them with Bayes’ theorem in Section 3.8.31; event counts, Poisson rates and annual maxima in Section 3.8.32; confidence limits, number of tests and records with no failures in Section 3.8.33.