Subsections
11This chapter covers the field reconnaissance: planning and safety, what to look for on the track, slopes and drainage, how to document it with geotagged photographs and flagging, and how the findings are reported. The reconnaissance feeds the site conditions write-up (Chapter 3.5), the access study (Chapter 3.6), the drilling scope (Chapter 3.3) and the field risk assessment of Chapter 3.8.
- 3.4.0Purpose and Overviewopen →
- 3.4.1Planning the Visitopen →
- 3.4.2Track Observationsopen →
- 3.4.3Slope, Embankment and Cut Observationsopen →
- 3.4.4Drainage Observationsopen →
- 3.4.5Documentationopen →
- 3.4.6Talking With Track Forcesopen →
- 3.4.7Reconnaissance Summaryopen →
- 3.4.8Cross-Referencesopen →
- 3.4.9Recognizing Rock Structure and Screening Cut Slopesopen →
- 3.4.10Block Toppling of Rock Cutsopen →
Apps
4 appsChapter 3.4 · Section 3.4.9Rock Slope Kinematic ScreenKinematic screening of a rock face for planar sliding, wedge sliding along joint intersections, and toppling, with intersection lines and apparent dips computed and plotted.Chapter 3.4 · Section 3.4.10Rock Block TopplingGoodman and Bray toppling analysis block by block, from slope geometry or entered block heights: forces, modes, the toe force P0, the friction angle for limiting equilibrium, the factor of safety and the toe anchor force.Chapter 3.4 · Field toolPhoto Album to KMZTurns a shared photo album (download zip, loose photos or a Takeout export) into a Google Earth KMZ with one pin per photo at its GPS location, the photo in the balloon, date folders, the walk path and camera direction.Chapter 3.4 · Desktop toolPlan Set PDF to KMZReviews a plan set PDF sheet by sheet and converts plan views to georeferenced overlays, profiles to curtains along the alignment and cross sections to curtains at their stations, prompting for control points, datum or scales it cannot read.