3.8.22 Ratings: Scales and How They Are Applied

Rating ground hazard risk now, and how much each solution will reduce it: triggering mechanisms, current risk, and risk reduction ratings.
Author: Daniel P. Colwell
3.8.22 Ratings: Scales and How They Are Applied

Every rating in this chapter is built from two questions: how likely is the ground to fail, and how bad would a failure be? The first is answered by the frequency index (F); the second by the hazard severity (S). Each is scored on five levels, and the two are combined into a risk score and a risk rating. The situational, instability, static and live ratings in the sections that follow are not separate systems: they are different ways of arriving at F and S, and they all end on the same matrix. A site rated Elevated at the desk, on a live map or on the field form means the same thing in every case. Figure 3.8-39 shows how the pieces fit together.

InputsTrigger Twhat sets it off (3.8.18)Situational L1–L5soils, geology, slope, waterInstability L6past movement (3.8.24)Defect rating Dtrack and field (3.8.19)Consequence C1–C5track, traffic, settingGeospatial F​gL1–L6, no higherthan T (Eq. 3.8-2)Current F​cF​g with D(Eq. 3.8-3, Table 3.8-11)Severity S(3.8.20)R = F × Srisk score 1–25(3.8.22.4)RatingTable 3.8-16and responseTable 3.8-17The same F, S and matrix are used again forLive ratingF​live = F​0 + increment from gauges,rain, soil moisture, thaw (3.8.26)Risk reductionF​sol → F​des, F​con → F​postsolution, design, verified (3.8.37–3.8.39)Desk: from records(preliminary F​p, S​p)Field: confirmedon the report (3.8.42)
Figure 3.8-39. How the ratings fit together. Every rating in the chapter is a route to the same frequency index F and severity S, combined on one matrix. The live rating and the risk-reduction ratings reuse F, S and the matrix.

3.8.22.1 The 1-to-5 Convention

Every scale in this chapter runs from 1 to 5, and risk increases with the number. This holds for the situational and instability attributes (L1 to L6 and C1 to C5), the frequency index, the hazard severity, the live frequency index and the risk rating itself. Where the evidence for an attribute is missing, it is scored 3, the middle of the scale, and flagged for the field visit. Table 3.8-13 shows where each scale is used.

Table 3.8-13. The rating scales and where each is used
ScaleSymbolRangeSet fromSection
Situational likelihood attributesL1–L51–5 eachLocation and inherent conditions: soils, geology, slope, hydrology, drainage3.8.23
Consequence attributesC1–C51–5 eachTrack, traffic, train type, what lies below, size of failure, redundancy3.8.23
Instability attribute and defect ratingL6, D1–5 eachPast failures; geometry defects, slow orders and field indicators (Table 3.8-10)3.8.24
Frequency indexF (preliminary Fp)1–5Geospatial frequency Fg (L1–L6 bounded by trigger rating T) with defect rating D, Table 3.8-11; desk D from records, field D from indicators3.8.22.2, 3.8.24, 3.8.25; 3.8.19
Hazard severityS (preliminary Sp)1–5Desk: C1–C5. Field: exposure confirmed in Block 13.8.22.3, 3.8.23
Live frequency indexFlive1–5F raised by live weather, river and ground data3.8.26
Risk scoreR = F × S1–25Product of the two scales; used only to place the site in a rating3.8.22.4
Risk rating—Low (1) to Severe (5)Risk matrix, Table 3.8-163.8.22.4

3.8.22.2 Frequency Index (F)

The frequency index describes the state of the hazard, which sets how often a failure can be expected. The worksheet calls this scale the Annual Failure Frequency Index. It is selected from the evidence of instability (Section 3.8.24); the indicative annual frequencies in Table 3.8-14 help when two levels seem to fit.

Table 3.8-14. Frequency index levels
LevelFField evidenceIndicative annual frequency of failure
Occurring5Failure under way: movement, settlement or erosion is active and the track is already affected; repeated slow orders or surfacing1 or more per year
Emerging4Clear signs developing: fresh tension cracks, a growing bulge, or geometry defects that return between surfacing cyclesAbout 1 in 1 to 1 in 5 years
Forming3Conditions for failure present (water against the embankment, an over-steepened slope, a blocked culvert), but the ground is not yet movingAbout 1 in 5 to 1 in 25 years
Dormant2Evidence of past instability, but no sign that it is active now; a trigger such as extreme rainfall could reactivate itAbout 1 in 25 to 1 in 100 years
Inactive1No evidence of instability, or the cause has been removedLess than 1 in 100 years

3.8.22.3 Hazard Severity (S)

The hazard severity describes the consequence if the failure happens. It is judged from the exposure of the site: traffic, speed, train type, the number of tracks, the population density factor and what lies below and beside the track. At the desk it comes from the consequence attributes of Section 3.8.23; in the field it is confirmed from Block 1 of the report. Where the consequence and the typical setting point to different levels, the consequence governs.

