The situational rating describes what the site’s location and inherent physical conditions make possible, before any evidence of movement is considered. Two embankments may both look sound today, yet one is a 30-ft fill of plastic clay with a river against its toe and the other a 6-ft fill of clean gravel on level ground. The situational rating separates them. It answers two of the questions a desktop study must answer: what is the site, and what could fail, and why.
The situational rating has two halves. The situational likelihood (attributes L1 to L5) scores how susceptible the ground is to failure because of its soils, geology, slope geometry, water and drainage. The consequence (attributes C1 to C5) scores what a failure would reach because of the track, the traffic and what lies below and beside it. Both are fixed by where the site is and how it was built; neither depends on whether the ground is moving now. That is the subject of the instability rating in Section 3.8.24.
The situational rating is made at the desk, before anyone goes on track. For a single urgent site it can be done in an afternoon; for a program of dozens of sites it is done for all of them first, so that field time goes where the risk is.
Start with the railroad’s own records; they are the only source of track structure, construction history and drainage inventory. Then build the site picture from public data. The hazard monitoring map assembles most of the public layers in Table 3.8-19 for a site circle and can generate a Site Background Report with a KMZ of the layers used. The railroad’s defect, slow order and repair records, and the event and ground movement layers, are used in the instability rating (Section 3.8.24); they are listed here because they are collected in the same pass.
| Category | Typical sources | What it shows | Feeds |
|---|---|---|---|
| Railroad records | Track charts and valuation maps; track geometry exception reports; slow order history; maintenance, surfacing and ballast records; drainage structure inventory; past reports and photos; inspector and roadmaster notes | Track, curvature, grade, original construction, fill and cut limits, defect frequency, what has been repaired and when | Situational (setting, C1–C5); Instability (L6, defect history) |
| Topography | USGS 3DEP lidar and elevation models; hillshade and slope maps; historic topographic maps | Fill and cut heights, slope angles, scarps, hummocky ground, drainage paths, channel position relative to the toe | Situational (L3); Instability (scarps for L6) |
| Geology and soils | State geologic maps; NRCS soil survey (SSURGO); USGS landslide inventory and susceptibility; karst maps; abandoned mine land and mine map inventories | Soil type and drainage class, shrink-swell, depth to rock, landslide-prone formations, karst, undermining | Situational (L1, L2) |
| Hydrology | FEMA flood maps (NFHL); NHD and StreamStats drainage areas; NOAA Atlas 14 rainfall; dam inventory (NID); river gauges and high-water marks | Floodplain position, contributing drainage area, design rainfall, upstream dams, how high water has actually reached | Situational (L4, H&H thresholds); Live (gauge pairing) |
| Imagery | Historical aerial photographs; Google Earth historical imagery; NAIP; Sanborn maps | Changes in channel, drainage, vegetation, slope face and adjacent land use over time | Situational (L5, setting); Instability (L6) |
| Event history | NOAA Storm Events and local storm reports; NWS damage surveys; FRA accident and incident data; USGS high-water marks; ice jam database; FEMA disaster declarations | Floods, washouts, slides, storms and rail accidents near the site, with dates | Instability (L6); H&H thresholds |
| Current conditions | Soil moisture percentile; antecedent rainfall; frost depth; drought monitor; river stage | Whether the ground is wetter or the river higher than normal now | Live rating; timing of the field visit |
| Ground movement | Satellite radar (InSAR) displacement where available | Measured settlement or creep since 2016 | Instability (L6) |
Most ground hazards on a railroad are the delayed result of how the line was built, so the situational review begins with the setting and its history, oldest first.
The record of what has already gone wrong at the site (past slides, repairs, defects and the events that triggered them) completes the history, but it is evidence of instability rather than situation and is reviewed in Section 3.8.24.
