Chapter 5.1 — In Situ Testing

In situ testing provides continuous or near-continuous soil and rock characterization without the inherent sample disturbance associated with laboratory testing.
Authors: Daniel P. Colwell and Mario Ruel

Primary Reference: USACE EM 1110-1-1804, Geotechnical Investigations (2001), Sections 4-5 through 4-12; ASTM D5778, D2573, D4719, D6635, D5777 (withdrawn 2024); AREMA Manual for Railway Engineering (MRE) Chapter 1.

Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database

In situ test correlations and the descriptors they map to. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.

Consistency, density and SPT (60 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Undrained shear strengthClayCL-CHVery soft251psfLOOK T2.14 / 5.3, p.50
Undrained shear strengthClayCL-CHSoft251386.5522psfLOOK T2.14 / 5.3, p.50
Undrained shear strengthClayCL-CHFirm5227831,044psfLOOK T2.14 / 5.3, p.50
Undrained shear strengthClayCL-CHStiff1,0441,5662,088psfLOOK T2.14 / 5.3, p.50
Undrained shear strengthClayCL-CHVery stiff2,0883,1324,177psfLOOK T2.14 / 5.3, p.50
Undrained shear strengthClayCL-CHHard4,177psfLOOK T2.14 / 5.3, p.50
Unconfined compressive strengthCohesive soilCL-CHVery soft (N < 2)0.25tsfIDOT T4.4.6.1.2-2, p.119
Unconfined compressive strengthCohesive soilCL-CHSoft (N = 2–4)0.250.3750.5tsfIDOT T4.4.6.1.2-2, p.119
Unconfined compressive strengthCohesive soilCL-CHMedium stiff (N = 4–8)0.50.751tsfIDOT T4.4.6.1.2-2, p.119
Unconfined compressive strengthCohesive soilCL-CHStiff (N = 8–15)11.52tsfIDOT T4.4.6.1.2-2, p.119
Unconfined compressive strengthCohesive soilCL-CHVery stiff (N = 15–30)234tsfIDOT T4.4.6.1.2-2, p.119
Unconfined compressive strengthCohesive soilCL-CHHard (N > 30)468tsfIDOT T4.4.6.1.2-2, p.119
SPT N-valueCohesive soilCL-CHVery soft00.51blows/ftGEC5 T23, p.137
SPT N-valueCohesive soilCL-CHSoft234blows/ftGEC5 T23, p.137
SPT N-valueCohesive soilCL-CHMedium stiff56.58blows/ftGEC5 T23, p.137
SPT N-valueCohesive soilCL-CHStiff91215blows/ftGEC5 T23, p.137
SPT N-valueCohesive soilCL-CHVery stiff162330blows/ftGEC5 T23, p.137
SPT N-valueCohesive soilCL-CHHard3145.560blows/ftGEC5 T23, p.137
SPT N-valueCohesive soilCL-CHVery hard60blows/ftGEC5 T23, p.137
SPT N-valueGranular soilGW-SMVery loose4blows/ftLOOK T2.15, p.50
Relative densityGranular soilGW-SMVery loose15%LOOK T2.15, p.50
SPT N-valueGranular soilGW-SMLoose4710blows/ftLOOK T2.15, p.50
Relative densityGranular soilGW-SMLoose152535%LOOK T2.15, p.50
SPT N-valueGranular soilGW-SMMedium dense102030blows/ftLOOK T2.15, p.50
Relative densityGranular soilGW-SMMedium dense355065%LOOK T2.15, p.50
SPT N-valueGranular soilGW-SMDense304050blows/ftLOOK T2.15, p.50
Relative densityGranular soilGW-SMDense657585%LOOK T2.15, p.50
SPT N-valueGranular soilGW-SMVery dense50blows/ftLOOK T2.15, p.50
Relative densityGranular soilGW-SMVery dense85%LOOK T2.15, p.50
Undrained shear strengthClayCL-CHVery soft418psfCRAIG T4.1, p.121
Undrained shear strengthClayCL-CHSoft418626.5835psfCRAIG T4.1, p.121
Undrained shear strengthClayCL-CHFirm8351,2001,566psfCRAIG T4.1, p.121
Undrained shear strengthClayCL-CHStiff1,5662,3503,133psfCRAIG T4.1, p.121
Undrained shear strengthClayCL-CHVery stiff3,1334,7006,266psfCRAIG T4.1, p.121
Undrained shear strengthClayCL-CHHard6,266psfCRAIG T4.1, p.121
Density index (relative density)SandSP-SWVery loose (N = 0–4)07.515%CRAIG T8.3, p.309
Normalized SPT valueSandSP-SWVery loose (N = 0–4)01.53blows/ftCRAIG T8.3, p.309
Density index (relative density)SandSP-SWLoose (N = 4–10)152535%CRAIG T8.3, p.309
Normalized SPT valueSandSP-SWLoose (N = 4–10)35.58blows/ftCRAIG T8.3, p.309
Density index (relative density)SandSP-SWMedium dense (N = 10–30)355065%CRAIG T8.3, p.309
Normalized SPT valueSandSP-SWMedium dense (N = 10–30)816.525blows/ftCRAIG T8.3, p.309
Density index (relative density)SandSP-SWDense (N = 30–50)657585%CRAIG T8.3, p.309
Normalized SPT valueSandSP-SWDense (N = 30–50)2533.542blows/ftCRAIG T8.3, p.309
Density index (relative density)SandSP-SWVery dense (N > 50)8592.5100%CRAIG T8.3, p.309
Normalized SPT valueSandSP-SWVery dense (N > 50)425058blows/ftCRAIG T8.3, p.309
Presumed allowable bearing value (BS 8004)Dense gravel, or dense sand and gravelGW, GP, SWFooting width ≥ 3.3 ft; groundwater ≥ B below base12.5ksfCURTIN T1.1, p.5
Presumed allowable bearing value (BS 8004)Medium dense gravel, or sand and gravelGW, GP, SWFooting width ≥ 3.3 ft; groundwater ≥ B below base4.28.312.5ksfCURTIN T1.1, p.5
Presumed allowable bearing value (BS 8004)Loose gravel, or sand and gravelGW, GP, SWFooting width ≥ 3.3 ft; groundwater ≥ B below base4.2ksfCURTIN T1.1, p.5
Presumed allowable bearing value (BS 8004)Compact sandSW, SPFooting width ≥ 3.3 ft; groundwater ≥ B below base6.3ksfCURTIN T1.1, p.5
Presumed allowable bearing value (BS 8004)Medium dense sandSW, SPFooting width ≥ 3.3 ft; groundwater ≥ B below base2.14.26.3ksfCURTIN T1.1, p.5
Presumed allowable bearing value (BS 8004)Loose sandSW, SPFooting width ≥ 3.3 ft; groundwater ≥ B below base2.1ksfCURTIN T1.1, p.5
Presumed allowable bearing value (BS 8004)Very stiff boulder clay and hard clayCL, CHFooting width ≥ 3.3 ft; groundwater ≥ B below base6.39.412.5ksfCURTIN T1.1, p.5
Presumed allowable bearing value (BS 8004)Stiff clayCL, CHFooting width ≥ 3.3 ft; groundwater ≥ B below base3.14.76.3ksfCURTIN T1.1, p.5
Presumed allowable bearing value (BS 8004)Firm clayCL, CHFooting width ≥ 3.3 ft; groundwater ≥ B below base1.62.353.1ksfCURTIN T1.1, p.5
Presumed allowable bearing value (BS 8004)Soft clay and siltCL, CH, MLFooting width ≥ 3.3 ft; groundwater ≥ B below base1.6ksfCURTIN T1.1, p.5
Undrained strength of clay from hand-sample identificationClayVery softExtrudes between fingers420psfATKINSON T5.2, p.61
Undrained strength of clay from hand-sample identificationClaySoftEasily molded in fingers420630840psfATKINSON T5.2, p.61
Undrained strength of clay from hand-sample identificationClayFirmMolded by strong finger pressure8401,2051,570psfATKINSON T5.2, p.61
Undrained strength of clay from hand-sample identificationClayStiffCannot be molded in fingers1,5701,8302,090psfATKINSON T5.2, p.61
Undrained strength of clay from hand-sample identificationClayVery stiffCan be indented by thumbnail3,130psfATKINSON T5.2, p.61
Open this set in the database ↗
Friction angle from SPT (15 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Friction angle from SPTClean medium sandSP / SWVery loose (N ≤ 4)28degLOOK T5.4, p.80
Friction angle from SPTClean medium sandSP / SWLoose (N = 4–10)282930degLOOK T5.4, p.80
Friction angle from SPTClean medium sandSP / SWMedium dense (N = 10–30)303540degLOOK T5.4, p.80
Friction angle from SPTClean medium sandSP / SWDense (N = 30–50)4042.545degLOOK T5.4, p.80
Friction angle from SPTClean medium sandSP / SWVery dense (N > 50)4547.550degLOOK T5.4, p.80
Friction angle from SPT (Meyerhof 1956)Cohesionless soilSP-SWVery loose (N < 4)30degGEC5 T34, p.211
Friction angle from SPT (Meyerhof 1956)Cohesionless soilSP-SWLoose (N = 4–10)3032.535degGEC5 T34, p.211
Friction angle from SPT (Meyerhof 1956)Cohesionless soilSP-SWCompact (N = 10–30)3537.540degGEC5 T34, p.211
Friction angle from SPT (Meyerhof 1956)Cohesionless soilSP-SWDense (N = 30–50)4042.545degGEC5 T34, p.211
Friction angle from SPT (Meyerhof 1956)Cohesionless soilSP-SWVery dense (N > 50)45degGEC5 T34, p.211
Friction angle from SPTCohesionless soilSP-SMVery loose (N = 0–4)262830degIDOT T4.4.6.1.2-1, p.119
Friction angle from SPTCohesionless soilSP-SMLoose (N = 4–10)283134degIDOT T4.4.6.1.2-1, p.119
Friction angle from SPTCohesionless soilSP-SMMedium dense (N = 10–30)303540degIDOT T4.4.6.1.2-1, p.119
Friction angle from SPTCohesionless soilSP-SMDense (N = 30–50)333945degIDOT T4.4.6.1.2-1, p.119
Friction angle from SPTCohesionless soilSP-SMVery dense (N > 50)50degIDOT T4.4.6.1.2-1, p.119
Open this set in the database ↗
CPT soil behavior type, permeability, CPT–SPT ratio and cone factors (31 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Permeability from soil behavior typeSensitive fine-grainedSBT zone 13.0×10⁻⁸3.0×10⁻⁷3.0×10⁻⁶cm/sROB T6, p.56
CPT–SPT ratio (qc/pa)/N60Sensitive fine-grainedSBT zone 12–ROB T5, p.41
Soil behavior type indexOrganic soils – claySBT zone 23.6–ROB Fig. 22, p.35
Permeability from soil behavior typeOrganic soils – claySBT zone 21.0×10⁻⁸1.0×10⁻⁷1.0×10⁻⁶cm/sROB T6, p.56
CPT–SPT ratio (qc/pa)/N60Organic soils – claySBT zone 21–ROB T5, p.41
Soil behavior type indexClays – silty clay to claySBT zone 32.953.2753.6–ROB Fig. 22, p.35
Permeability from soil behavior typeClays – silty clay to claySBT zone 31.0×10⁻⁸3.2×10⁻⁸1.0×10⁻⁷cm/sROB T6, p.56
CPT–SPT ratio (qc/pa)/N60Clays – silty clay to claySBT zone 31.5–ROB T5, p.41
Soil behavior type indexSilt mixtures – clayey silt to silty claySBT zone 42.62.7752.95–ROB Fig. 22, p.35
Permeability from soil behavior typeSilt mixtures – clayey silt to silty claySBT zone 43.0×10⁻⁷1.7×10⁻⁶1.0×10⁻⁵cm/sROB T6, p.56
CPT–SPT ratio (qc/pa)/N60Silt mixtures – clayey silt to silty claySBT zone 42–ROB T5, p.41
Soil behavior type indexSand mixtures – silty sand to sandy siltSBT zone 52.052.3252.6–ROB Fig. 22, p.35
Permeability from soil behavior typeSand mixtures – silty sand to sandy siltSBT zone 51.0×10⁻⁵1.0×10⁻⁴1.0×10⁻³cm/sROB T6, p.56
CPT–SPT ratio (qc/pa)/N60Sand mixtures – silty sand to sandy siltSBT zone 53–ROB T5, p.41
Soil behavior type indexSands – clean sand to silty sandSBT zone 61.311.682.05–ROB Fig. 22, p.35
Permeability from soil behavior typeSands – clean sand to silty sandSBT zone 61.0×10⁻³1.0×10⁻²1.0×10⁻¹cm/sROB T6, p.56
CPT–SPT ratio (qc/pa)/N60Sands – clean sand to silty sandSBT zone 65–ROB T5, p.41
Soil behavior type indexDense sand to gravelly sandSBT zone 71.31–ROB Fig. 22, p.35
Permeability from soil behavior typeDense sand to gravelly sandSBT zone 71.0×10⁻¹3.2×10⁰1.0×10²cm/sROB T6, p.56
CPT–SPT ratio (qc/pa)/N60Dense sand to gravelly sandSBT zone 76–ROB T5, p.41
Permeability from soil behavior typeVery stiff sand to clayey sand (OC or cemented)SBT zone 81.0×10⁻⁶3.2×10⁻⁴1.0×10⁻¹cm/sROB T6, p.56
CPT–SPT ratio (qc/pa)/N60Very stiff sand to clayey sand (OC or cemented)SBT zone 85–ROB T5, p.41
Permeability from soil behavior typeVery stiff fine-grained (OC or cemented)SBT zone 91.0×10⁻⁷1.0×10⁻⁶1.0×10⁻⁵cm/sROB T6, p.56
CPT–SPT ratio (qc/pa)/N60Very stiff fine-grained (OC or cemented)SBT zone 91–ROB T5, p.41
Permeability anisotropy kh/kvSoft clay – No or slightly developed macrofabric, essentially homogeneousCL-CH11.251.5–ROB T7, p.57
Permeability anisotropy kh/kvSoft clay – Fairly to well-developed macrofabric (discontinuous permeable lenses)CL-CH234–ROB T7, p.57
Permeability anisotropy kh/kvSoft clay – Varved clays and deposits with continuous permeable layersCL-CH3915–ROB T7, p.57
Cone factor for undrained strengthClaysCL-CHsu = (qt − σvo)/Nkt101418–ROB text, p.43
OCR factor k in OCR = k·QtClaysCL-CHKulhawy & Mayne (1990)0.20.330.5–ROB text, p.46
Assumed effective friction angleClaysCL-CHSmall to medium projects without triaxial data28degROB text, p.49
Assumed effective friction angleSiltsMLSmall to medium projects without triaxial data32degROB text, p.49
Open this set in the database ↗
Coefficient of subgrade reaction (plate load) (8 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Coefficient of subgrade reaction (1-ft plate)Loose sand18.438.658.9pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Medium dense sand36.8165.8294.7pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Dense sand221340.8460.5pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Clayey sand110.5202.6294.7pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Silty sand73.7128.9184.2pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Clayey soil, su < 1,044 psf (50 kPa)36.855.273.7pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Clayey soil, su 1,044–2,089 psf (50–100 kPa)73.7128.9184.2pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Clayey soil, su > 2,089 psf (100 kPa)184.2pciROB T9, p.84
Open this set in the database ↗
In situ test measurement error (12 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Coefficient of variation of in situ testStandard penetration testEquipment + procedure + random153045%LOOK T10.3, p.137
Coefficient of variation of in situ testMechanical cone penetration testEquipment + procedure + random152025%LOOK T10.3, p.137
Coefficient of variation of in situ testSelf-boring pressuremeterEquipment + procedure + random152025%LOOK T10.3, p.137
Coefficient of variation of in situ testVane shear testEquipment + procedure + random101520%LOOK T10.3, p.137
Coefficient of variation of in situ testPressuremeter, preboredEquipment + procedure + random101520%LOOK T10.3, p.137
Coefficient of variation of in situ test – measurement errorStandard penetration test (SPT)Total probable range153045%FGE T31.5, p.480
Coefficient of variation of in situ test – measurement errorMechanical cone (MCPT)Total probable range151525%FGE T31.5, p.480
Coefficient of variation of in situ test – measurement errorElectric cone (ECPT)Total probable range5715%FGE T31.5, p.480
Coefficient of variation of in situ test – measurement errorVane shear test (VST)Total probable range101420%FGE T31.5, p.480
Coefficient of variation of in situ test – measurement errorDilatometer (DMT)Total probable range51115%FGE T31.5, p.480
Coefficient of variation of in situ test – measurement errorPressuremeter, prebored (PMT)Total probable range101620%FGE T31.5, p.480
Coefficient of variation of in situ test – measurement errorSelf-boring pressuremeter (SBPMT)Total probable range151925%FGE T31.5, p.480
Open this set in the database ↗
Inherent variability of in situ test results (12 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Coefficient of variation – inherent variabilitySand and clay – CPT cone resistanceKulhawy et al. (2000), 65 data groups1036.681%FGE T31.3, p.479
Coefficient of variation – inherent variabilitySand – CPT cone resistanceSW-SMKulhawy et al. (2000), 54 data groups1038.281%FGE T31.3, p.479
Coefficient of variation – inherent variabilityClay – CPT cone resistanceCL-CHKulhawy et al. (2000), 11 data groups1628.440%FGE T31.3, p.479
Coefficient of variation – inherent variabilityClay – CPT corrected cone resistanceCL-CHKulhawy et al. (2000), 9 data groups27.917%FGE T31.3, p.479
Coefficient of variation – inherent variabilityClay – Vane shear strengthCL-CHKulhawy et al. (2000), 26 data groups1325.336%FGE T31.3, p.479
Coefficient of variation – inherent variabilitySand and clay – SPT blow countKulhawy et al. (2000), 23 data groups193862%FGE T31.3, p.479
Coefficient of variation – inherent variabilitySand and clay – DMT A and B readingsKulhawy et al. (2000), 56 data groups1227.959%FGE T31.3, p.479
Coefficient of variation – inherent variabilitySand – DMT A and B readingsSW-SMKulhawy et al. (2000), 30 data groups1334.859%FGE T31.3, p.479
Coefficient of variation – inherent variabilityClay – DMT A and B readingsCL-CHKulhawy et al. (2000), 26 data groups1219.938%FGE T31.3, p.479
Coefficient of variation – inherent variabilitySand (without outliers) – DMT material indexSW-SMKulhawy et al. (2000), 29 data groups837.766%FGE T31.3, p.479
Coefficient of variation – inherent variabilitySand (without outliers) – DMT horizontal stress indexSW-SMKulhawy et al. (2000), 29 data groups1537.667%FGE T31.3, p.479
Coefficient of variation – inherent variabilitySand (without outliers) – DMT modulusSW-SMKulhawy et al. (2000), 30 data groups741.169%FGE T31.3, p.479
Open this set in the database ↗
Electrical resistivity of soil and rock (13 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Electrical resistivityFresh water1,000,000ohm-cmFGE T24.5, p.363
Electrical resistivitySea water100300500ohm-cmFGE T24.5, p.363
Electrical resistivityCoarse sand and gravel, dry2,000,0005,000,0008,000,000ohm-cmFGE T24.5, p.363
Electrical resistivityCoarse sand and gravel, saturated100,000300,000500,000ohm-cmFGE T24.5, p.363
Electrical resistivitySand, dry500,0001,250,0002,000,000ohm-cmFGE T24.5, p.363
Electrical resistivitySand, saturated20,00060,000100,000ohm-cmFGE T24.5, p.363
Electrical resistivitySilt, dry40,000120,000200,000ohm-cmFGE T24.5, p.363
Electrical resistivitySilt, saturated3,00011,50020,000ohm-cmFGE T24.5, p.363
Electrical resistivityClay, saturated1,5002,2503,000ohm-cmFGE T24.5, p.363
Electrical resistivitySandstone10,000405,000800,000ohm-cmFGE T24.5, p.363
Electrical resistivityGranite, gneiss700,0001,100,0001,500,000ohm-cmFGE T24.5, p.363
Electrical resistivityConcrete, gabbro1,000,0002,500,0004,000,000ohm-cmFGE T24.5, p.363
Electrical resistivityQuartzite500,000750,0001,000,000ohm-cmFGE T24.5, p.363
Open this set in the database ↗
GPR dielectric permittivity of track materials (8 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
GPR dielectric permittivityAir1–LI16 T8.5, p.371
GPR dielectric permittivityFresh water8080.581–LI16 T8.5, p.371
GPR dielectric permittivityClayey soil (dry to wet)41016–LI16 T8.5, p.371
GPR dielectric permittivitySandy soil (dry to wet)414.525–LI16 T8.5, p.371
GPR dielectric permittivitySilty soil (dry to wet)91623–LI16 T8.5, p.371
GPR dielectric permittivityGranite ballast (dry to wet)567–LI16 T8.5, p.371
GPR dielectric permittivityBasalt ballast (wet)8–LI16 T8.5, p.371
GPR dielectric permittivityLimestone ballast (dry to wet)77.58–LI16 T8.5, p.371
Open this set in the database ↗
References (10)
  1. ATKINSON – Atkinson, J. (2007). The Mechanics of Soils and Foundations, 2nd ed. Taylor & Francis.
  2. CRAIG – Craig, R.F. (2004). Craig's Soil Mechanics, 7th ed. Spon Press.
  3. CURTIN – Curtin, W.G., Shaw, G., Parkinson, G.I., Golding, J.M. & Seward, N.J. (2006). Structural Foundation Designers' Manual, 2nd ed. Blackwell.
  4. FGE – Rao, V.V.S. & Sivakumar Babu, G.L., eds. (2016). Forensic Geotechnical Engineering. Developments in Geotechnical Engineering. Springer India.
  5. GEC5 – Sabatini, P.J. et al. (2002). FHWA-IF-02-034 (superseded by GEC 5, Geotechnical Site Characterization, FHWA-NHI-16-072 (2017)), Geotechnical Engineering Circular No. 5: Evaluation of Soil and Rock Properties.
  6. IDOT – Illinois DOT (2015). Geotechnical Manual.
  7. LI16 – Li, D., Hyslip, J., Sussmann, T. & Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & Francis.
  8. LOOK – Look, B.G. (2007). Handbook of Geotechnical Investigation and Design Tables. Taylor & Francis.
  9. ROB – Robertson, P.K. & Cabal, K.L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing.
  10. USACE – U.S. Army Corps of Engineers (1990). EM 1110-1-1904, Settlement Analysis.
Correlations (22)
EstimateCorrelationLimits / notesSource
Undrained strength of clay from SPTsu ≈ 4 N (high PI) to 15 N (low PI), kPa → su ≈ 85 N to 310 N psfSowers; wide scatter – calibrate locallyLOOK 5.3 notes, p.79
Undrained strength of clay from SPTsu ≈ 4.5 N (PI > 30%) to 8 N (PI = 15%), kPa → su ≈ 95 N to 165 N psfStroud & Butler (1975)LOOK 5.3 notes, p.79
Friction angle from normalized SPTφ′ = √(15.4 (N1)60) + 20°Hatanaka & Uchida (1996), 60% energyGEC5 Eq. 72, p.211
Friction angle from SPT and stressφ′ ≈ tan⁻¹ [N60 / (12.2 + 20.3 σ′vo/pa)]^0.34Schmertmann (1975); conservative at shallow depthGEC5 Eq. 73, p.211
Saturated very fine or silty sandN = 15 + (N′ − 15)/2 for N′ > 15Dynamic pore pressure correctionGEC5 34 note, p.211
Elastic modulus from SPT – silts, sandy siltsE ≈ 400 (N1)60 kPa = 8.4 (N1)60 ksfAASHTO (1996)GEC5 29, p.175
Elastic modulus from SPT – clean fine–medium sandsE ≈ 700 (N1)60 kPa = 14.6 (N1)60 ksfAASHTO (1996)GEC5 29, p.175
Elastic modulus from SPT – coarse sandsE ≈ 1,000 (N1)60 kPa = 20.9 (N1)60 ksfAASHTO (1996)GEC5 29, p.175
Elastic modulus from SPT – sandy gravelsE ≈ 1,200 (N1)60 kPa = 25.1 (N1)60 ksfAASHTO (1996)GEC5 29, p.175
Clay modulus from SPTE′/N ≈ 0.6–0.7 MPa (12.5–14.6 ksf); Eu/N ≈ 1.0–1.2 MPa (21–25 ksf)CIRIA (1995); Eu/N = 1 footings, 2 rafts, 3 friction pilesLOOK 11.12, p.155
CPT tip / SPT ratioqc/N (tsf per blow/ft): silts 2; clean fine–medium sand 3.5; coarse sand 5; sandy gravel 6SchmertmannUSACE 3-1, p.35
Undrained strength from CPTsu = qc / Nk, Nk = 17–20 (NC 17–18, OC 20); corrected su = (qc − σvo)/Nk, Nk = 15–19Calibrate with lab testsLOOK 5.14, p.85
Coefficient of horizontal consolidationch = 300 / t50 (m²/yr, t50 in minutes) → ch ≈ 3,230 / t50 ft²/yr; cv ≈ ch / 2 (range 1–10)Piezocone dissipationLOOK 5.14, p.85
Undrained strength from CPTusu = (qt − σvo)/Nkt, Nkt = 10–18 (average 14)Use 14–16 with no local experienceROB text, p.43
Undrained strength ratiosu/σ′vo ≈ Qt/Nkt ≈ 0.071 Qt; (su/σ′vo)NC ≈ 0.22 (direct simple shear, φ′ ≈ 26°)Qt = (qt − σvo)/σ′voROB text, p.45
Overconsolidation ratio from CPTOCR = 0.25 Qt^1.25 (Robertson 2009); OCR = k Qt, k = 0.33 (0.2–0.5) (Kulhawy & Mayne 1990)Kulhawy & Mayne valid for Qt < 20ROB text, p.46
In situ stress ratioK0 ≈ 0.1 QtMechanically overconsolidated fine-grained soils only; guide onlyROB text, p.47
Soil unit weight from CPTγ/γw = 0.27 log Rf + 0.36 log(qt/pa) + 1.236, Rf = 100 fs/qt (%)Robertson (2010)ROB text, p.42
Friction angle of clean sand from CPTφ′ = 17.6° + 11 log QtnUnaged, uncemented quartz to siliceous sand (Mayne 2006)ROB Fig. 28, p.49
SPT N60 from CPT and Ic(qt/pa)/N60 = 8.5 (1 − Ic/4.6)Jefferies & Davies (1993); Ic < 4.06; poor in stiff high-OCR claysROB text, p.41
Permeability from Ick = 10^(0.952 − 3.04 Ic) m/s for 1.0 < Ic ≤ 3.27; k = 10^(−4.52 − 1.37 Ic) m/s for 3.27 < Ic < 4.0 (× 100 for cm/s)Approximate guide onlyROB 6, p.56
Constrained modulus from CPTM = αM (qt − σvo); Ic > 2.2: αM = Qt when Qt < 14, αM = 14 when Qt > 14; Ic < 2.2: αM = 0.0188 · 10^(0.55 Ic + 1.68)Robertson (2009); lower in organic soilsROB text, p.62
All correlations ↗

