Subsections
11This chapter covers how the drilling scope is set from the desktop study and reconnaissance: boring layout, depths, sampling and in situ testing, groundwater observations, laboratory quantities, and the railroad constraints on drilling near track. It ends with the request for proposal (RFP) sent to contract drillers and the contingencies that keep the estimate honest.
- 3.3.0Objectives of the Explorationopen →
- 3.3.1Boring Layout and Spacingopen →
- 3.3.2Boring Depth Criteriaopen →
- 3.3.3Sampling and In Situ Testingopen →
- 3.3.4Groundwater Observation and Instrumentationopen →
- 3.3.5Railroad Constraintsopen →
- 3.3.6Drilling Methods and Equipmentopen →
- 3.3.7The Request for Proposal to Contract Drillersopen →
- 3.3.8Laboratory Program, Quantities and Contingenciesopen →
- 3.3.9Cross-Referencesopen →
- 3.3.10Pipeline and Casing Crossings Under Trackopen →