The two examples show how a trigger changes the margin of safety at a site. Each is laid out in five parts: what is known (Given), what is wanted (Required), the equations, a flow chart of the steps in the order they are solved with a spot check at each step, and the solution with what it means for the track.
Example 3.8-1: Effect of a Rising Water Table on an Embankment Side Slope
A 2H:1V embankment side slope of silty sand fill carries a main track, and shallow sloughing has been reported after heavy rain. The question is how much of the margin of safety the water takes away. The infinite-slope model (Chapter 6.3) suits this case because the sloughs are shallow and long compared with their depth, and seepage parallel to the slope is the condition that develops in a long wet spell.
Given and required for Example 3.8-1.
Given
Variable
Value
Description
β
26.6° (2H:1V)
Slope angle
z
6 ft
Vertical depth to the slip surface
γ
120 pcf
Total unit weight of the fill
γw
62.4 pcf
Unit weight of water
c′
50 psf
Effective cohesion
φ′
32°
Effective friction angle
m
0, 0.5 and 1.0
Saturated fraction: height of the water table above the slip surface divided by z
Required
Factor of safety FS for dry, half-saturated and fully saturated conditions
Whether the slope meets the 1.5 target, and what the result means for the trigger
Equations
Eq. 1: τd = γ z sinβ cosβ — driving shear stress on the slip plane
Eq. 2: σ = γ z cos²β — total normal stress on the slip plane
Eq. 3: u = m γw z cos²β — pore pressure for seepage parallel to the slope
Spot check: Each step of 0.5 in m removes 150 × 0.625 = 94 psf of resistance, or 0.33 in FS; 1.42 − 0.33 = 1.09 and 1.09 − 0.33 = 0.76, matching within rounding.
↓
Solution
FS falls from 1.42 (dry) to 1.10 (half saturated) to 0.77 (saturated).
Solution
FS = 1.42 dry, 1.10 half saturated and 0.77 fully saturated. The slope is marginal even when dry, below the 1.5 target. A storm that saturates half the slipping depth brings it close to failure, and full saturation fails it.
The example separates the three parts of the story that Section 3.8.1 asks for. The mechanism is shallow translational sliding of the fill. The condition that makes it possible is a steep slope in a weak, permeable fill. The trigger is rainfall infiltration that builds pore pressure. Controls that act on the mechanism are flattening the slope, a drained rock buttress, or surface drainage and vegetation. Until one is built, a rainfall-based patrol (Section 3.8.12) manages the exposure, because it watches the trigger the example shows is decisive.
Example 3.8-2: Checking a Storm Against the Caine Threshold
A rain gauge near a debris-flow channel above the track records a storm. Rainfall thresholds turn a forecast or a gauge reading into a decision, so the check is whether this storm is intense enough, for its length, to be in the range where shallow landslides and debris flows have started worldwide.
Given and required for Example 3.8-2.
Given
Variable
Value
Description
P
2.0 in.
Storm rainfall at the gauge
D
6 hr
Storm duration
Threshold
I = 0.58 D−0.39
Caine (1980) global threshold in in./hr, valid for 10 minutes to 10 days
Required
Average storm intensity I
Threshold intensity for a 6-hour storm, and whether the storm exceeds it
Equations
Eq. 1: I = P / D — average intensity
Eq. 2 (Equation 3.8-18): It = 0.58 D−0.39 — threshold intensity (in./hr, D in hours)
Steps
Step 1 · Storm intensity I (Eq. 1)
Uses: P, D
I = 2.0 / 6
I = 0.333 in./hr
Spot check: One-third of an inch an hour: 6 × 0.333 = 2.0 in.
Spot check: The ratio is 0.333 / 0.29 = 1.15, a 15% exceedance.
↓
Solution
The storm exceeds the threshold (0.333 > 0.29 in./hr).
Solution
Yes. The storm, at 0.333 in./hr over 6 hours, exceeds the Caine threshold of 0.29 in./hr.
Under a protocol calibrated to this threshold, the site would move to its heightened-response level, such as a patrol before the next train or a speed restriction, depending on its risk rating. The global threshold is a lower bound drawn from worldwide data and ignores antecedent moisture, so it is a starting point. Calibrate it against the territory’s own event record before relying on it (Sections 3.8.12 and 3.8.23.7).