Table 3.8-15. Hazard severity levels
LevelSConsequence of failureTypical setting
Catastrophic5Derailment or loss of track support likely to cause fatalities, a hazardous materials release or loss of a structureMain line with passenger or hazardous materials traffic, over water, a road or a populated area; outage longer than a week
Critical4Derailment or main line outage likely; serious injury possible; major property damageMain line, moderate to heavy traffic; outage of several days
Serious3Track out of service or under a restrictive slow order; damage confined to railroad propertyMain line with light traffic, or busy siding; outage of hours to a day
Minor2Geometry defect needing surfacing or a temporary slow order; no derailment expectedSecondary, industry or yard track
Low1Maintenance-level effect only; no effect on train operationsAny track

Severity is a property of the site and what it carries, not of the weather or the state of the ground. It does not change in a live event (Section 3.8.26) and usually does not change when a site is stabilized; it changes only when the traffic, the track or the exposure changes.

3.8.22.4 Risk Score and Risk Matrix

The risk score is the product of the two scales:

R = F × S (1 to 25)

The score has one job: to place the site in one of five risk ratings. Table 3.8-16 gives the rating for every combination of F and S. Because R is a product, neither scale can be ignored: a Catastrophic site stays at Elevated or above until the cause is removed (Inactive), and a site with Low severity never rates above Guarded.

Table 3.8-16. Risk matrix: risk rating and risk score R = F × S
Frequency index (F)Hazard severity (S)
Catastrophic (5)Critical (4)Serious (3)Minor (2)Low (1)
Occurring (5)Severe25Severe20High15Elevated10Guarded5
Emerging (4)Severe20High16High12Elevated8Guarded4
Forming (3)High15High12Elevated9Elevated6Guarded3
Dormant (2)Elevated10Elevated8Elevated6Guarded4Low2
Inactive (1)Guarded5Guarded4Guarded3Low2Low1

The product weights F and S equally. The extra weight on consequence that Section 1.1.2 calls for comes from three rules for selecting S: the consequence floor in the situational rating (Section 3.8.23.6), “the consequence governs” (Table 3.8-15), and the engineer’s one-level adjustment (Section 3.8.22.6).

3.8.22.5 Risk Ratings and Required Response

Each rating carries a required response and a category from the risk resolution matrix of Section 1.1.7, so a site rated in this chapter can be carried directly into a railroad’s corridor-level risk register.

Table 3.8-17. Risk ratings, required response and Chapter 1.1 category
LevelRatingRisk score RRequired responseCategory (Section 1.1.7)
5Severe20–25Act now: on-site protection and operating restrictions; immediate stabilizationUnacceptable
4High12–16Act soon: slow order or increased inspection; stabilization in the next programUnacceptable
3Elevated6–10Plan: monitor, design and schedule stabilizationTolerable with Mitigation
2Guarded3–5Watch: routine inspection with defined trigger levelsTolerable with Mitigation
1Low1–2No action beyond routine inspectionTolerable

3.8.22.6 Applying the Rating

The same six steps are used whether the rating is made at the desk, on a live map or in the field. Only the source of F and S changes.

  1. Name the trigger. Write the trigger narrative and score the trigger rating T (Section 3.8.18).
  2. Select F as the current frequency Fc: the greater of the defect rating D and the geospatial frequency Fg capped at 3, raised one level where D ≥ 3 and Fg ≥ D + 1 (Table 3.8-11). At the desk this is the preliminary Fp of Section 3.8.24.3, using the defect rating from the records; in the field it is set from the field defect rating (Section 3.8.24.6); during an event it is the live Flive of Section 3.8.26, raised from Fc.
  3. Select S from the exposure (Table 3.8-15). At the desk this is Sp from the consequence attributes; in the field it is confirmed from Block 1 of the report.
  4. Compute R = F × S and read the rating from Table 3.8-16.
  5. Record F, S, R and the rating with a one-line reason for each level, so a reviewer can follow the rating.
  6. Adjust if warranted. The EIC may raise the rating by one level where the matrix understates the risk, for example where the field crew has no safe escape route, or where several nearby sites share the same trigger (the corridor effect of Section 1.1.7). Write the reason on the form. The rating is never set below the matrix value.

3.8.22.7 Rating the Alternatives

Each stabilization alternative is rated on the same matrix, as the site would be once that alternative is built. Most stabilization work lowers F by removing the cause (a drained embankment moves from Forming to Dormant or Inactive), while S usually stays the same because the track, traffic and setting do not change. An alternative that lowers S, such as track realignment away from the top of the slope, should say why. An alternative that leaves the site at High or above is at best an interim measure and should be labeled as one. Reading the current rating against the alternative ratings and the cost ranges of Section 3.8.42.6 gives the railroad the cost of each step of risk reduction.

Each alternative is rated in the three stages of Sections 3.8.37 to 3.8.39: the solution rating, as the site would be once the alternative works as intended (Section 3.8.37); the design rating earned by the design criteria, with a construction-stage rating for the risk while the work is built (Section 3.8.38); and the post-stabilization rating, provisional until the works have performed through a triggering event and are maintained, then verified (Section 3.8.39). The ratings in Table 3.8-18 are solution ratings; the field report carries them, and the design and post-stabilization ratings are added as each alternative is designed, built and verified.