Full database  ·  Laboratory tests  ·  Download Excel  ·  Library documents for this chapter  ·  Calculators for this chapter

Further reading — ICE Manual of Geotechnical Engineering
The chapters below cover the same ground in more depth. They are cited, not reproduced; see Appendix G for the full cross-reference and edition notes.
Executive Summary

In situ testing measures soil and rock properties in the ground, without the disturbance that comes with sampling and laboratory testing, and usually gives a continuous or closely spaced profile with depth. This chapter opens with an in situ test catalogue (Section 5.1.0) that describes every test used on railroad work in the same way: what the test is, what information it provides, how that information is used in design and risk assessment, and where it can mislead. The catalogue covers penetration tests (SPT, CPT and CPTu, seismic cone, DCP, Becker), strength and stiffness tests (field vane, pressuremeter, dilatometer, borehole shear, plate load and LWD, pocket penetrometer and Torvane), groundwater and hydraulic conductivity tests (piezometers, slug, packer, pumping and infiltration tests), field rock tests (point load, Schmidt hammer, televiewer, borehole jack), geophysical methods (MASW, seismic refraction, downhole and crosshole, resistivity, GPR, microgravity) and field density tests. Sections 5.1.2 to 5.1.7 and 5.1.15 then give the theory, equations and interpretation of the CPT, vane, pressuremeter, dilatometer, MASW, seismic refraction and GPR in English units, followed by a method comparison, four worked examples, a field operations checklist and practice questions. The SPT procedure and corrections are in Chapter 4.1. Results feed Chapter 2.2 (classification), Chapter 6.1 (bearing capacity), Chapter 6.2 (settlement), Chapter 6.3 (slope stability), Chapter 6.5 (seismic and liquefaction) and the risk ratings in Chapter 3.8.

Cone Penetration Test
Cone Penetration Test
Pressuremeter Tests
Pressuremeter Tests
Permeability vs Vane Shear Test
Permeability vs Vane Shear Test
Vane Shear Test
Vane Shear Test
Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

Empirical Equations — Use and Limitations

The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.

IDCorrelationGives
IS-12Corrected cone resistanceqₜ
IS-14Undrained shear strength from CPTSᵤ
IS-18Shear-wave velocity from CPTVₛ
IS-23Flat dilatometer (DMT) intermediate parametersI_D, K_D, E_D
IS-24OCR, K₀ and Sᵤ of clay from DMTOCR, K₀, Sᵤ
IS-25Field vane strength correctionSᵤ (field)
IX-09At-rest earth pressure coefficientK₀
IX-13Small-strain shear modulus (Hardin)G_max
IS-13Soil behaviour type index (normalized)I꜀ / Qₜₙ / Fᵣ
IS-15Friction angle of sand from CPTφ'
IS-16Relative density of sand from CPTDᵣ
IS-17Preconsolidation stress / OCR from CPTσ'ₚ, OCR
IS-19Constrained modulus from CPTM
IS-20Hydraulic conductivity from CPTk
IS-21Soil unit weight from CPTγ
5.1.0 In Situ Test Catalogue: What Each Test Provides and How It Is Used

An in situ test is any test run on the ground where it lies, rather than on a sample taken to a laboratory. The value of a test lies in the decision it supports, so each test in this catalogue is described in the same way:

  • The test: what is done and with what equipment.
  • Information provided: what is measured directly, and what is derived from it by calculation or correlation.
  • How the information is used: which analysis or decision in this manual the result feeds.
  • Limitations: where the test gives poor or misleading results.

Tests that have their own detailed section in this chapter (CPT, vane, pressuremeter, dilatometer, MASW, seismic refraction and GPR) are summarized here and linked to that section. The others are described in full here.

Measured, derived or correlated? Every parameter taken from an in situ test falls into one of three classes. Measured values (blow count, cone resistance, vane torque, water level, travel time) are facts about the test. Derived values come from them through mechanics with few assumptions (su from vane torque, Gmax from Vs, k from a slug test). Correlated values come from empirical relationships (φ′ from N, su from qt and Nkt, CBR from DPI) and carry the scatter of the data set behind them. Record which class each design parameter is in. A design that rests on correlated values should be checked against a second test type or against laboratory tests, and the uncertainty should be reflected in the risk rating (Chapter 3.8). The correlations used in this chapter are listed in the Empirical Equations card above.
5.1.0.1 Summary of Tests, Outputs and Uses

Table 5.1-10 lists every test in the catalogue on one page. The last column gives the section where it is described.

