GHRM · Section 3.0

Risk Management

Scoping, desktop study, drilling scope, site review, site conditions, access, cost, and risk ratings and assessment.

10 chapters

About this section

Section 3.0 covers the work done before and around the drilling: scoping a proposal, the desktop study from public records, planning the drilling scope, site reconnaissance, describing site conditions and access, estimating cost, and rating and assessing ground hazard risk. It also covers investigation planning and the hazards left by mining and other human activity.

The risk ratings and ground hazard risk assessment in Chapter 3.8 are the core of the manual. The Risk Assessment App on the GHRM front page follows the same sequence as this section.

How it fits: Uses the mechanisms in Section 2.0; sets the scope of Sections 4.0 and 5.0; risk reduction ratings tie to the designs in Section 7.0.

Chapters

Chapter 3.1

Scoping Proposals

Rating the request, reducing the uncertainty with a desktop study, and scoping what remains into a priced proposal: what the client needs, what will be delivered, what is assumed, and how the work is phased.

10 subsections▦ 5 analytical tools in chapter
Chapter 3.2

Desktop Study

Building a preliminary site model from the office before anyone goes to the field: maps, records, history and hazards.

11 subsections
Chapter 3.3

Drilling Scope

Deciding where, how deep and how many borings and tests a site needs, and writing it so a driller can price it.

11 subsections
Chapter 3.4

Site Review and Reconnaissance

Planning and carrying out the site visit, and recording what the ground, the drainage and the track are telling you.

11 subsections
Chapter 3.5

Site Conditions

Describing the physical setting of a site (ground, water, structures and track) so that everyone working on it starts from the same picture.

12 subsections
Chapter 3.6

Site Accessibility Study

Working out how crews and equipment will physically reach each boring, what has to be cleared or protected, and what that costs.

9 subsections
Chapter 3.7

Cost Estimates

Estimating the cost of exploration, testing, engineering and stabilization, and checking that the number will hold.

15 subsections▦ 1 analytical tool in chapter
Chapter 3.8

Risk Ratings and Ground Hazard Risk Assessment

How ground hazard failures develop and what sets them off, then rating the risk at a site now and after each proposed solution: failure mechanisms and triggers, current risk, the rating scales and rated elements, risk reduction ratings and the risk assessment report.

48 subsections
Chapter 3.9

Geotechnical Investigation Planning and Scope

Setting the objectives, boring layout, depths and testing of an investigation for each railroad feature, and the reliability of the design parameters it delivers.

27 subsections
Chapter 3.10

Mining and Man-Made Hazards

Abandoned mines, buried structures, utilities and old works: hazards that people put in the ground, and how to find them before they find the project.

9 subsections

Apps

20 apps