Example 3.8-3: Culvert Fill Site, Part 1: Field Rating and Alternatives

A single main track runs on the outside of a curve, on a 25-ft fill across a creek floodplain. The site is rated on the report as found, and three stabilization alternatives are rated as the site would be once each works. One site carried through four examples: the field rating and its alternatives here, then the desk ratings that came before the visit in Sections 3.8.23 to 3.8.25.

Main track36-in. culvert, half blockedponded water (left)seepagetension cracks25 ftGiven25-ft fill, 2H:1V; 28 trains/day with hazmatCulvert half blocked; water 3 ft higher on leftSeepage mid-slope; fresh shoulder cracks4 cross level exceptions since last slow orderF​g = 4 (Section 3.8.24.7)RequiredTrigger T, defect rating D, F​c and SR and rating for the site as foundSolution ratings of three alternativesRecommendationBlack = given; red = required
Given and required for Example 3.8-3.

Given

VariableValueDescription
SiteSingle main track on a curve; 25-ft fill across a creek floodplainSetting
Traffic28 trains a day including hazardous materials; 50 mphExposure for S
Drainage36-in. culvert half blocked; water about 3 ft higher on the leftTrigger evidence
Field indicatorsSeepage at mid-slope; fresh tension cracks along the left shoulderDefect evidence
RecordsFour cross level exceptions since the last slow orderDefect evidence
Fg4Geospatial frequency from the desk (Section 3.8.24.7)
Alternatives1: clear culvert and regrade ditches; 2: Alternative 1 plus lateral drains and toe berm; 3: soldier piles and laggingTo be rated

Required

  • Trigger rating T, defect rating D, current frequency index Fc and severity S
  • Risk score R and rating as found
  • Solution rating of each alternative
  • The recommendation

Equations

  1. Eq. 1: Fc from Fg and D — Table 3.8-11 (Equation 3.8-3)
  2. Eq. 2: R = F × S — risk score
  3. Eq. 3: Rating = matrix(F, S) — Table 3.8-16

Steps

Step 1 · Trigger
Uses: Drainage evidence
A storm exceeding the half-blocked culvert ponds water against the left embankment in most wet years
T = 4
Spot check: Ponding in most wet years is a return period of a few years, inside the level 4 band of Table 3.8-9.
↓
Step 2 · Defect rating and current frequency (Table 3.8-11)
Uses: Field indicators, records, Fg
Fresh cracks and defects returning between surfacing cycles: D = 4 (Recurring); row Fg = 4, column D = 4
Fc = 4, Emerging
Spot check: D equals Fg, so the defects govern and no amplification applies (Fg is not ≥ D + 1).
↓
Step 3 · Severity (Table 3.8-15)
Uses: Traffic, setting
Main line outage with derailment possible, moderate traffic, not over a populated area
S = 4, Critical
Spot check: Hazardous materials traffic alone does not make it Catastrophic; the setting below the fill is a creek and farmland.
↓
Step 4 · Risk score and rating (Table 3.8-16)
Uses: Fc, S
R = 4 × 4
R = 16, High
Spot check: 16 lies in 12–16; 4×4 is High, not Severe (Table 3.8-75).
↓
Step 5 · Solution ratings (Section 3.8.37.2)
Uses: Alternatives
Alt. 1 removes the trigger only; D stays 4 → F = 4, R = 16. Alt. 2 drains the fill and adds resistance; D expected 1, Fg = 1 → F = 1, R = 4. Alt. 3 adds resistance: F = 1, R = 4
16 High (interim); 4 Guarded; 4 Guarded
Spot check: Every alternative keeps S = 4: none changes what a failure would reach.
↓
Solution
As found: 16 High. Alt. 1: 16 High (interim). Alts. 2 and 3: 4 Guarded.

Solution

Table 3.8-18. Worked example: ratings as recorded on the report
ConditionFrequency indexHazard severityRRating
Current conditionEmerging (4)Critical (4)16High
Alternative 1: clear culvert and regrade ditches (interim)Emerging (4)Critical (4)16High
Alternative 2: Alternative 1 plus lateral drains and toe bermInactive (1)Critical (4)4Guarded
Alternative 3: soldier piles and lagging along the shoulderInactive (1)Critical (4)4Guarded

The site rates High (Emerging 4 × Critical 4 = 16). Alternative 1 stays High and is an interim measure; Alternatives 2 and 3 both reach Guarded (4).

Alternative 1 is quick and inexpensive and removes the ponding, but the fill is already cracked and the defects are recurring (D = 4). Removing the trigger alone does not earn a lower defect rating, so its solution rating stays High (Section 3.8.37.2). If a wet season then passes with no movement, its post-stabilization rating can fall to Dormant and Elevated (R = 8), the same treatment the clean-culvert alternative receives in Section 3.8.41. Alternative 2 costs less than Alternative 3 and is built in about 3 months, against more than a year (Section 3.8.42.8). The recommendation is Alternative 1 now, followed by Alternative 2.

The same site is followed through the desk in Sections 3.8.23 to 3.8.25, to show how its preliminary rating is assembled before the visit. With the scales defined, the next section turns to the first input: what the site’s location and inherent conditions make possible.