Table 5.1-10. In situ tests: what they measure and how the results are used
TestASTMMeasuresGives (derived or correlated)Main usesSection
SPTD1586N, sampleDr, φ′, consistency, EBearing, piles, liquefaction, site classCh. 4.1
CPT / CPTuD5778qt, fs, u2SBT, su, OCR, φ′, M, kStratigraphy, stability, settlement, liquefaction, piles5.1.2
SCPTuD7400CPTu + VsGmax, Vs,30Site class, dynamic stiffness5.1.0.4
DCPD6951DPICBR, MrTrackbed and pavement subgrade5.1.0.5
Becker—NBEquivalent N60Gravel liquefaction and density5.1.0.6
Field vaneD2573Torquesu, StSoft clay stability, Nkt calibration5.1.3
PMTD4719Pressure–volumeEPMT, pL, σh0Foundations, lateral piles5.1.4
DMT / SDMTD6635A and B pressuresID, KD, M, OCR, K0Settlement, stress history, slip surfaces5.1.5
BST—Shear vs normal stressc′, φ′Slopes in silt, loess, residual soil5.1.0.10
Plate load / LWDD1196, E2583Load–settlementk, ESlabs, formation acceptance, QC5.1.0.11
Pocket pen. / Torvane—Index readingqu, su (index)Logging, sample selection5.1.0.12
PiezometersD5092Water level, pressurePore pressure with timeEffective stress, monitoring, live rating5.1.0.13
Slug testD4044Head recoverykSeepage, drains, dewatering5.1.0.14
Packer testD4630Flow vs pressureLugeon, k of rockRock seepage, grouting, karst5.1.0.15
Pumping testD4050Drawdown vs timeT, S, k, radiusLarge dewatering5.1.0.16
InfiltrationD3385Inflow rateInfiltration rateStormwater, ditches5.1.0.17
Point loadD5731Breaking loadIs(50), UCSRippability, rock sockets5.1.0.18
Schmidt hammerD5873Rebound RUCS, JCSJoint shear strength, weathering5.1.0.19
TeleviewerD5753Wall imageJoint orientation, voidsRock cut kinematics, anchors5.1.0.20
Borehole jackD4971Pressure–displacementRock mass modulusFoundations on rock5.1.0.21
MASW—Surface-wave dispersionVs, Gmax, Vs,30Site class, soft-ground screening5.1.6
Seismic refractionD5777First arrivalsVp, depth to rockRock depth, rippability5.1.7
Downhole / crossholeD7400, D4428Travel timesVs, Vp, νSite response at major structures5.1.0.24
ERID6431, G57Voltage / currentResistivity sectionKarst, seepage, corrosion5.1.0.25
GPRD6432ReflectionsLayer thickness, foulingBallast and subballast condition5.1.15
MicrogravityD6430GravityMass deficitsSinkholes, mine voids5.1.0.27
Borehole geophysical logsD5753Gamma, conductivity, density, neutron, caliper, sonic, radarClay content, density, water content, fracture zones, VpCorrelating layers between borings; voids and weak zones at piers5.1.16
Magnetics (total field, gradiometer)D6429Total magnetic field or vertical gradientBuried steel: pipes, well casings, culverts, drumsClearing drilling and pile locations; old wells5.1.17
EM induction (terrain conductivity)D6429, D6639Apparent conductivityClay, saline water, landfill edges, buried metalFast mapping along a corridor before drilling5.1.17
Self-potentialD6429Natural voltage from water flowSeepage pathsEmbankment and sinkhole seepage5.1.17
Field densityD1556, D6938Density, moisture% compactionFill acceptanceCh. 5.3
A. Penetration Tests

Penetration tests push or drive a probe into the ground and record how hard it is to advance. They are the backbone of most railroad programs because they are fast, give a profile with depth and are tied to large published databases of correlations.

5.1.0.2 Standard Penetration Test (SPT)

Standard: ASTM D1586; hammer energy by ASTM D4633 (withdrawn 2025)

The test

A 2-in. outside-diameter split-spoon sampler is driven 18 in. at the bottom of a boring by a 140-lb hammer falling 30 in. The blows for each 6-in. increment are recorded; the blow count N is the sum of the second and third increments. Refusal is normally 50 blows for less than 6 in. of advance. The test is usually run every 2.5 ft in the upper 10 ft and every 5 ft below that, and it is the default test on nearly every railroad boring.

Information provided
  • Field blow count N (blows/ft) and refusal depth
  • A disturbed sample from every test for visual classification, moisture content and Atterberg limits (Chapter 5.2)
  • Corrected values N60 (hammer energy) and (N1)60 (overburden), computed as shown in Chapter 4.1, Section 4.1.3
  • By correlation: relative density and friction angle of sands, consistency of clays, elastic modulus, and typical property ranges by soil type (Appendix D)
How the information is used
  • Bearing capacity and settlement of footings on sand, and side and tip resistance of driven piles (Chapter 6.1, Chapter 6.2)
  • Liquefaction triggering with (N1)60,cs (Chapter 6.5)
  • Seismic site class from the average blow count over the upper 100 ft where shear wave velocity has not been measured (Chapter 6.5)
  • Locating soft or loose zones under the track and setting the depth of borings and undercuts
Limitations

Results depend on hammer energy, borehole cleanout and the crew. N is unreliable in soft clay (use the vane or CPTu instead) and is inflated by gravel. Below the water table, sand can heave into the hole and give low counts unless the hole is kept full of water or drilling fluid.

Detailed procedure, energy corrections and Example 6-1 are in Chapter 4.1, Section 4.1.3. The reliability of SPT–CPT conversions is discussed in Section 5.1.8.

5.1.0.3 Cone and Piezocone Penetration Test (CPT and CPTu)

Standard: ASTM D5778

The test

A 1.41-in.-diameter, 60° cone is pushed at 0.8 in./s by a truck- or track-mounted rig. Sensors record tip resistance, sleeve friction and, on a piezocone, pore pressure behind the tip about every 2 in. A sounding to 60 ft takes well under an hour. No sample is recovered.

Information provided
  • Measured: tip resistance qc (corrected to qt), sleeve friction fs, pore pressure u2
  • Soil behavior type and the index Ic, giving a continuous stratigraphic log that picks up layers as thin as about 4 in.
  • By correlation: undrained strength su, OCR and preconsolidation stress, friction angle and relative density of sand, constrained modulus, unit weight
  • Dissipation tests: coefficient of consolidation ch, hydraulic conductivity, and the static water level
How the information is used
  • Filling in the stratigraphy between borings along a corridor, and finding thin soft or loose layers that SPT spacing misses
  • Undrained strength for embankment stability (Chapter 6.3) and consolidation settlement inputs (Chapter 6.2)
  • Direct pile capacity methods that use qt and fs (Chapter 6.1)
  • Liquefaction triggering with qc1N (Chapter 6.5)
  • Subgrade modulus for track (Chapter 2.3, Section 2.3.6)
Limitations

Will not penetrate gravel, cobbles, dense cemented soil or old riprap in embankments; pair it with borings to confirm soil type, since the log is a behavior type, not a classification.

Full treatment in Section 5.1.2 and Example 5.1-1.

5.1.0.4 Seismic Cone (SCPTu)

Standard: ASTM D7400 (downhole method)

The test

A piezocone with one or two geophones behind the tip. At each rod break, usually every 3.3 ft, pushing stops and a shear wave is generated at the surface by striking a beam held down by the rig. The arrival time at the geophone gives the interval shear wave velocity. A compression-wave source can be added.

Information provided
  • All CPTu outputs, plus a measured shear wave velocity Vs profile (and P-wave velocity Vp if recorded)
  • Small-strain shear modulus Gmax = ρVs2 at the same location as the strength profile
  • Vp near 4,900 ft/s marks full saturation, which matters for liquefaction
How the information is used
  • Seismic site class from Vs,30 (Chapter 6.5)
  • A second, independent liquefaction check based on Vs
  • Small-strain stiffness of the trackbed and foundation soils for dynamic analysis; the small cyclic strains under train loads are closer to Gmax than to a resilient modulus
  • Detecting aging or cementation: a Vs much higher than the CPT correlation predicts means the correlations will understate strength and stiffness
Limitations

Depth is limited to where the cone can be pushed. Velocities in the upper 5 to 10 ft are less reliable because of the short travel path.

5.1.0.5 Dynamic Cone Penetrometer (DCP)

Standard: ASTM D6951

The test

A hand-portable probe: a 17.6-lb hammer dropped 22.6 in. drives a 60° cone of about 0.79-in. diameter. The penetration per blow, the DCP index (DPI), is recorded to about 3 ft, and deeper with extension rods. Two people can run a test in 15 minutes from the shoulder, a crib window or the bottom of a test pit, which suits track time limits.

Information provided
  • Penetration index DPI (in./blow) with depth, and the depth at which it changes (layer boundaries)
  • California Bearing Ratio (CBR) of each layer from ASTM D6951 correlations
  • Resilient modulus Mr from CBR
How the information is used
  • Subgrade strength under existing track at mud-pumping, ballast-pocket and soft-spot locations (Chapter 2.3)
  • Thickness and strength of subballast and subgrade for granular layer design (Chapter 2.1, Section 2.1.17)
  • Pavement subgrade CBR at yards and intermodal facilities (Chapter 7.3)
  • Quick acceptance checks on subgrade and fill alongside proof rolling (Chapter 5.3)
Limitations

Cannot penetrate ballast or coarse gravel; remove ballast first. The correlations change with soil type, so the subgrade must be classified. A rock or cobble gives a false high resistance; repeat the test a short distance away.

Applied in Example 5.1-4.

5.1.0.6 Becker Penetration Test and Dynamic Probing

Standard: No ASTM standard for the Becker test; dynamic probing by EN ISO 22476-2

The test

The Becker hammer drill drives a closed-end, 6.6-in. double-walled casing with a diesel hammer and counts the blows per foot. It is the usual tool for penetration resistance in gravel and cobbles, where the SPT sampler is too small. Blow counts are corrected for hammer energy (measured by instrumenting the casing) and converted to an equivalent SPT N60. Lighter continuous dynamic probes, driven without a borehole, are a cheaper screening tool in sand and fine gravel.

Information provided
  • Becker blow count NB and its equivalent N60 in gravelly soils
  • A continuous resistance profile, but no sample
How the information is used
  • Liquefaction and strength of gravelly alluvium at bridge and embankment sites in seismic areas (Chapter 6.5)
  • Density of coarse fill and gravel foundations where SPT counts would be inflated
Limitations

Specialized equipment with few operators. The conversion to N60 carries much more uncertainty than an SPT; use a range, not a single value.

B. Shear Strength and Stiffness Tests

These tests load the ground in a controlled way to measure strength or stiffness directly, rather than inferring them from penetration resistance. They are used where the design depends on one parameter and a correlation is not good enough.

5.1.0.7 Field Vane Shear Test (VST)

Standard: ASTM D2573

The test

A four-bladed vane is pushed into undisturbed clay below the bottom of a boring, or from the surface inside a protective casing, and rotated slowly. The peak torque gives the peak undrained strength. After ten or more rapid turns, the residual torque gives the remolded strength.

Information provided
  • Peak and remolded undrained shear strength su
  • Sensitivity St = peak / remolded
  • Design su after Bjerrum’s correction for plasticity index
How the information is used
  • Undrained strength of soft clay for embankment stability, widening and staged construction (Chapter 6.3, Chapter 7.2)
  • Calibrating the CPTu cone factor Nkt for a site
  • Screening sensitive and quick clays, which lose most of their strength when disturbed by vibration or excavation
  • Undrained bearing capacity of footings and pile tips in soft clay (Chapter 6.1)
Limitations

Only for soft to firm clay (about su below 2,000 psf). Silt and sand drain during the test and give meaningless results; shells, roots and fibers in peat overstate strength.

Full treatment in Section 5.1.3 and Example 5.1-2.

5.1.0.8 Pressuremeter Test (PMT)

Standard: ASTM D4719

The test

A cylindrical probe is lowered into a carefully drilled hole and a rubber membrane is expanded against the borehole wall in pressure steps. The volume change at each step gives a pressure–volume curve. An unload–reload loop gives a stiffness closer to working loads. Self-boring versions drill themselves into place and avoid most disturbance.

Information provided
  • Pressuremeter modulus EPMT and unload–reload modulus
  • Limit pressure pL and creep pressure
  • In situ horizontal stress (most reliable with the self-boring probe)
  • By correlation: undrained strength of clay, friction angle of sand
How the information is used
  • Bearing capacity and settlement of footings by direct pressuremeter methods (Chapter 6.1, Chapter 6.2)
  • Lateral load response (p–y curves) of piles and drilled shafts supporting bridges, signal masts and catenary poles
  • Stiffness of soils that are hard to sample: stiff fissured clay, residual soil, weathered rock and dense glacial till
Limitations

Results depend heavily on borehole quality; an oversized or smeared hole ruins the test. Slower and more expensive than penetration tests, so it is used at specific foundation locations, not along a corridor.

Full treatment in Section 5.1.4.

5.1.0.9 Flat Dilatometer Test (DMT and SDMT)

Standard: ASTM D6635 (withdrawn 2024)

The test

A flat steel blade about 3.7 in. wide and 0.6 in. thick is pushed into the ground, usually by a CPT rig. At every 8 in. a circular membrane on one face is inflated; the pressure to start moving it (A) and to move it 0.04 in. (B) are recorded. The seismic dilatometer adds geophones for shear wave velocity.

Information provided
  • Intermediate indices: material index ID (soil type), horizontal stress index KD, dilatometer modulus ED
  • Constrained modulus MDMT, OCR, K0, undrained strength of clay and friction angle of sand
  • Vs and Gmax from the seismic version
How the information is used
  • Settlement of embankments and footings: MDMT is one of the better field estimates of one-dimensional modulus (Chapter 6.2)
  • Stress history (OCR) of clay layers, which decides whether settlement is recompression or virgin consolidation
  • Locating existing slip surfaces in clay slopes, where KD close to 2 marks remolded material (Chapter 6.3)
  • Before-and-after checks of densification and ground improvement (Chapter 7.2)
Limitations

Same push limits as the CPT. The blade can bend in dense or gravelly layers. The correlations are for uncemented soils.

Full treatment in Section 5.1.5.

5.1.0.10 Borehole Shear Test (BST)

Standard: No ASTM standard; Iowa borehole shear tester procedure

The test

Two serrated plates are expanded against the wall of a 3-in. borehole under a set normal stress, left to consolidate for about 5 to 15 minutes, then pulled upward to shear the soil. The test is repeated at increasing normal stresses at the same depth, giving several points on a failure envelope from one location in about an hour.

Information provided
  • Drained or near-drained cohesion c′ and friction angle φ′ at a known depth, without sampling
  • Several envelope points from one hole, so scatter between samples is removed
How the information is used
  • Effective-stress strength of silty soils, loess and residual soils for slope stability and cut design (Chapter 6.3)
  • Quick strength data for back-analysis of slides where sampling is difficult
Limitations

Drainage in clays is not certain, so results in plastic clay may be partly undrained. Does not work in gravel or in holes that will not stay open.

5.1.0.11 Plate Load Test and Light Weight Deflectometer (LWD)

Standard: ASTM D1196 (static plate load); LWD by ASTM E2583 and E2835

The test

A rigid steel plate, typically 12 to 30 in. in diameter, is loaded in steps against a reaction (a loaded truck or rail equipment) and its settlement measured. Unloading and reloading gives a second modulus. The light weight deflectometer is a portable version: a 22-lb weight dropped onto a 12-in. plate, with the deflection recorded in seconds.

Information provided
  • Load–settlement curve and the modulus of subgrade reaction k (pci)
  • Surface elastic modulus of the layers under the plate (first loading and reloading)
  • LWD: a dynamic surface modulus for fast comparison along a section
How the information is used
  • Modulus of subgrade reaction for rigid pavements and slabs at yards (Chapter 7.3)
  • Stiffness of formation, subballast and subgrade for track design and acceptance; the ratio of reload to first-load modulus is used as a compaction check
  • Field verification of bearing assumptions for shallow foundations
  • LWD as a quick quality-control test on fill lifts and subgrade (Chapter 5.3)
Limitations

The plate tests only to a depth of about 1.5 to 2 plate diameters, so a soft layer deeper down is missed; scale results to the real footing carefully. The LWD modulus is not the same as a static or resilient modulus; correlate it with site tests.

