15This chapter covers how geotechnical and ground hazard cost estimates are built: the task structure, labor hours, subconsultant quotes, travel and expenses, the checks to make before an estimate goes out, and the stabilization construction costs used to compare risk reduction alternatives. It follows the cost estimate workbook used in practice, task for task.
- 3.7.0Purpose and Overviewopen →
- 3.7.1Task Structureopen →
- 3.7.2Field Exploration Costsopen →
- 3.7.3Laboratory Testing Costsopen →
- 3.7.4Travel and Expensesopen →
- 3.7.5Engineering and Reporting Laboropen →
- 3.7.6Checking the Estimateopen →
- 3.7.7Stabilization Construction Costsopen →
- 3.7.8Contingency and Escalationopen →
- 3.7.9Budget Trackingopen →
- 3.7.10Cross-Referencesopen →
- 3.7.11Apps and Tools 4open →
- 3.7.12Track Section Quantities for Estimatesopen →
- 3.7.13Earthwork Volumes, Shrinkage and Haulopen →
- 3.7.14State Cost Database for Geotechnical Design and Constructionopen →
Apps
3 appsChapter 3.7 · Section 3.7.14Geotechnical Cost Database by StateUnit costs for 160+ design and construction items in every state, with published state DOT prices, a location factor, and an estimate builder with mobilization, contingency and escalation.Chapter 3.7 · Section 3.7.12Track Section QuantitiesBallast and subballast volume and tonnage from the typical section, with undercut and replacement of plastic subgrade and rock in cuts.Chapter 3.7 · Section 3.7.13Earthwork Volumes, Shrinkage and HaulAverage-end-area and prismoidal volumes from stations, shrinkage, swell, waste or borrow, truckloads and the mass diagram.