Subsections
13This chapter sets out the desktop study: the public and railroad data sources to review, how to read the history of a site from old maps and imagery, how to screen ground hazards from the office, and how the result sets the reconnaissance and drilling scope. It builds on the desktop study sections of Chapter 3.8, which apply the same sources to the risk rating of a single site.
- 3.2.0Purpose and Overviewopen →
- 3.2.1Sources: Geology, Topography and Lidaropen →
- 3.2.2Soils, Groundwater and Hydrologyopen →
- 3.2.3Historic Imagery and Railroad Recordsopen →
- 3.2.4Hazard Databasesopen →
- 3.2.5Hydrologic Screening and Live Conditionsopen →
- 3.2.6Preliminary Site Model and Data Gapsopen →
- 3.2.7Desktop Study Deliverableopen →
- 3.2.8Cross-Referencesopen →
- 3.2.9Curve Superelevation and Speed Reviewopen →
- 3.2.10Using NRCS Soil Survey Data in the Desktop Studyopen →
- 3.2.11Terrain Analysis and Aerial Photograph Interpretationopen →
- 3.2.12Building the Project GISopen →