5.1.0.12 Pocket Penetrometer and Torvane

Standard: Field index tests; no ASTM standard

The test

Hand tools used on the ends of tube samples, split-spoon samples, test-pit walls and cut faces. The pocket penetrometer is pushed 1/4 in. into the soil and reads unconfined compressive strength directly in tsf. The Torvane is a small vane pressed against a flat surface and turned by hand; it reads undrained strength.

Information provided
  • Estimated unconfined strength qu (pocket penetrometer) and undrained strength su (Torvane)
How the information is used
  • Consistency descriptions on boring logs (very soft to hard)
  • Choosing which tube samples go to the laboratory, and spotting disturbed samples
  • Screening strength of exposed clay in cuts and failed slopes during reconnaissance
Limitations

Index values only. They test a tiny volume, often of disturbed soil, and should not be used alone for design.

C. Groundwater and Hydraulic Conductivity Tests

Water is involved in most railroad ground hazards. These tests establish where the water is, what pressure it is under, and how easily it moves through the ground.

5.1.0.13 Groundwater Levels and Piezometers

Standard: ASTM D5092 (monitoring wells)

The test

Water levels are recorded during drilling, at completion and at least 24 hours later. Open standpipe piezometers (a screened pipe sealed at a chosen depth) and vibrating-wire piezometers (a pressure sensor grouted in place, read by a data logger) give water pressure over time at specific depths.

Information provided
  • Depth of the water table and any perched or artesian water
  • Pore water pressure at a given depth, and how it changes with season, rainfall and river stage
  • Response time of the ground to storms, which shows how quickly a slope can lose strength
How the information is used
  • Effective stress in every strength, settlement and liquefaction calculation (Chapter 6.2, Chapter 6.3, Chapter 6.5)
  • Pore pressure conditions in slope stability, including the high-water design case
  • Dewatering and drainage design for culverts, underpasses and cuts (Chapter 2.8)
  • Trigger levels for monitoring and the live risk rating (Chapter 3.8)
Limitations

A water level read during or right after drilling is often wrong, especially in clay or where drilling fluid was used. Piezometers must be sealed so they read one layer, not a mixture.

Installation details are in Chapter 2.8.

5.1.0.14 Slug (Rising- and Falling-Head) Tests

Standard: ASTM D4044 (withdrawn 2024)

The test

The water level in a well or piezometer is suddenly raised or lowered, by adding or removing water or by dropping in a solid rod (a slug), and the return to the static level is timed. The rate of recovery and the geometry of the screen give the hydraulic conductivity of the soil around it (Hvorslev or Bouwer–Rice methods).

Information provided
  • Hydraulic conductivity k (ft/day) of the soil or rock around the well screen
How the information is used
  • Seepage analysis through and beneath embankments (Chapter 6.4)
  • First estimates of dewatering inflow for excavations
  • Checking consolidation rates: k from the field is often higher than the laboratory value because of sand seams and fissures (Chapter 6.2)
  • Design of underdrains and edge drains
Limitations

Tests only a small volume around the screen and is sensitive to a smeared or clogged well. Treat it as a local value, and test several wells.

5.1.0.15 Packer (Lugeon) Tests

Standard: ASTM D4630

The test

One or two inflatable packers seal off a length of a rock borehole, typically 5 to 10 ft, and water is pumped in at a series of rising and then falling pressures. The flow rate at each step is measured. One Lugeon is a take of about 0.08 gal/min per foot of test section at 145 psi, roughly equal to a hydraulic conductivity of 0.04 ft/day.

Information provided
  • Hydraulic conductivity of a rock interval, in Lugeons
  • The pattern of flow with pressure, which shows whether joints are open, washing out, filling or being jacked open
  • Intervals that take water without building pressure, a sign of open voids or karst
How the information is used
  • Seepage and uplift beneath embankments and structures founded on rock
  • Inflow to rock cuts, culverts and tunnels, and grouting design
  • Confirming karst or mine voids found by geophysics (Chapter 6.4)
Limitations

Packers can leak or be bypassed through joints around them. Use pressures low enough not to open the joints unless that is the purpose.

5.1.0.16 Pumping Tests

Standard: ASTM D4050

The test

A well is pumped at a constant rate for hours to days while the drawdown is recorded in it and in nearby observation wells. The drawdown–time and drawdown–distance data are fitted to aquifer models (Theis, Cooper–Jacob).

Information provided
  • Transmissivity, storage coefficient and average hydraulic conductivity of a large volume of ground
  • Radius of influence and the presence of recharge or barrier boundaries
How the information is used
  • Dewatering design for large excavations such as underpasses, pump stations and bridge foundations (Chapter 2.8)
  • Predicting effects of dewatering on nearby wells, wetlands and settlement-sensitive structures
Limitations

Expensive and slow, and needs a permit to discharge water in many places. Worth it only where dewatering is a large part of the cost or risk.

The Cooper–Jacob method is worked in Chapter 2.8.

5.1.0.17 Infiltration Tests

Standard: ASTM D3385 (double-ring infiltrometer)

The test

Two concentric rings, typically 12 and 24 in. in diameter, are driven into the surface and kept filled with water. The rate at which water level falls in the inner ring, once steady, is the infiltration rate. Borehole permeameters do the same at depth.

Information provided
  • Steady infiltration rate (in./hr) of the surface soil
How the information is used
  • Sizing stormwater basins, infiltration trenches and ditches at yards and terminals (Chapter 6.4)
  • Runoff estimates for slopes and cut faces, and the erosion potential of the surface
Limitations

Represents only the surface layer at that spot; compaction from equipment changes it greatly. Run several tests across the area.

D. Rock Tests in the Field

Rock strength and the orientation of discontinuities decide how cuts fail, how much it costs to excavate, and how foundations on rock behave. These tests are run on outcrops, on core at the rig, or in the borehole.

5.1.0.18 Point Load Test

Standard: ASTM D5731 (withdrawn 2025)

The test

A piece of core or an irregular rock lump is broken between two cone-shaped points in a portable frame. The breaking load, corrected to a 2-in. equivalent core diameter, gives the point load index Is(50). Dozens of tests can be run at the rig in an hour.

Information provided
  • Point load index Is(50) and the strength anisotropy index for layered rock
  • By correlation: unconfined compressive strength, roughly 20 to 25 times Is(50) for many rocks, but from about 15 to 50 times depending on rock type
How the information is used
  • Rock strength for excavatability and rippability (with seismic refraction)
  • Rock socket design for drilled shafts (Chapter 6.1)
  • Strength rating in the rock mass classification (Chapter 2.2)
  • Showing how strength varies along the core so laboratory tests can be chosen well
Limitations

Calibrate the conversion factor with a few laboratory unconfined compression tests (Chapter 5.2). Results on weak, clayey rock are scattered.

5.1.0.19 Schmidt (Rebound) Hammer

Standard: ASTM D5873 (withdrawn 2023) (rock); ASTM C805 (concrete)

The test

A spring-loaded plunger strikes the rock surface and the rebound number R is read. At least 20 readings are taken on a clean, flat surface and the high values averaged.

Information provided
  • Rebound number R
  • By correlation: unconfined strength of intact rock, and the joint wall compressive strength (JCS) used in joint shear strength
How the information is used
  • Shear strength of joints for rock slope stability (Barton–Bandis), together with joint roughness (Chapter 6.3)
  • Mapping weathering grade across a cut face and identifying weak beds that undercut rock fall sources
  • Condition screening of old masonry and concrete culverts, abutments and walls
Limitations

Very sensitive to surface condition, weathering rind, moisture and the direction of the hammer. Use it to compare, not as a measured strength.

5.1.0.20 Borehole Imaging (Optical and Acoustic Televiewer)

Standard: ASTM D5753 (borehole geophysical logging)

The test

A probe lowered down an open or water-filled rock hole records a continuous, oriented image of the borehole wall, either a photograph (optical) or a map of acoustic reflection (acoustic). Caliper, natural gamma and other logs can be run in the same visit.

Information provided
  • Depth, dip and dip direction of every joint, bedding plane and fault
  • Aperture, infilling and spacing of discontinuities
  • Voids, solution features and zones of lost core
How the information is used
  • Kinematic checks for planar, wedge and toppling failure in rock cuts (Chapter 6.3)
  • Orienting rock bolts and anchors (Chapter 7.1)
  • Locating and sizing karst or mine voids for grouting
Limitations

Needs a stable, uncased hole; muddy water blinds the optical camera. Images must be interpreted by someone who has seen the core.

Televiewer logs are usually run with the other borehole geophysical logs; see Section 5.1.16.

5.1.0.21 Borehole Jack and Rock Dilatometer

Standard: ASTM D4971 (withdrawn 2025) (borehole jack)

The test

Two curved steel plates (the borehole jack) or an expanding membrane (the rock dilatometer) load the wall of an NX-size rock hole. Pressure against wall displacement gives the deformation modulus of the rock mass at that depth.

Information provided
  • In situ deformation modulus of the rock mass, which includes the effect of joints that a core test misses
How the information is used
  • Settlement of foundations and drilled shaft sockets on fractured or weathered rock (Chapter 6.1, Chapter 6.2)
  • Checking modulus values estimated from rock mass classification
Limitations

Specialized and seldom used on railroad work except at major bridges. Tests a small volume, so several depths are needed.

E. Geophysical Methods

Geophysics measures a physical property of the ground over a large area from the surface or from boreholes. It never replaces borings, but it shows where to put them and fills the gaps between them, which is valuable along a long, narrow corridor.

5.1.0.22 Multichannel Analysis of Surface Waves (MASW)

Standard: No ASTM standard; see Park, Miller and Xia (1999)

The test

A line of 24 or more geophones records surface waves from a sledgehammer or weight drop. Because longer waves reach deeper, their speed at each frequency gives a shear wave velocity profile, typically to 60 to 100 ft. Passive versions record traffic and other background vibration to reach deeper.

Information provided
  • Shear wave velocity Vs with depth, in 1D soundings or 2D sections
  • Gmax and Vs,30
  • Low-velocity zones that may be soft soil, loose fill or voids
How the information is used
  • Seismic site class (Chapter 6.5)
  • Corridor screening for soft ground and muskeg thickness before borings are placed
  • Before-and-after checks of ground improvement (Chapter 7.2)
  • Stiffness of the trackbed and foundation for dynamic track modulus
Limitations

Resolution decreases with depth, and a stiff layer over a soft one can hide the soft one. Calibrate against at least one boring or SCPTu.

Full treatment in Section 5.1.6 and Example 5.1-3.

5.1.0.23 Seismic Refraction

Standard: ASTM D5777

The test

Compression waves from a surface source are recorded on a line of geophones. Waves bent along faster, deeper layers arrive first at long distances, and the arrival times give layer depths and P-wave velocities. Refraction tomography gives a 2D velocity section.

Information provided
  • P-wave velocity of each layer and the depth to faster layers, usually the top of rock or the water table
  • Lateral variation in rock surface along the line
How the information is used
  • Depth to rock along proposed cuts and foundations, so borings can be fewer and better placed
  • Rippability and excavation cost: velocity is compared with equipment manufacturers’ rippability charts, supported by point load tests
  • Saturated soil, with Vp about 4,900 ft/s
Limitations

Cannot see a slower layer beneath a faster one (a velocity inversion), such as soft clay under a stiff crust or a weathered seam within rock.

Full treatment in Section 5.1.7.

5.1.0.24 Downhole and Crosshole Seismic Tests

Standard: ASTM D7400 (downhole); ASTM D4428 (crosshole)

The test

Downhole: a source at the surface and a receiver lowered in a cased boring. Crosshole: a source in one cased boring and receivers in one or two others, 10 to 20 ft away, at the same depths. Both measure travel times layer by layer.

Information provided
  • Interval Vs and Vp at each depth; crosshole gives the most accurate values available
  • Poisson’s ratio from Vp/Vs above the water table
How the information is used
  • Site response analysis for major bridges and structures (Chapter 6.5)
  • Checking MASW profiles where the site class is near a boundary
  • Vibration and dynamic foundation analysis
Limitations

Needs borings cased and grouted correctly, and borehole deviation surveys for crosshole. Costly; reserved for major structures.

Crosshole tomography, the velocity index and the other borehole logs are in Section 5.1.16.

5.1.0.25 Electrical Resistivity Imaging (ERI)

Standard: ASTM D6431; soil resistivity for corrosion by ASTM G57

The test

Current is passed between pairs of electrodes along a line and the voltage between other pairs is measured. Inversion gives a 2D or 3D section of resistivity. Clay and salty water conduct well (low resistivity); clean sand, gravel, dry fill, air-filled voids and rock do not (high resistivity).

Information provided
  • A section showing clay versus granular soil, wet versus dry zones, depth to rock, and anomalies such as voids or buried debris
  • Soil resistivity (ohm-cm) at a point for corrosion assessment
How the information is used
  • Karst and mine void screening, and choosing where to drill (Chapter 3.8)
  • Finding seepage paths and wet zones through embankments and the moisture conditions behind slides (Chapter 6.3, Chapter 6.4)
  • Corrosion potential of the soil for steel piles, pipe culverts and soil nails (Chapter 6.1, Chapter 7.1)
  • Repeat surveys to track seasonal wetting of a slope
Limitations

Many different conditions can give the same resistivity, and rails, fences, pipelines and other metal nearby distort the data. Always interpret with borings.

5.1.0.26 Ground Penetrating Radar (GPR)

Standard: ASTM D6432

The test

Radar pulses are sent into the ground from an antenna dragged along the surface or mounted on a hi-rail vehicle, and reflections from boundaries in dielectric constant are recorded. On track, 1 to 2 GHz antennas image the ballast and subballast; lower frequencies reach deeper with less detail.

Information provided
  • Thickness of clean ballast, fouled ballast and subballast along the track
  • Ballast pockets, wet zones and changes in the subgrade surface
  • Buried utilities, voids beneath slabs and culverts, and shallow rock
How the information is used
  • Planning undercutting, shoulder cleaning and drainage work (Chapter 2.3)
  • Placing crib digs and DCP tests at the worst locations
  • Clearing utilities before drilling
Limitations

Clay and wet ground absorb the signal and limit depth to a few feet. Depth depends on an assumed dielectric constant, so calibrate at test pits.

Full treatment in Section 5.1.15.

5.1.0.27 Microgravity

Standard: ASTM D6430

The test

A sensitive gravity meter is read on a close grid of surveyed points. After correcting for elevation, terrain, latitude and drift, small negative anomalies show where mass is missing below the surface.

Information provided
  • Map of gravity anomalies showing mass deficits: voids, solution cavities, loose infill and old mine workings
How the information is used
  • Screening for sinkholes and abandoned mine workings beneath the track (Chapter 3.8)
  • Targeting borings and grout holes, and checking that grouting filled the void
Limitations

Needs precise elevations and a quiet site; passing trains and heavy equipment disturb readings. Resolves only voids that are large relative to their depth.

F. Field Density and Compaction Tests

These tests check fill placed during construction rather than natural ground. They are listed here for completeness and covered in Chapter 5.3.

5.1.0.28 Sand Cone, Nuclear Gauge and Drive Cylinder

Standard: ASTM D1556, D6938 and D2937

The test

The sand cone measures the volume of a small hole by filling it with calibrated sand; the nuclear gauge measures density and moisture from radiation passing through the soil; the drive cylinder cuts out a known volume of fine-grained soil.

Information provided
  • In-place dry unit weight and moisture content
  • Percent compaction relative to the laboratory maximum dry unit weight (Chapter 5.2)
How the information is used
  • Acceptance of embankment fill, subgrade and backfill against the specification (Chapter 5.3)
  • Checking existing fill density where an old embankment is being widened
Limitations

Tests a small volume at the surface of each lift; the nuclear gauge needs a licensed operator and calibration against sand cone tests on the same soil.