From the setting and the terrain, assign the driving mechanism: the process most likely to cause failure. It decides which situational attribute carries the most weight (Section 3.8.23.4), which H&H thresholds are needed (Section 3.8.23.7), which live indicators apply (Section 3.8.26) and which stabilization items to expect in the field (Section 3.8.42). The mechanisms follow Chapter 3.8:
Where two mechanisms act together (for example, scour that oversteepens the toe and then a slope failure), record both and name the one that starts the sequence as primary. The instability evidence gathered in Section 3.8.24 may confirm or change this choice; the field visit settles it.
The situational likelihood is deterministic: each attribute is scored 1 to 5 against the fixed descriptions in Table 3.8-20, so two engineers working from the same data reach the same score. Score from the evidence in hand; where the data are missing, score 3 and flag the attribute for the field visit. Scores of 2 and 4 fall between the descriptions; written descriptions for them are in Table 3.8-76 (Section 3.8.36.5).
| Attribute | Score 1 | Score 3 | Score 5 | Main sources |
|---|---|---|---|---|
| L1 Surficial soils | Rock, or clean, well-drained sand and gravel | Silty or clayey sand, low-plasticity silt or clay; moderately drained | High-plasticity or organic clay, loess, sensitive or collapsible soil; poorly drained; softens when wet | Soil survey, geologic map, past boring logs |
| L2 Geologic setting | Competent rock at or near the surface | Weathered rock or till at moderate depth | Deep weak overburden, colluvium, mapped landslide-prone formation, karst or undermining | Geologic map, landslide inventory, karst and mine maps |
| L3 Slope geometry | Fill or cut under 10 ft, slopes flatter than 3H:1V | Fill or cut 10 to 30 ft, or slopes about 2H:1V | Fill or cut over 30 ft, slopes steeper than 1.5H:1V, or a sidehill fill | Lidar, track charts |
| L4 Hydrology | No contributing flow; well above any floodplain | Ditch or small-stream flow along the toe; in or near a 500-year floodplain | Stream or river against the toe; in the 100-year floodplain; convergent flow or ponding against the fill | Flood maps, drainage area, imagery, gauges |
| L5 Drainage condition | Ditches and culverts free-draining and adequate | Partly obstructed ditches or an aging culvert; some sediment | Blocked or undersized culvert, no outlet control, record of overtopping, beaver activity | Drainage inventory, imagery sequence, maintenance records |
For L3, score height and steepness separately and use the higher. Each attribute carries a weight of 1, except the attribute that matches the driving mechanism, which carries a weight of 2: L4 for scour-driven, L5 for drainage-driven, L3 for slope-driven, L1 for subgrade-driven, and L2 for subsidence-driven or rock and debris. The situational likelihood is the weighted average:
LS = Σ (wi · Li) / Σ wi, i = 1 to 5
LS is kept to two decimals; it is combined with the instability attribute in Section 3.8.24 before any rounding.
The consequence attributes describe what a failure would do. They are the situational half of the rating that sets hazard severity, and they draw on the exposure that will be confirmed in Block 1 of the report (Section 3.8.42.4).
| Attribute | Score 1 | Score 3 | Score 5 |
|---|---|---|---|
| C1 Track and traffic | Industry, yard or out-of-service track | Main line with light traffic, or a busy siding | Main line with heavy tonnage or high speed; multiple main tracks |
| C2 Train type | No passenger or hazardous materials traffic | Occasional hazardous materials | Passenger trains or a key hazardous materials route |
| C3 Below and beside the track | Open land on railroad property | A road, a small stream or farmland | A river, highway, dwellings, utilities or a water supply |
| C4 Size of failure | Fill under 5 ft; failure would be shallow | Fill 10 to 20 ft | Fill over 30 ft, or a culvert or structure under high fill |
| C5 Redundancy and recovery | Parallel route; repair within a shift | Detour available; repair in days | No detour; difficult access; outage longer than a week |
The consequence value C is the average of C1 to C5, with one floor: a 5 on C2 or C3 sets C at no less than 4, because a failure that can reach passengers, a hazardous materials release or the public governs regardless of the other attributes. Round C half up (2.5 becomes 3) to the nearest whole number to give the preliminary hazard severity Sp on the scale of Table 3.8-15. Sp is the situational rating’s contribution to severity; it is carried unchanged into the static rating (Section 3.8.25) and printed on the report for the EIC to confirm.
