Typical values, ranges and laboratory testing reference from the reference library, in English units, with source, table and page for every value.
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Notes | Source |
|---|
Typical in bold. Where a source gives no typical value, it is the midpoint of the range (geometric mean for permeability). A blank Low or High means the source gives only a bound.
Laboratory and field tests from the reference library's Material Lab Testing and Field Testing folders: what each measures, how it is used in design, specimen requirements and precision (d2s = acceptable difference between two results). Typical results and ASTM precision values are in the Laboratory test results and Laboratory test precision groups; CPT values are in the Field testing (CPT) group. ASTM procedures themselves are not reproduced – use the standard.
| Category | Test | Standard | Measures | Design use | Specimen & procedure notes | Precision |
|---|
| Topic | Estimate | Correlation | Limits / notes | Source |
|---|
| Key | Citation | Library file | Records |
|---|
Unit conversions: kN/m³ × 6.366 = pcf; kPa × 20.885 = psf; MPa × 20.885 = ksf; MPa × 145.04 = psi; m/s × 100 = cm/s; m²/yr × 10.764 = ft²/yr; m²/MN ÷ 20.885 = ft²/kip.