Procedures and worked examples are in Chapter 5.3.

5.1.0.29 Choosing Tests by the Design Question

Start from the question the investigation has to answer, not from the tests the driller has available. Table 5.1-11 gives a first choice and the tests that confirm or extend it. The method comparison in Section 5.1.8 adds suitability ratings by soil type.

Table 5.1-11. First-choice and supporting in situ tests by design question
Design questionFirst choiceSupporting testsAnalysis in
How strong is the soft clay under an embankment?CPTu with field vane calibrationDMT; laboratory triaxial tests on tube samplesChapter 6.3
How much will a new fill or widening settle, and how fast?CPTu with dissipation tests; DMTLaboratory consolidation tests; piezometers and settlement plates during constructionChapter 6.2
Will the ground liquefy?CPTu or SPTSCPTu or MASW for Vs; Becker in gravelChapter 6.5
What is the seismic site class?MASW or SCPTuDownhole or crosshole near a class boundaryChapter 6.5
What will support a footing or pile?SPT and CPTPMT for lateral loads and stiff soils; plate load to verifyChapter 6.1
Why is this track section pumping or losing surface?GPR along the track, then DCP in crib digsPiezometers; laboratory index tests of fouling and subgradeChapter 2.3
Where is the top of rock and can it be ripped?Seismic refractionBorings with point load testsChapter 6.3
What controls the stability of a rock cut?Discontinuity mapping and televiewerSchmidt hammer for JCS; point load for intact strengthChapter 6.3
Are there voids from karst or old mines?ERI or microgravityBorings and packer tests at the anomalies; televiewerChapter 3.8
What will the water do?Piezometers with timeSlug or packer tests; pumping test for large dewateringChapter 2.8
Will the soil corrode steel?Soil resistivity, pH, sulfates and chloridesERI for extentChapter 7.1
Is the new fill compacted?Nuclear gauge or sand coneLWD, DCP and proof rollingChapter 5.3

Three rules apply in almost every case:

  • Pair a profiling test with a sampling test. CPT, DMT and geophysics show where layers change; borings show what the layers are. Neither is complete alone.
  • Calibrate correlations on site. A few side-by-side tests (vane beside CPTu, SPT beside CPT, a boring on a geophysical line) turn regional correlations into site-specific ones.
  • Measure water. Nearly every analysis needs the pore pressure, and a single reading at the end of drilling is rarely enough.
5.1.1 Background and Role of In Situ Testing in Railroad Investigations

Railroad embankments, bridges, culverts, and intermodal facilities impose repetitive dynamic loads that sensitize soft or marginally competent soils in ways that static design loads alone do not capture. The Cooper E-80 live load equivalent used by Class I railroads combined with dynamic load factors (DLF) of 1.2 to 1.5 (see Introduction, Table 1.0-3) means that subgrade characterization must resolve not only static strength and stiffness but also cyclic response. In situ testing is indispensable for this because:

Geotechnical Investigation Beyond SPT
Geotechnical Investigation Beyond SPT
  1. Soft clays and organic soils — common in Class I railroad corridor located in the Atlantic Coastal Plain, high-speed passenger corridor estuarine deposits, Class I railroad shoreline alignments located in the Great Lakes region, and Class I railroad subsidiaries located in the Gulf Coast — cannot be sampled and tested without significant disturbance unless a fixed-piston sampler is used. The VST and CPTu provide undisturbed strength measurements directly in the ground.
  2. Liquefaction screening (Chapter 6.5) requires normalized CPT tip resistance (q_c1N) that cannot be obtained from SPT alone.
  3. Stiffness profiling for dynamic track modulus — increasingly requested by many owner railroads for mainline heavy-haul corridors — requires small-strain shear modulus (G_max) from MASW or seismic CPT.
  4. Rippability assessment for rock cuts on Class I railroad routes located in Appalachia and Class I railroad Shield crossings located in Canada is efficiently accomplished by seismic refraction before committing to diamond core drilling programs.
  5. Short-line subsidiaries operating short-line or regional networks often lack the budget for extensive drilling but can receive substantial value from MASW profiling combined with selective SPT borings.
Supplemental reference

In-situ tests adapted for the trackbed

Access under traffic limits most in-situ tests to the shoulder or a track window. McHenry and Rose (2012) summarize the tools that can be run from the track or crib: the dynamic cone penetrometer and the instrumented French PANDA (records blow energy and penetration to give dynamic cone resistance qd), the light weight deflectometer, the German DyStaFiT dynamic plate test, and rail-bound stiffness vehicles (Track Loading Vehicle, Portancemètre). They also note that seismic CPT is attractive for railroads because a small-strain modulus better reflects the small cyclic strains under train loads than a resilient modulus does.

Source: McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of Kentucky

In situ test methods and their applicability

Profillidis reproduces a matrix of in situ test methods (from Carter and Bentley, Correlations of Soil Properties) rating each method’s applicability to soil identification, profiling and engineering parameters across soil types. He notes that before 1960 the list would have held only the standard penetration test, the mechanical cone, the vane shear test and the plate load test. Today several methods can usually supply any given parameter, so the choice can be driven by soil type, depth and cost.

Figure 5.1-11. In situ soil test methods and their applicability (A = high, B = moderate, C = low, – = none). Profillidis Table 9.1, after Carter and Bentley (1991).
Figure 5.1-11. In situ soil test methods and their applicability (A = high, B = moderate, C = low, – = none). Profillidis Table 9.1, after Carter and Bentley (1991).

After Profillidis (2014), §9.2.3, Table 9.1; after Carter, M. and Bentley, S. (1991), Correlations of Soil Properties, Pentech Press. Full reference under Supplemental References.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-18 Shear-wave velocity from CPT VₛUse: Young, uncemented Holocene–Pleistocene soils. Limits: Underpredicts Vs in aged or cemented soils. Measure Vs directly for seismic site class.
  • IX-13 Small-strain shear modulus (Hardin) G_maxUse: Uncemented clays and sands; lab resonant-column basis. Limits: Underestimates aged/cemented soils; field Vs (Gmax = ρVs2) is preferred.
5.1.2 Cone Penetration Test (CPT and CPTu)
At a glance. Provides: Continuous qt, fs and u2 profile; soil behavior type; su, OCR, φ′, modulus and k by correlation. Used for: Stratigraphy between borings, embankment stability, settlement, pile capacity and liquefaction. Catalogue entry
5.1.2.1 Test Procedure and Equipment

The CPT advances a 1.41-in.-diameter cone at a rate of 0.8 in./sec per ASTM D5778. The standard cone has a projected tip area of 1.55 in² and a friction sleeve area of 23.25 in². The piezocone (CPTu) adds a porous filter element — typically at the u₂ position (shoulder behind tip) — to measure pore water pressure during advancement.

CPT Interpretation
CPT Interpretation

Measurements recorded per ASTM D5778:

  • q_c — measured tip resistance (tsf or psi)
  • f_s — sleeve friction (psi or ksf)
  • u₂ — pore water pressure at shoulder (psi) [CPTu only]
5.1.2.2 Corrected Tip Resistance

For CPTu, the measured tip resistance is corrected for unequal area effects:

Equation 5.1-1 — Corrected Total Tip Resistance:

q_t = q_c + u₂ × (1 − a)

Where:

  • q_t = corrected total tip resistance (tsf)
  • q_c = measured tip resistance (tsf)
  • u₂ = measured pore water pressure at shoulder (tsf); [Note: 1 psi = 0.072 tsf; 1 tsf = 13.89 psi]
  • a = net area ratio of cone (dimensionless); typically 0.75–0.85; confirm from manufacturer certificate
Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
qtCPT tip resistance = q_c + u₂ × (1 − a)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
qcmeasured tip resistance (tsf)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
u₂measured pore water pressure at shoulder (tsf)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
anet area ratio of cone (dimensionless)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.typically 0.75–0.85
Cone Penetration Test
Cone Penetration Test
5.1.2.3 Friction Ratio and Soil Behavior Type

The friction ratio is used for soil behavior type (SBT) classification:

Equation 5.1-2 — Friction Ratio:

R_f (%) = (f_s / q_c) × 100

Robertson (1990) SBT zones are used to classify soil type without physical samples. A simplified guide:

SBT ZoneR_f (%)q_c (tsf)Typical Soil
1>4<5Sensitive fine-grained
2>35–25Organic / peat
32–45–50Clay — low to medium OCR
41–210–100Silt mixture
50.5–1.550–200Sand mixture
6<0.5>100Clean sand
7<0.5>300Dense sand / gravel
9>2>100Very stiff fine-grained
Figure 5.1-13. Borehole log used to build the peat cross-section.
Figure 5.1-13. Borehole log used to build the peat cross-section.
Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
qtCPT tip resistanceField testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
5.1.2.4 Undrained Shear Strength from CPTu (N_kt Method)

No additional content.

Equation 5.1-3 — Undrained Shear Strength:

s_u = (q_t − σ_v) / N_kt

Where:

  • s_u = undrained shear strength (tsf)
  • q_t = corrected tip resistance (tsf)
  • σ_v = total vertical stress at depth of interest (tsf) = γ × z / 2,000 [γ in pcf, z in ft, result in tsf]
  • N_kt = cone factor (dimensionless); typically 10–18; use 14 for normally consolidated clays unless site-calibrated
Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
suundrained shear strength = (q_t − σ_v) / N_ktLab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
qtcorrected tip resistance (tsf)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
σvtotal vertical stress at depth of interest (tsf) = γ × z / 2,000 [γ in pcf, z in ft, result in tsf]Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Nktcone factor (dimensionless)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.typically 10–18
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
Equation 5.1-4 — Pore Pressure Ratio:

B_q = (u₂ − u₀) / (q_t − σ_v)

Where u₀ = hydrostatic pore pressure (tsf) = γ_w × h_w / 2,000; γ_w = 62.4 pcf, h_w = depth below water table (ft). B_q > 0.4 typically indicates soft, normally consolidated or sensitive clay — a critical flag on high-speed passenger corridor and Class I railroad alignments located in the Great Lakes region.

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
BqCPT tip resistance = (u₂ − u₀) / (q_t − σ_v)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
u₀hydrostatic pore pressure (tsf) = γ_w × h_w / 2,000Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
γw62.4 pcf, h_w = depth below water table (ft)ConstantPhysical constant or standard value.typically indicates soft, normally consolidated or sensitive clay — a critical flag on Amt
5.1.2.5 Normalized CPT Parameters for Liquefaction Screening

Chapter 6.5 presents the full liquefaction procedure; the key normalized parameter needed from CPT is:

Equation 5.1-5 — Normalized Tip Resistance:

q_c1N = (q_c / P_a) × (P_a / σ'_v)^0.5

Where:

  • q_c = measured tip resistance (tsf); P_a = 2,117 psf = 1.058 tsf
  • σ'_v = vertical effective stress (tsf)
  • q_c1N = dimensionless; used directly in CRR correlation (Youd et al. 2001)

Confirm with the owner railroad whether CPT-based screening is accepted for the project.

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
qc1NCPT tip resistance = (q_c / P_a) × (P_a / σ'_v)^0.5Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
qcmeasured tip resistance (tsf)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
Pa2,117 psf = 1.058 tsfConstantPhysical constant or standard value.project-specific
σ'vvertical effective stress (tsf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Supplemental reference

Normalized soil behavior type and the index Ic

The non-normalized zones in Section 5.1.2.3 drift with depth because qc rises with overburden. Robertson’s normalized chart (Figure 7-S1) removes that effect and collapses the zone boundaries into one number:

Normalized CPT soil behavior type (SBT<sub>N</sub>) chart, Q<sub>t</sub>&ndash;F<sub>r</sub>, with I<sub>c</sub> boundaries and trends for OCR, density and sensitivity (Robertson, 1990; updated 2010).
Supplemental Figure 7-S1. Normalized CPT soil behavior type (SBTN) chart, Qt–Fr, with Ic boundaries and trends for OCR, density and sensitivity (Robertson, 1990; updated 2010). Source: Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc., p. 27.

Ic = [ (3.47 − log Qt)2 + (log Fr + 1.22)2 ]0.5, with Qt = (qt − σvo)/σ′vo and Fr = fs/(qt − σvo) × 100%.

ZoneSoil behavior typeIc(qc/pa)/N60
1Sensitive, fine grainedN/A2.0
2Organic soils – clay> 3.61.0
3Clays – silty clay to clay2.95–3.61.5
4Silt mixtures – clayey silt to silty clay2.60–2.952.0
5Sand mixtures – silty sand to sandy silt2.05–2.603.0
6Sands – clean sand to silty sand1.31–2.055.0
7Gravelly sand to dense sand< 1.316.0
8Very stiff sand to clayey sand*N/A5.0
9Very stiff fine-grained*N/A1.0
CPT for Cohesive Soils
CPT for Cohesive Soils

* Heavily overconsolidated or cemented. Normalized SBT has better than 80% agreement with samples in independent studies (Robertson & Cabal, 2010). Apply the q/N ratios to qt in soft fine-grained soils.

Dissipation tests and ch

Stopping the push and recording pore-pressure decay gives t50, the time to 50% dissipation, which yields the horizontal coefficient of consolidation (Robertson and Cabal report accuracy of about ± half an order of magnitude but excellent repeatability within a profile). Convert to vertical with cv = ch(kv/kh). Watch for dilative silts where u2 rises before it falls — run the test to true equilibrium, or measure t50 from the peak. In plastic clays dissipation can take many hours, so budget rig time accordingly on track-window-limited projects.

CPT calibration checks

Robertson and Cabal recommend recording zero-load readings at the start and end of every sounding and checking wear, O-ring seals, push rods and the pore-pressure filter at the start and end of each test, with load-cell calibration at least every three months (or before and after major projects).

Source: Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.

Case: CPT with boreholes at a peat settlement site on a Canadian main line

About 400 ft of track on a Class I railroad line located in northern Alberta was settling differentially into deep peat. Boreholes (including DH-1 and DH-3) built the stratigraphic section, and a track-mounted CPT rig filled in between them to define the depth and extent of the organic layer. The resulting design used 68 piles of 18-in. diameter, installed in two flights at 10° from vertical, to carry track load through the peat (see Chapter 6.1). Simple hand checks also help: at another site in the Rocky Mountain trench, clay that a thumb could penetrate an inch or more ruled out heavy equipment and rain-day work.

Figure 5.1-12. Track-mounted CPT rig at the peat site.
Figure 5.1-12. Track-mounted CPT rig at the peat site.
Figure 5.1-14. Field consistency check by boot and thumb.
Figure 5.1-14. Field consistency check by boot and thumb.

After Geotechnology for Railroaders Program, Module 6.2, Module 6.1; Module 6.2 §05; Module 6.1 §03. Full reference under Supplemental References.

5.1.2.6 Piezocone (CPTu) Interpretation for Track Subgrade

The cone penetration test gives a continuous profile in minutes, which suits a long corridor where thin soft layers and lenses matter more than a few samples. Look's Handbook of Geotechnical Investigation and Design Tables and the FHWA's Evaluation of Soil and Rock Properties (GEC 5) give the standard interpretation. The tip resistance is corrected for pore pressure acting behind the cone. Soil type is judged from the friction ratio, checked against tip resistance and the pore-pressure ratio. Strength, stress history and friction angle then follow from empirical correlations. A dissipation test gives the horizontal coefficient of consolidation, the property that controls the wick drain design in Chapter 7.2. Simons, Menzies and Matthews' Short Course in Geotechnical Site Investigation and the Corps of Engineers' EM 1110-1-1804 place the CPT within an investigation and recommend calibrating it against borings and laboratory tests.