For every site whose driving mechanism involves water (scour, drainage, and most slope and subgrade failures), the situational review also sets the site’s water thresholds: the conditions at which this particular embankment, culvert or toe starts to be loaded beyond what it normally carries. They are a property of the location, like the attributes above, and they are what make a live rating possible (Section 3.8.26): live weather and river data mean little until they are compared with what the site can take.
| Threshold | How it is set | Sources |
|---|---|---|
| Paired gauge and toe stage | Choose the nearest gauge on the same stream that responds to the same storms. Relate its stage to the elevation of the embankment toe, the culvert outlet and the lowest point of the subgrade, from lidar and, where available, surveyed high-water marks. Record the gauge stage at which water reaches the toe (toe stage) and the stage at which damage has occurred (damage stage). | NWS and USGS gauges, flood categories, lidar, high-water marks, railroad event records |
| Culvert capacity storm | From the drainage area, time of concentration and the culvert size and condition, estimate the return period the culvert passes without heading up against the fill (culvert hydrology, Section 3.5.10). Convert it to a rainfall depth for the critical duration (typically 1 to 24 hours) with Atlas 14. | StreamStats or lidar drainage area, drainage inventory, NOAA Atlas 14 |
| Site rainfall threshold | The 24-hour rainfall at or above which the site has historically responded (defects, slow orders, slides, overtopping). Where there is no history, start at the 2-year 24-hour Atlas 14 depth, or the culvert capacity storm if that is lower. | Event and defect history matched against rainfall records; Atlas 14 |
| Antecedent wetness | The soil moisture percentile or 30-day rainfall (percent of normal) that preceded past failures. Where there is no history, use the 80th soil moisture percentile. | Soil moisture percentile, antecedent rainfall |
| Freeze-thaw and snowmelt | For northern sites, whether the site has failed during thaw or rain-on-snow, and the frost depth or snowpack that preceded it. | Frost depth, freezing index, snow water equivalent |
The thresholds are first estimates. They are printed on the report so the field visit can check the toe, outlet and culvert elevations, and every later event refines them (Section 3.8.26.6).
The site of Example 3.8-3, scored at the desk before the visit from lidar, the soil survey, an old boring, the floodplain map and imagery.
| Attribute | Score | Weight | Basis |
|---|---|---|---|
| L1 Surficial soils | 4 | 1 | Lean clay that softens when wet |
| L2 Geologic setting | 3 | 1 | Alluvium over weathered shale at moderate depth |
| L3 Slope geometry | 3 | 1 | 25-ft fill, slopes about 2H:1V |
| L4 Hydrology | 5 | 1 | Creek against the toe; 100-year floodplain |
| L5 Drainage condition | 4 | 2 | Culvert half blocked; ponding seen in imagery |
| LS = (4 + 3 + 3 + 5 + 2 × 4) / 6 = 23 / 6 = 3.83 | |||
| C1 Track and traffic | 4 | — | Main line, 28 trains a day |
| C2 Train type | 4 | — | Regular hazardous materials traffic |
| C3 Below and beside | 3 | — | Small stream and farmland |
| C4 Size of failure | 4 | — | Fill 20 to 30 ft |
| C5 Redundancy | 3 | — | Detour available; repair in days |
| C = (4 + 4 + 3 + 4 + 3) / 5 = 3.6; no floor applies (no 5 on C2 or C3); Sp = 4, Critical | |||
Drainage-driven mechanism; LS = 3.83; C = 3.6, giving Sp = 4, Critical. On its situation alone, this is a susceptible site carrying a Critical consequence. What the situation cannot say is whether the ground has started to move. That is the job of the instability rating (Example 3.8-5).