The ratings are a structured way of applying engineering judgment; they do not replace it. The frequency bands are indicative, the trigger record at most sites is short, and the defect record depends on how consistently defects were reported. Ratings should be revisited after every significant triggering event, after stabilization, and whenever the traffic or exposure changes. Where the method and the engineer's judgment disagree, the engineer may raise the rating one level with a written reason (Section 3.8.22.6), and the disagreement should be reported so the method can be improved.
Table 3.8-92 lists the main limitations, what each does to a rating and how to manage it.
| Limitation | Effect on the rating | What to do |
|---|---|---|
| The frequency bands are indicative | F is a level, not a measured probability | Where a number is needed (acceptable risk, life-cycle cost), use the probability methods of Sections 3.8.30 to 3.8.35 and state the exposure period |
| Trigger records at most sites are short | T may be set too high or too low | Use agency frequency analyses for rainfall and flow; log every event and recalibrate the thresholds (Section 3.8.26.6) |
| Defect reporting varies between territories | D is biased low where defects were not recorded | Confirm D in the field; score missing evidence 3 and flag it for the visit (Section 3.8.22.1) |
| F and S are ordered levels and R is their product | R is not proportional to risk; equal scores can hide different sites (Cox 2008) | Use R only to place a site in a rating; rank within a rating by F, then S (Table 3.8-77) |
| Sites are rated one at a time | Sites that share a trigger fail together, so corridor risk is understated | Apply the one-level raise for shared triggers; carry a corridor reserve for emergency repairs (Section 3.8.30) |
| Desk inputs are regional | A preliminary rating can miss a local seep, a buried culvert or old fill | Treat desk ratings as preliminary; the field rating governs (Section 3.8.25) |
| Climate and land use change | Past return periods can understate future triggers | Rate on current gauge and rainfall records, note any trend in the rationale, and revisit thresholds after unusual events |
| Live data feeds can fail | A missing indicator can look like a normal one | A service that does not respond is named on the site and left out, never read as normal; inspect when in doubt (Section 3.8.26.5) |
| A rating is not a stability analysis | It ranks risk but gives no factor of safety or design | Design from investigation and analysis (Chapter 6.3); the investigation level caps solution credit until then (Table 3.8-80) |