5.1.2.6.1 Interpretation

Table 5.1-4. CPTu relationships used
QuantityRelationshipSource
Corrected tip resistanceqt = qc + (1 − a)u2Look
Friction ratio; pore pressure ratioFR = fs/qt; Bq = (u2 − u0)/(qt − σvo)Look
Soil type from FR< 1% coarse to medium sand; 1–2% fine or silty sand; 2–5% clays; > 5% peatLook, Table 5.13
Undrained strengthsu = (qt − σvo)/Nkt, Nkt about 10 to 20 (15 typical)GEC 5, Table 33
Preconsolidation stressσ′p = 0.33(qt − σvo)GEC 5, Eq. 41
Friction angle, clean sandφ′ = 17.6° + 11.0 log[(qc/pa)/(σ′vo/pa)0.5]GEC 5
Horizontal consolidationch = T*a²√Ir/t50, T* = 0.245 (u2)GEC 5 (Teh and Houlsby)

5.1.2.6.2 Worked example

The example sounding passes through 6 ft of dense sand fill, about 12 ft of soft clay, and dense sand below. The clay readings give su as low as 479 psf with Nkt = 15. A dissipation test at a 6.9-minute t50 (the same reading and rigidity index as GEC 5's worked example, which gives 29 × 10−3 cm²/s) gives ch = 2.64 ft²/day. That value goes straight into the wick drain calculator. The sands give φ′ of about 41° to 42°. Near the surface the correlation tends to run high because the overburden stress is small.

Push CPTs off the track where possible, at the toe or on the shoulder, and pair at least one with a sampled boring in each soft deposit to calibrate Nkt. Record the cone's net area ratio and u2; without them qt cannot be corrected, and the correction matters most in soft clay where qc is small and u2 is large.

Open the CPTu interpretation calculator →
Corrected tip resistance, friction ratio, Bq, soil type, undrained strength, OCR and friction angle for each reading, plus ch from a dissipation test, with a depth profile.

5.1.2.6.3 Reference values

Table 5.1-5. Modified time factors T* for dissipation tests (Teh and Houlsby, in GEC 5 Table 27)
U (%)1 − UT*, filter at mid-face (u1)T*, filter behind the tip (u2)
200.80.0140.038
300.70.0320.078
400.60.0630.142
500.50.1180.245
600.40.2260.439
700.30.4630.804
800.21.041.60

U is measured from the initial excess pore pressure, not the peak reading, where the two differ.

Table 5.1-6. First-order preconsolidation stress from in situ tests, intact clays (GEC 5, Equations 41 to 46)
TestRelationship
Cone (CPT)σ′p = 0.33(qT − σvo)
Piezocone, face elementσ′p = 0.47(u1 − u0)
Piezocone, shoulder elementσ′p = 0.54(u2 − u0)
Flat dilatometerσ′p = 0.51(p0 − u0)
Self-boring pressuremeterσ′p = 0.45pL
Field vaneσ′p = 3.54su,VST

Fissured clays fall outside these trends; benchmark against oedometer tests.

Table 5.1-7. Cone factor NkT and the reference strength it reproduces (GEC 5, Table 33)
NkTMatches undrained strength from
10Triaxial compression
15Direct simple shear (common default)
20Triaxial extension

GEC 5 notes that 15 is a commonly used value, but the right factor depends on the deposit; calibrate it against laboratory or vane strengths.

Table 5.1-8. Pore pressure ratio and soil type (after Look, Table 5.12)
BqNon-cohesiveCohesive
0.0 to 0.2Dense sand (qT > 52 tsf, 5 MPa)Hard or stiff overconsolidated soil (qT > 104 tsf, 10 MPa)
0.0 to 0.4Medium or loose sand (21 to 52 tsf, 2 to 5 MPa)Stiff clay or silt (10 to 21 tsf, 1 to 2 MPa)
0.2 to 0.8Firm clay or fine silt (qT < 10 tsf, 1 MPa)
0.8 to 1.0Soft clay (qT < 5 tsf, 0.5 MPa)
> 0.8Very soft clay (qT < 2 tsf, 0.2 MPa)

1 MPa is about 10.4 tsf.

5.1.2.6.4 Checks on the worked example

The dissipation method was checked against GEC 5's worked example (a u2 cone, radius 0.70 in. (1.78 cm), Ir = 230). The table repeats the calculation at every stage of dissipation. The computed ch rises as dissipation proceeds, so state which stage was used; the calculator uses the 50% value. The profile below is the worked example sounding, with qt and the undrained strength interpreted in the clay.

Table 5.1-9. ch at each stage of dissipation, GEC 5 Table A-6 and the calculator's equation
Normalized excess pore pressureT* (u2)Time (min)ch, GEC 5 (10−3 cm²/s)ch, recomputed
0.80.0381.91616
0.70.0783.12020
0.60.1424.62525
0.50.2456.92928
0.40.43910.43434
0.30.80415.94140
0.21.600264949
05010015005101520qt (tsf); su (psf / 100)Depth (ft)qt (tsf)su in clay (psf / 100)
Figure 5.1-15. Worked example sounding: corrected tip resistance, and undrained strength in the clay (Nkt = 15).

5.1.2.6.5 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.

  • B.G. Look, Handbook of Geotechnical Investigation and Design Tables (2007): CPT parameters, soil classification from cone resistance, friction ratio and BqFind source ↗
  • P.J. Sabatini and others, Evaluation of Soil and Rock Properties, FHWA Geotechnical Engineering Circular No. 5: CPT correlations for su, σ′p and φ′, and dissipation analysisFind source ↗Library entry
  • N. Simons, B. Menzies and M. Matthews, A Short Course in Geotechnical Site Investigation: planning and quality of site investigationsFind source ↗
  • U.S. Army Corps of Engineers, Geotechnical Investigations, EM 1110-1-1804 (2001): investigation methods and in situ testingOfficial page ↗
5.1.3 Vane Shear Test (VST)
At a glance. Provides: Peak and remolded su of soft clay, and sensitivity. Used for: Embankment stability and staged construction in soft clay, Nkt calibration, and screening of sensitive clays. Catalogue entry
5.1.3.1 Test Procedure

The field vane shear test (ASTM D2573) measures peak and remolded undrained shear strength of soft to firm cohesive soils. A four-bladed vane with H/D = 2 is pushed to the test depth and rotated at about 6°/minute. ASTM D2573 lists the standard vane sizes; the examples in this chapter use a 2.24-in. diameter × 4.49-in. vane, so check the actual vane size before using the equations below. The test is suited to soft clays with s_u < 1.0 tsf. It is inappropriate in sands, gravels, or stiff clays.

Specific applications by railroad client:

  • A Class I railroad — soft Atlantic Coastal Plain clays; VST is commonly specified for embankment stability assessments on sensitive clays.
  • High-speed passenger corridor — marine clays in the Baltimore-Philadelphia segment; VST combined with CPTu.
  • A Class I railroad — Leda (quick) clays in the St. Lawrence Lowlands require VST as a sensitivity check; this manual treats S_t > 8 as a trigger for slope stability re-analysis.
  • Short-line Gulf Coast subsidiaries — Mississippi Delta and Louisiana alluvial clays frequently exhibit s_u < 0.25 tsf; VST is the primary strength measurement tool in these areas.
5.1.3.2 Peak Undrained Shear Strength from Torque

No additional content.

Equation 5.1-6 — Peak Undrained Shear Strength:

For H/D = 2 (standard vane):

s_u (peak) = T_peak / [π × D³ × (H/(2D) + 1/6)]

Where:

  • T_peak = peak torque (lb·ft)
  • D = vane diameter (ft); example vane D = 2.24 in. = 0.187 ft
  • H = vane height (ft); example vane H = 4.49 in. = 0.374 ft

Substituting H/D = 2:

s_u (peak) = T_peak / [π × D³ × (1 + 1/6)]

= T_peak / [π × D³ × 7/6]

= 6 × T_peak / (7 × π × D³)

Converting result from lb/ft² to tsf: divide by 2,000.

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
su (peak)undrained shear strength = T_peak / [π × D³ × (H/(2D) + 1/6)]Lab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
Tpeakpeak torque (lb·ft)Field or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific
Dvane diameter (ft)Test setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific
Hvane height (ft)Test setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific
5.1.3.3 Bjerrum Correction for Anisotropy and Strain Rate

Field vane s_u overestimates design undrained strength in plastic clays because the test is faster than field loading rates and the failure plane is not optimally oriented. The Bjerrum (1972) correction factor μ is applied:

Equation 5.1-7 — Corrected Design s_u:

s_u (design) = μ × s_u (field vane)

Where μ is a function of plasticity index (PI):

PI (%)μ (Bjerrum 1972)
101.00
201.00
400.85
600.75
800.65
100+0.60

For Class I railroad embankment stability analyses on Atlantic Coastal Plain soft clays (typical PI = 40–65%), μ = 0.75–0.85 is standard practice.

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
su (design)undrained shear strength = μ × s_u (field vane)Lab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
PIplasticity indexLab testPI = LL − PL from Atterberg limits (ASTM D4318).CL 7–30, CH 25–80 · by USCS group
5.1.3.4 Sensitivity

No additional content.

Equation 5.1-8 — Sensitivity:

S_t = s_u (peak) / s_u (remolded)

Clays with S_t > 8 are extra-sensitive (S_t > 16 is quick) and call for a project-level risk assessment and a slope stability analysis under seismic loading (Chapters 6.3 and 6.5).

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
suundrained shear strengthLab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
5.1.4 Pressuremeter Test (PMT)
At a glance. Provides: Pressuremeter modulus, limit pressure and in situ horizontal stress. Used for: Footing bearing and settlement by direct methods, lateral load response of piles and shafts, and stiffness of hard-to-sample soils. Catalogue entry
5.1.4.1 Test Procedure

The prebored pressuremeter test (ASTM D4719) is performed in a borehole by expanding a cylindrical membrane against the borehole wall and measuring volume change versus applied pressure. The self-boring pressuremeter (SBP) minimizes disturbance but is rarely warranted on standard railroad projects. The full-displacement PMT (FDPMT) is useful in soft clays and has been used on high-speed passenger corridor foundation studies.

Three pressure phases define the PMT curve:

  1. Pseudo-elastic phase — reloading of borehole wall; slope gives pressuremeter modulus E_PMT
  2. Plastic phase — progressive yielding; yield pressure p_f
  3. Creep / limit pressure — membrane reaches limit pressure p_L at large expansion
5.1.4.2 Pressuremeter Modulus

No additional content.

Equation 5.1-9 — Pressuremeter Modulus:

E_PMT = 2(1 + ν) × V_m × ΔP/ΔV

Where:

  • E_PMT = pressuremeter modulus (psf or ksf)
  • ν = Poisson's ratio (0.33 for drained, 0.50 for undrained)
  • V_m = mean volume of cavity during elastic phase (ft³) = (V_0 + V_f)/2; V_0 = initial borehole volume, V_f = volume at end of elastic phase
  • ΔP/ΔV = slope of pressure–volume curve in elastic phase (psf/ft³)

For preliminary design, E_PMT is correlated to the elastic modulus of soil (E_s) for settlement analysis (Chapter 6.2) using E_s ≈ E_PMT / α, where Ménard's rheological factor α is about 1.0 for overconsolidated clay, 0.67 for normally consolidated clay and 0.5 for weathered or remolded clay.

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
EPMTsoil elastic modulus = 2(1 + ν) × V_m × ΔP/ΔVField test, lab test or correlationPressuremeter (ASTM D4719), DMT (D6635), plate load (D1196), triaxial secant modulus, or correlation with N60 or qc.loose sand 200–500, dense sand 1,000–1,700 ksf · by USCS group
νPoisson's ratio (0.33 for drained, 0.50 for undrained)Assumed (published values)Rarely measured; choose from published ranges. Use 0.5 for undrained clay.0.25–0.40; 0.5 undrained · by USCS group
Vmmean volume of cavity during elastic phase (ft³)Another equationComputed: V_m = (V_0 + V_f)/2project-specific
V0initial borehole volume, V_f = volume at end of elastic phaseTest setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific
ΔP/ΔVslope of pressure–volume curve in elastic phase (psf/ft³)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
5.1.4.3 Limit Pressure and Undrained Shear Strength

No additional content.

Equation 5.1-10 — Undrained Shear Strength from PMT:

s_u = (p_L − p_0) / N_p

Where:

  • p_L = limit pressure (ksf or psf)
  • p_0 = at-rest horizontal total stress (psf) = K₀ × σ'_v + u₀
  • N_p = PMT bearing capacity factor; typically 6.2–7.5 for clays

The PMT is particularly useful where borings encounter interbedded rock and soft clay and CPT advancement is impractical, as in parts of the Appalachian ridges.

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
suundrained shear strength = (p_L − p_0) / N_pLab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
pLlimit pressure (ksf or psf)Field testRead from the in-situ test record: pressuremeter (ASTM D4719), flat dilatometer (D6635) or field vane (D2573).project-specific
p0vertical stress / pore pressure = at-rest horizontal total stress (psf) = K₀ × σ'_v + u₀Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
NpPMT bearing capacity factorChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.typically 6.2–7.5 for clays
5.1.5 Flat Dilatometer Test (DMT)
At a glance. Provides: ID, KD, ED, constrained modulus, OCR and K0 (and Vs from the seismic version). Used for: Settlement, stress history of clays, locating slip surfaces and checking ground improvement. Catalogue entry
5.1.5.1 Test Procedure

The Marchetti flat dilatometer (ASTM D6635, withdrawn 2024) is a blade with a flexible 2.36-in. diameter steel membrane pushed into the ground. Two pressure readings are taken at each depth: the "A" pressure (membrane lift-off) and the "B" pressure (membrane expansion to 0.043 in.). A third reading "C" (deflation) is optional but recommended in soft clays for pore pressure estimation.

The DMT provides three intermediate parameters:

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

Equation 5.1-11 — Material Index (I_D):

I_D = (p_1 − p_0) / (p_0 − u₀)

Equation 5.1-12 — Horizontal Stress Index (K_D):

K_D = (p_0 − u₀) / σ'_v

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
σ'vvertical stress / pore pressureAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Equation 5.1-13 — Dilatometer Modulus (E_D, psf):

E_D = 34.7 × (p_1 − p_0)

Where p_0 and p_1 are corrected contact and expansion pressures (psf); correction equations (ASTM D6635, withdrawn 2024 Annex A1) account for membrane stiffness gauge factors ΔA and ΔB.

Soil classification by I_D:

I_DSoil Type
< 0.6Clay
0.6 – 1.8Silt
> 1.8Sand

K_D interpretation: K_D ≈ 2 in normally consolidated clay; higher values indicate overconsolidation. OCR ≈ (0.5 K_D)^1.56 for clays with I_D < 1.2 (Marchetti 1980).

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
EDsoil elastic modulus = 34.7 × (p_1 − p_0)Field test, lab test or correlationPressuremeter (ASTM D4719), DMT (D6635), plate load (D1196), triaxial secant modulus, or correlation with N60 or qc.loose sand 200–500, dense sand 1,000–1,700 ksf · by USCS group
5.1.5.2 Constrained Modulus and Settlement

No additional content.

Equation 5.1-14 — Constrained Modulus (M_DMT, psf):

M_DMT = R_M × E_D

Where R_M is a correction factor (dimensionless):

  • R_M = 0.14 + 2.36 log(K_D) for I_D ≤ 0.6 (clay)
  • R_M = R_M0 + (2.5 − R_M0) log(K_D), with R_M0 = 0.14 + 0.15(I_D − 0.6), for 0.6 < I_D < 3.0; R_M = 0.5 + 2 log(K_D) for I_D ≥ 3.0
  • R_M = 0.32 + 2.18 log(K_D) where K_D > 10; in all cases use R_M ≥ 0.85 (Marchetti 1980)

M_DMT is analogous to 1/m_v used in Terzaghi consolidation theory and can substitute for oedometer data in settlement calculations (Chapter 6.2) when tube sampling is impractical.

