A Railroader’s Guide to Surviving the Underworld

Washouts, slope failures, sinkholes, and soft subgrade rarely appear in a capital plan until they cause a slow order or a derailment. Benesch helps railroads identify these sites early, rank them by risk, and deliver the right repair.

PortalsSign in to the Client Portal, the Benesch Portal or BEAN Books Go to Portals →

Challenges we help railroads solve

Common issues raised by railroad engineering teams.

Railroad embankment cross-section A track on an embankment with a slope failure on the left, fouled ballast under the track, a blocked culvert and ponded water on the right, a rock cut shedding rockfall, a budget sign, and a natural hazard panel, each marked with a numbered challenge. 10 $ Embankment fill Native ground Ballast section 1 2 3 4 5 6
  1. 1

    Slope movement and slow orders

    Persistent slow orders caused by recurring embankment or slope movement.

  2. 2

    Washouts and blocked culverts

    Washouts and beaver dam failures that take track out of service with little warning.

  3. 3

    Evaluate before you undercut

    GPR and geotechnical data identify fouled ballast and its cause, so undercutting goes where it's needed, for the right reason, at the right time.

  4. 4

    Capital without a clear ranking

    Limited capital funds and no defensible method for prioritizing slopes, culverts, and drainage.

  5. 5

    Natural hazard evaluation

    Exposure to earthquakes, hurricanes, floods and other natural hazards evaluated for each asset.

  6. 6

    Rockfalls

    Rock cuts and slopes where falling rock can strike or block the track.