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
MDMTsoil elastic modulus = R_M × E_DField test, lab test or correlationPressuremeter (ASTM D4719), DMT (D6635), plate load (D1196), triaxial secant modulus, or correlation with N60 or qc.loose sand 200–500, dense sand 1,000–1,700 ksf · by USCS group
RM0.14 + 2.36 log(K_D) for I_D < 0.6 (clay)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
5.1.6 Multichannel Analysis of Surface Waves (MASW)
At a glance. Provides: Shear wave velocity profile, Gmax and Vs,30. Used for: Seismic site class, corridor screening for soft ground, and dynamic stiffness. Catalogue entry
5.1.6.1 Principle and Equipment

MASW (no dedicated ASTM standard; see Park, Miller and Xia 1999) measures the dispersion of Rayleigh surface waves to derive a shear-wave velocity (V_s) profile with depth. A linear array of 24 or more 4.5-Hz vertical geophones spaced 3.3–9.8 ft apart is deployed at the surface. An impact source (sledgehammer, weight drop) generates surface waves. The dispersion curve is inverted to yield V_s versus depth.

In Situ & Geophysical Methods — SPT, MASW, SRT, ERT, CHST, DHST, PIT
In Situ & Geophysical Methods — SPT, MASW, SRT, ERT, CHST, DHST, PIT

MASW is a non-invasive option for mainline subgrade rehabilitation projects where track occupancy windows limit drilling. It is also used for track-structure interaction studies, for permafrost boundary mapping and for muskeg (peat bog) thickness profiling.

5.1.6.2 Small-Strain Shear Modulus

No additional content.

Equation 5.1-15 — Small-Strain Shear Modulus:

G_max = ρ × V_s²

Where:

  • G_max = small-strain shear modulus (psf)
  • ρ = soil mass density (slug/ft³) = γ / g = γ (pcf) / 32.2 (ft/s²)
  • V_s = shear-wave velocity (ft/s)

Example: For a sand with γ = 120 pcf and V_s = 820 ft/s:

  • ρ = 120 / 32.2 = 3.727 slug/ft³
  • G_max = 3.727 × (820)² = 3.727 × 672,400 ≈ 2,506,000 psf ≈ 1,253 tsf

G_max is the input stiffness for dynamic track-subgrade interaction models commonly used for high-axle-load corridors (315K GRL).

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
Gmaxρ × V_s²Another equationGmax = ρVs2 = (γ/g)Vs2, from measured Vs.by USCS group
ρsoil mass density (slug/ft³)Another equationComputed: ρ = γ / g = γ (pcf) / 32.2 (ft/s²)project-specific
Vsshear-wave velocity (ft/s)Field testSeismic CPT, downhole or crosshole (ASTM D4428 / D7400), or MASW surface waves.soft clay 250–500, dense sand 800–1,600 ft/s · by USCS group
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
Cross-hole Seismic Test (chst)
Cross-hole Seismic Test (chst)
5.1.6.3 AASHTO / AREMA Site Class from V_s,30

The AASHTO seismic site classification is based on the time-averaged shear-wave velocity in the upper 100 ft, V_s,30:

Equation 5.1-16 — Time-Averaged V_s in Upper 100 ft:

V_s,30 = Σd_i / Σ(d_i / V_si)

Where d_i and V_si are thickness (ft) and shear-wave velocity (ft/s) of each layer in the upper 100 ft.

Site ClassV_s,30 (ft/s)Description
A> 5,000Hard rock
B2,500–5,000Rock
C1,200–2,500Very dense soil / soft rock
D600–1,200Stiff soil
E< 600Soft clay
F—Special study required

AREMA MRE Chapter 9 (Seismic Design for Railway Structures) uses site classes of the same AASHTO/NEHRP form. MASW is the most practical tool for establishing site class when bedrock is too deep for refraction and borings are not available at every bridge location.

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
Vsshear-wave velocityField testSeismic CPT, downhole or crosshole (ASTM D4428 / D7400), or MASW surface waves.soft clay 250–500, dense sand 800–1,600 ft/s · by USCS group
5.1.7 Seismic Refraction
At a glance. Provides: P-wave velocities and depth to faster layers (rock, water table). Used for: Depth to rock, rippability and excavation cost, and placing borings. Catalogue entry
5.1.7.1 Principle

Seismic refraction measures the first-arrival travel times of compressional (P-wave) energy from a surface source to a linear array of geophones. When the P-wave velocity (V_P) of a deeper layer exceeds that of the surface layer, refracted waves arrive at distant geophones before the direct wave, producing a characteristic two-slope travel-time curve. The crossover distance and slopes define layer velocities and depths.

A Class I railroad routinely requires seismic refraction surveys ahead of rock cut design in the Appalachian Mountains to determine:

  • Depth to competent rock (rippability assessment)
  • Whether blasting will be required (blasting near track needs the owner railroad's approval and the applicable federal, state or provincial permits)
  • Whether auger vs. drill-and-blast excavation is feasible (cost driver for Class I railroad alignments located in the Rocky Mountains)
5.1.7.2 Layer Depth from Two-Layer Model

For a simple two-layer model (V₁ over V₂, V₂ > V₁):

Equation 5.1-17 — Crossover Distance:

x_c = 2 × h × √((V₂ + V₁) / (V₂ − V₁))

Equation 5.1-18 — Layer 1 Thickness:

h = (x_c / 2) × √((V₂ − V₁) / (V₂ + V₁))

Where:

  • h = thickness of layer 1 (ft)
  • x_c = crossover distance (ft) — where direct and refracted travel-time lines intersect
  • V₁ = P-wave velocity of layer 1 (ft/s)
  • V₂ = P-wave velocity of layer 2 (ft/s)

Rippability guidance (Caterpillar D9, D11):

V_P (ft/s)RippabilityImplication
< 5,000EasyNo blasting; rippable with D9
5,000–8,000ModerateD11 may be required
8,000–12,000DifficultBlasting likely required
> 12,000Not rippableBlasting required; verify the owner railroad's permit requirements

Blasting near active track requires advance notice to and approval from the owner railroad and the applicable explosives permits; confirm the railroad's distance limit. Attach the seismic refraction results to the blasting plan.

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
hintermediate value computed on this pageAnother equationComputed: h = (x_c / 2) × √((V₂ − V₁) / (V₂ + V₁))project-specific
xccrossover distance (ft) — where direct and refracted travel-time lines intersectField test (geophysics)Seismic refraction (ASTM D5777), MASW, or ground-penetrating radar (ASTM D6432), read from the field record.project-specific
V₁P-wave velocity of layer 1 (ft/s)Field test (geophysics)Seismic refraction (ASTM D5777), MASW, or ground-penetrating radar (ASTM D6432), read from the field record.project-specific
V₂P-wave velocity of layer 2 (ft/s)Field test (geophysics)Seismic refraction (ASTM D5777), MASW, or ground-penetrating radar (ASTM D6432), read from the field record.project-specific
Supplemental reference

Picking the right surface geophysical method

Refraction and MASW are only two of the tools available. The USACE decision matrix (EM 1110-1-1802, Table 2-1) rates each surface method against the question being asked. W = works well in most materials; S = works only under favorable conditions; blank = not recommended.

MethodLithologyTop of rockRipp­abilityWater tableFaultsVoids / cavitiesIn-situ moduliMaterial boundariesBuried ferrous objects
Seismic refractionSWWSSWS
Seismic reflectionSSSSSW
DC resistivitySSSSSSS
ElectromagneticsSSS
Ground-penetrating radarSSSSSS
GravitySSS
MagneticsSW

Only refraction is rated “works well” for top of rock and rippability; every void-detection method is conditional, which is why karst and mine-void screening on rail corridors normally combines two methods (e.g., resistivity plus microgravity or GPR) and confirms anomalies with borings. USACE also stresses writing explicit objectives into the geophysical contract and including a field-release clause so a method that is not working can be stopped after a short trial near ground truth.

Geophysical Methods
Geophysical Methods

Source: U.S. Army Corps of Engineers (1995). Geophysical Exploration for Engineering and Environmental Investigations. EM 1110-1-1802

5.1.8 Method Comparison and Selection Guide
MethodPrimary OutputBest Suited SoilsRailroad Application
CPT / CPTuq_c, f_s, u₂Sands to soft claysLiquefaction screening; settlement (high-speed passenger corridor, a Class I railroad)
VSTs_u, S_tSoft to medium claysEmbankment stability; quick clay
PMTE_PMT, p_LAll soils; rock (SBP)Foundation modulus; stiff interbedded soils
DMTI_D, K_D, M_DMTSoft clays to dense sandsOCR, settlement input; subgrade assessment
MASWV_s profile, G_maxAll soils / rockSite class, G_max; muskeg thickness
Seismic RefractionV_P, layer depthsRock / stiff soilsDepth to rock, rippability

Selection hierarchy:

  1. If settlement governs → CPTu + DMT (primary), VST (soft clay verification)
  2. If liquefaction governs → CPTu preferred over SPT alone; MASW for G_max
  3. If rock depth / rippability governs → Seismic refraction first; supplement with borings
  4. If dynamic stiffness governs → MASW primary; seismic CPT if depth resolution needed
  5. If budget is limited (short line) → MASW + selective SPT borings; skip PMT unless abutment design is involved
Supplemental reference

How far to trust an SPT–CPT conversion

Converting between N and qc is routine when a corridor has old SPT borings and new CPT soundings. A Florida DOT data set (six sites, safety-hammer SPT, electric CPT) shows the limits:

Soil (USCS)Linear fit (qc in MPa)R2
Fine sand (SP)qc = 0.291N + 2.430.60
Silty fine sand (SM)qc = 0.12N + 5.00.35
Silty clayey fine sand (SM/SC)qc = 0.22N + 2.60.37
Fine sand with silt (SP-SM)qc = 0.15N + 7.20.11
Clayey fine sand (SC)qc = 0.06N + 5.70.09

Only clean sand gave a usable correlation, and its qc/N ratio matched the published values; sands with more than about 10% fines scattered badly and had higher qc/N than the literature. Treat a converted N or qc as a screening value. For design, calibrate with side-by-side SPT and CPT at a few stations in each geologic unit, and prefer the Robertson soil-behavior-type ratios (above) over a single constant.

Source: Jarushi, F., AlKaabim, S. and Cosentino, P. (2015). “A New Correlation between SPT and CPT for Various Soils.” Int. J. Geological and Environmental Engineering 9(2) · Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.

Selecting in situ tests for track subgrade

Only two things need answering. For track subgrade, in situ testing has to establish strength (bearing) and stiffness (deformation), plus where the layering changes. Tests support design in one of two ways:

  • Indirectly: test result → soil parameter → design method. For example, vane su → bearing capacity.
  • Directly: test result → performance through a correlation. For example, CPT qc → subgrade modulus (Er ≈ 14 qc) → track modulus (Chapter 2.3, Section 2.3.6).
Table 7-SW1. Suitability of in situ tests for su and deformation in cohesive soils
TestVery soft claySoft clayMedium clayStiff claySilty claySilt
Field vaneAABCCD
CPTAAABBC
CPTuAAABBC
DMTAAAAAB
PMTBBAABC
SPTDCBAAA

A = high suitability; B = moderate; C = limited; D = not applicable.

Strengths and limitations.

  • In situ tests reach soils that are hard to sample, test a larger volume, give a near-continuous profile, and are quick and inexpensive.
  • Their drainage and boundary conditions are not known, the disturbance they cause is not known, they load the soil differently from track, at higher strain rates, and they say little about behavior under repeated load.

Choosing the test. CPT, vane and DMT depend least on the operator. Where stratigraphy is complex or variable, use more of a cheaper test. Where it is simple, fewer, more expensive tests are acceptable.

After Selig & Waters (1994), chs. 4 and 10. Full reference under Supplemental References.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

5.1.9 Worked Examples
The four examples reduce four common in situ tests to design values: CPTu strength in soft clay, vane strength with Bjerrum’s correction, site class from MASW, and subgrade CBR and modulus from a DCP test. Each is laid out as Given, Required, Equations, a flow chart of the steps with a spot check at each, and the Solution.
Example 5.1-1: CPTu Characterization of a Soft Clay

A CPTu sounding supports an embankment widening on a Class I railroad located near Savannah, Georgia. In soft clay the pore pressure acting behind the cone tip is a large share of the measured resistance, so the tip value must be corrected before anything is computed from it.

CrustSoft clay, γ = 108 pcf0510152025303540Depth (ft)GWT 4 ftqc = 4.20 tsf, u2 = 1.80 tsfqt, su, Bq = ?Piezocone soundingGivenAt 22 ft: qc = 4.20 tsf; u2 = 1.80 tsfa = 0.80; Nkt = 14γ = 108 pcf; GWT 4 ftRequiredCorrected tip resistance qt Undrained strength su Pore pressure ratio Bq Black = given; red = required
Given and required for Example 5.1-1.

Given

VariableValueDescription
qc4.20 tsfMeasured tip resistance at 22 ft
u21.80 tsfPore pressure at the shoulder
a0.80Net area ratio
γ108 pcfSoil unit weight
zw4 ftWater table
Nkt14Cone factor

Required

  • Corrected tip resistance qt
  • Undrained strength su
  • Pore pressure ratio Bq

Equations

  1. Eq. 5.1-1: qt = qc + u2(1 − a) — corrected tip resistance
  2. Eq. 5.1-3: su = (qt − σv) / Nkt — undrained strength
  3. Eq. 2: σv = γz; u0 = γw(z − zw)
  4. Eq. 5.1-4: Bq = (u2 − u0) / (qt − σv)

Steps

Step 1 · qt (Eq. 5.1-1)
4.20 + 1.80 × 0.20
qt = 4.56 tsf
↓
Step 2 · Stresses (Eq. 2)
σv = 108 × 22 = 2,376 psf; u0 = 62.4 × 18 = 1,123 psf
σv = 1.188 tsf; u0 = 0.562 tsf; σ′v = 0.626 tsf
↓
Step 3 · su (Eq. 5.1-3)
(4.56 − 1.188) / 14 = 3.372 / 14
su = 0.241 tsf = 482 psf
↓
Step 4 · Bq (Eq. 5.1-4)
(1.80 − 0.562) / 3.372
Bq = 0.37
Spot check: su/σ′v = 0.241/0.626 = 0.38, in the usual range for a normally to lightly overconsolidated clay.
↓
Solution
qt = 4.56 tsf; su = 482 psf; Bq = 0.37.

Solution

qt = 4.56 tsf, su ≈ 480 psf and Bq = 0.37: a soft, normally to lightly overconsolidated clay.

The correction added 0.36 tsf, about 8% of qt but 11% of the net resistance that su comes from; skipping it would overstate the strength. The value goes into the embankment stability analysis (Chapter 6.3). Nkt should be calibrated against vane or laboratory tests on the same clay before design.

Example 5.1-2: Vane Shear Test With Bjerrum’s Correction

Vane tests near the south shore of Lake Erie support an embankment stability check in soft lacustrine clay. The peak and remolded torques give strength and sensitivity; Bjerrum’s correction converts the vane strength to the strength mobilized in an embankment failure.

CrustSoft clay051015202530Depth (ft)Tpeak / Trem = 12.4 / 3.1 lb·ftsu, St, design su = ?Field vane, D = 2.24 in., H/D = 2GivenTpeak = 12.4; Trem = 3.1 lb·ftD = 0.187 ft; H/D = 2PI = 55%Trigger St > 8RequiredPeak and remolded su SensitivityDesign su (Bjerrum)Black = given; red = required
Given and required for Example 5.1-2.

Given

VariableValueDescription
Tpeak, Trem12.4 and 3.1 lb·ftTorques at 18 ft
D2.24 in. = 0.187 ft; H/D = 2Standard vane
PI55%Plasticity index (Chapter 5.2)
ThresholdSt > 8This manual’s trigger for enhanced seismic review

Required

  • Peak and remolded su; sensitivity
  • Design su

Equations

  1. Eq. 5.1-6: su = 6T / (7πD³) — vane strength, H/D = 2
  2. Eq. 5.1-8: St = su,peak / su,remolded — sensitivity
  3. Eq. 5.1-7: su,design = μ su,peak — Bjerrum; μ = 0.85 at PI 40, 0.75 at PI 60, 0.65 at PI 80

Steps

Step 1 · Vane constant
7π × 0.187³ = 7π × 0.00654
0.1438 ft³
↓
Step 2 · Peak and remolded (Eq. 5.1-6)
6 × 12.4 / 0.1438; 6 × 3.1 / 0.1438
517 psf and 129 psf
↓
Step 3 · St (Eq. 5.1-8)
517 / 129
St = 4.0: medium sensitivity, below 8
↓
Step 4 · μ at PI 55% and design su (Eq. 5.1-7)
0.75 + (5/20)(0.10) = 0.78; 0.78 × 517
su,design = 402 psf
Spot check: 517 / 402 = 1.29: the raw vane overstates the strength by about 29%.
↓
Solution
su,design = 402 psf; St = 4.0.

Solution

Peak 517 psf, remolded 129 psf, St = 4.0, and design su = 402 psf.

Using the uncorrected vane strength would overstate the embankment’s stability by nearly 30%. Apply the Bjerrum correction to all vane data used in embankment design. The sensitivity does not reach the enhanced seismic review threshold, but it is high enough that the clay will lose most of its strength if disturbed.

Example 5.1-3: Site Class From an MASW Profile

An MASW survey for a new intermodal facility on a Class I railroad located in the Mid-Continent gives a layered shear wave velocity profile. The site class comes from the time-averaged velocity over the top 100 ft, not the simple average.

Vs = 480 ft/s, γ = 120 pcfVs = 920 ft/sVs = 1,650 ft/sVs = 3,200 ft/s0102030405060708090100Depth (ft)Vs,30 = ? Site class?MASW profile (upper 100 ft)Gmax = ?Given12 ft at 480 ft/s28 ft at 920 ft/s35 ft at 1,650 ft/s25 ft at 3,200 ft/sγ = 120 pcf (upper layer)D: 600–1,200; C: 1,200–2,500 ft/sRequiredVs,30 Site classGmax of the upper layerBlack = given; red = required
Given and required for Example 5.1-3.

Given

VariableValueDescription
Layers12 ft at 480; 28 ft at 920; 35 ft at 1,650; 25 ft at 3,200 ft/sdi and Vsi
γ120 pcfUpper layer, for Gmax
ClassesD: 600 to 1,200 ft/s; C: 1,200 to 2,500 ft/sAASHTO

Required

  • Vs,30 and site class
  • Gmax of the upper layer

Equations

  1. Eq. 5.1-16: Vs,30 = Σdi / Σ(di/Vsi) — time-averaged velocity
  2. Eq. 2: Gmax = (γ/g) Vs²

Steps

Step 1 · Travel times
12/480 + 28/920 + 35/1,650 + 25/3,200 = 0.02500 + 0.03043 + 0.02121 + 0.00781
0.08445 s
↓
Step 2 · Vs,30 (Eq. 5.1-16)
100 / 0.08445
1,185 ft/s: Site Class D, near the C boundary
Spot check: A simple average of the four velocities would give 1,560 ft/s and Class C; the time average gives the soft layers their proper weight.
↓
Step 3 · Gmax (Eq. 2)
(120/32.2) × 480² = 3.727 × 230,400
858,900 psf ≈ 429 tsf
↓
Solution
Vs,30 = 1,185 ft/s, Site Class D.

Solution

Vs,30 = 1,185 ft/s, Site Class D; Gmax of the upper layer ≈ 429 tsf.

Class D calls for the site amplification factors Fa and Fv in seismic design (AREMA Chapter 9; AASHTO). Being within 2% of the Class C boundary, the result is sensitive to the soft top layer; a second MASW line or a downhole test would confirm it before the class is fixed. Gmax is the small-strain stiffness; the operating stiffness under heavy axle loads is lower.

Example 5.1-4: Subgrade Strength from a DCP Test in a Crib Dig

A section of main track on a Class I railroad located in the Ohio Valley needs surfacing every few months, and the ballast at the shoulder is stained with clay. During a track window the ballast is removed from one crib and a DCP is driven through the subballast into the subgrade. The example shows how a DCP record becomes the CBR and modulus values that the trackbed design uses, and why the subgrade soil type must be known before the correlation is chosen.

TieTie BallastBallast Crib dig(ballast removed) Subballast (sand and gravel) Subgrade (lean clay, CL) 17.6-lb hammer, 22.6-in. drop 8 in.16 blows 12 in.8 blows GIVEN Subballast: 8 in. in 16 blows Subgrade (CL): 12 in. in 8 blows ASTM D6951 DPI–CBR correlations Design assumed subgrade Mr = 6,000 psi REQUIRED DPI of each layer (in./blow) CBR of each layer Resilient modulus Mr of each layer Is the design subgrade modulus met? Figure 5.1-16. DCP test at the bottom of a crib dig: the Given (layer penetrations and blows) and the Required.

Given

VariableValueDescription
Layer 18 in. in 16 blowsSubballast, well-graded sand and gravel
Layer 212 in. in 8 blowsSubgrade, lean clay (CL), from a hand-auger sample
Mr,design6,000 psiSubgrade modulus assumed in the original granular layer design

Required

  • DCP index of each layer
  • CBR of each layer
  • Resilient modulus of each layer, and whether the subgrade meets the design value

Equations

  1. Eq. 5.1-20: DPI = penetration / blows — in./blow
  2. Eq. 5.1-21: CBR = 7.80 / DPI1.12 (IS-26) — ASTM D6951 general correlation (written for DPI in in./blow); all soils except CH, and CL with CBR below 10
  3. Eq. 5.1-22: CBR = 5.35 / DPI2 (IS-27) — ASTM D6951 correlation for CL with CBR below 10 (DPI in in./blow)
  4. Eq. 5.1-23: Mr = 2,555 × CBR0.64 (IS-28) — psi (AASHTO mechanistic-empirical design guide)

Steps

Step 1 · DPI (Eq. 5.1-20)
Subballast 8 / 16; subgrade 12 / 8
0.50 and 1.50 in./blow
↓
Step 2 · Subballast CBR (Eq. 5.1-21)
0.501.12 = 0.460; 7.80 / 0.460
CBR = 17
↓
Step 3 · Subgrade CBR: which equation?
General equation: 1.501.12 = 1.575; 7.80 / 1.575 = 4.95. Below 10 in CL, so Eq. 5.1-22 governs: 5.35 / 1.502 = 5.35 / 2.25
CBR = 2.4
Spot check: the general equation would have doubled the subgrade CBR. Classifying the subgrade changed the answer more than any other input.
↓
Step 4 · Moduli (Eq. 5.1-23)
Subballast: 170.64 = 6.12; 2,555 × 6.12. Subgrade: 2.40.64 = 1.75; 2,555 × 1.75
15,600 psi and 4,450 psi
Spot check: the older rule Mr ≈ 1,500 × CBR gives 3,600 psi for the subgrade, the same order. Both are well below 6,000 psi.
↓
Solution
Subballast CBR 17, Mr ≈ 15,600 psi; subgrade CBR 2.4, Mr ≈ 4,500 psi, below the 6,000 psi design value.

Solution

The subballast is adequate (CBR about 17); the subgrade is not (CBR about 2.4, Mr about 4,500 psi against 6,000 psi assumed).

The test points to the subgrade, not the ballast, as the cause of the repeated surfacing. That changes the fix: cleaning or replacing ballast would not last. The low modulus goes into the granular layer thickness check (Chapter 2.1, Section 2.1.17) to find the subballast thickness that keeps subgrade stress within its allowable value, and into the track substructure assessment (Chapter 2.3). One crib is one point: repeat the test at several cribs, chosen from GPR or track geometry records, and check the CBR of the clay in the laboratory before a design is fixed. Because CBR here is a correlated value, record it as such in the risk rating.

Empirical equation note · this example

Equations 5.1-21 to 5.1-23 are correlations. The DCP–CBR equations are converted from ASTM D6951 (which uses mm/blow) to in./blow; the modulus equation is from the AASHTO mechanistic-empirical pavement design guide. Use them for soils within their range and confirm with laboratory CBR or resilient modulus tests.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-12 Corrected cone resistance qₜUse: All piezocone (CPTu) soundings; essential in soft clays and silts. Limits: Correction negligible in clean sands; critical in soft fine-grained soils. Requires u2 filter position.
  • IS-14 Undrained shear strength from CPT SᵤUse: Fine-grained soils penetrated undrained (Ic > ~2.6). Limits: Nkt depends on reference test (vane, CIUC, DSS) and plasticity; calibrate locally. Use Nkt toward upper end for conservative Su.
5.1.10 Representative In Situ Test Data Table
Table 5.1-1. Example CPTu Sounding Data — Class I railroad Soft Ground Characterization located in the Pacific Northwest
Depth (ft)q_c (tsf)f_s (psi)u₂ (psi)R_f (%)SBT Zones_u (psf)B_q
53.10.308.21.044 — Silt mix3820.28
102.40.4811.62.313 — Clay2980.42
151.80.5414.33.463 — Clay2240.59
201.60.6116.14.171 — Sensitive clay1990.72
252.10.4413.82.413 — Clay2620.48
308.70.329.40.426 — Clean sand—0.04
3522.40.187.60.098 — Dense sand—0.01

B_q > 0.5 at 15–20 ft depth indicates soft, sensitive clay layer — triggers VST verification for soft-ground embankment design.

5.1.11 Reference Photographs
Cone Penetration Test
Cone Penetration Test
Vane Shear Test
Vane Shear Test
Pressuremeter Tests
Pressuremeter Tests
5.1.12 Practical Recommendations
  1. Require CPTu (not basic CPT) on all high-speed passenger corridor and Class I railroad soft-ground projects. The u₂ measurement is indispensable for consolidation state assessment and liquefaction screening. Equip the sounding rig with a calibrated piezocone with a net area ratio certificate and saturation log.
  2. Always apply Bjerrum correction to VST data before using s_u in design. Uncorrected vane strength overestimates stability by 15–30% in plastic clays. Record PI from concurrent Atterberg limit tests (Chapter 5.2) at every VST location.
  3. Use MASW proactively on Class I railroad heavy-haul corridors before committing to deep-boring campaigns. A single 500-ft MASW transect at 10-ft spacing establishes lateral variability, identifies soft zones warranting targeted borings, and provides G_max for dynamic subgrade analyses — typically at lower total cost than the equivalent number of borings.
  4. Pair seismic refraction with geologic mapping on Class I railroad located in Appalachia and Class I railroad projects located in the Rocky Mountains. Refraction P-wave velocities calibrated against core borings at key control points can reduce the number of exploratory borings needed for rock cut design.
  5. Specify and record DMT membrane stiffness correction factors (ΔA, ΔB) in field logs. Check the membrane calibration (ΔA, ΔB) before and after each sounding and whenever the membrane is replaced, and record the values in the test log submitted with the data package.
  6. Validate CPTu-derived s_u with at least one VST or UU triaxial test per distinct soil unit on Class I railroad projects. The empirical N_kt factor varies from 10 to 18 depending on clay mineralogy and stress history; site-specific calibration reduces uncertainty in stability analyses.
  7. Consult the owner railroad before mobilizing in-track CPT equipment. Expect to need a track time application and an on-track protection plan; a rig working on the track must be hi-rail capable and meet the railroad's equipment clearance requirements. Plan track windows long enough for setup, the push and any dissipation tests.
Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-12 Corrected cone resistance qₜUse: All piezocone (CPTu) soundings; essential in soft clays and silts. Limits: Correction negligible in clean sands; critical in soft fine-grained soils. Requires u2 filter position.
  • IS-14 Undrained shear strength from CPT SᵤUse: Fine-grained soils penetrated undrained (Ic > ~2.6). Limits: Nkt depends on reference test (vane, CIUC, DSS) and plasticity; calibrate locally. Use Nkt toward upper end for conservative Su.
  • IS-23 Flat dilatometer (DMT) intermediate parameters I_D, K_D, E_DUse: All soils penetrable by the blade; ID < 0.6 clay, 0.6–1.8 silt, >1.8 sand. Limits: ED is not a design modulus; convert with MDMT = RM · ED (Marchetti 1980).
  • IS-25 Field vane strength correction Sᵤ (field)Use: Soft clays, embankment stability on soft ground; based on back-analyzed failures. Typical PI 5–100%. Limits: Not applicable to fissured, varved, or organic clays without local calibration. Scatter about ±25%.
  • IX-13 Small-strain shear modulus (Hardin) G_maxUse: Uncemented clays and sands; lab resonant-column basis. Limits: Underestimates aged/cemented soils; field Vs (Gmax = ρVs2) is preferred.
5.1.13 Field Operations Checklist — In Situ Testing

Checklist · Part V · Subsurface Exploration

Field Operations Checklist — In Situ Testing

Pre-Mobilization0 of 7
During Testing0 of 7
Post-Testing0 of 5
Ticks are saved in this browser.
Plain text version

Pre-Mobilization

  • [ ] Railroad flagging / RWP certification confirmed for the owner railroads, or applicable short-line subsidiary
  • [ ] CPTu cone calibration certificate on file (cone tip area, sleeve area, net area ratio a, piezocone saturation method)
  • [ ] DMT membrane calibration (ΔA, ΔB values) recorded and logged
  • [ ] VST vane dimensions measured and recorded; blade condition inspected
  • [ ] MASW geophone spacing and array length laid out per project plan
  • [ ] Seismic refraction geophone array and shot locations staked; shot holes pre-drilled if needed
  • [ ] GPS receiver verified for State Plane coordinate capture matching client requirements (the owner railroad's coordinate system)

During Testing

  • [ ] CPTu: verify push rate 0.8 in./s ± 25% (20 ± 5 mm/s); log zero readings before each push; record u₂ during hold periods
  • [ ] CPTu: flush and resaturate piezocone filter if u₂ readings become erratic
  • [ ] VST: confirm push depth before rotation; record peak torque to nearest 0.1 lb·ft; rotate 10 full turns for remolded; record time to remolding
  • [ ] PMT: log borehole diameter at test depth; confirm membrane inflation rate and hold time per ASTM D4719
  • [ ] DMT: record A and B readings at each 8-in. depth increment; note any membrane replacement
  • [ ] MASW: record field dispersion curve in real time; flag reversal zones for re-processing
  • [ ] Seismic refraction: record all first arrivals on paper and digital; verify forward and reverse shoots for layer dip assessment

Post-Testing

  • [ ] CPTu data downloaded in raw format and backed up; verify no dropped readings
  • [ ] gINT data entry complete with test type, date, operator, cone serial number, calibration reference
  • [ ] QA review of travel-time plots (refraction), dispersion curves (MASW), and CPTu profiles before demobilization
  • [ ] Coordinate data submitted to project GIS in the format the client requires
  • [ ] Site restoration completed per railroad RWP close-out procedures
Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-12 Corrected cone resistance qₜUse: All piezocone (CPTu) soundings; essential in soft clays and silts. Limits: Correction negligible in clean sands; critical in soft fine-grained soils. Requires u2 filter position.
  • IS-23 Flat dilatometer (DMT) intermediate parameters I_D, K_D, E_DUse: All soils penetrable by the blade; ID < 0.6 clay, 0.6–1.8 silt, >1.8 sand. Limits: ED is not a design modulus; convert with MDMT = RM · ED (Marchetti 1980).
5.1.14 Practice Questions
Each question is worked in the same five parts as the examples.
Question 5.1-1: Corrected Tip Resistance and su

Problem Statement

A bridge approach fill on a Class I railroad has been settling, and the abutment is to be checked for bearing on the clay beneath it. A piezocone sounding through the fill reached the clay, and at 30 ft it recorded the tip resistance and pore pressure shown. The engineer must correct the tip resistance and estimate the undrained strength of the clay for the abutment bearing check.

Approach fillClay0510152025303540Depth (ft)qc = 6.80 tsf, u2 = 0.95 tsfqt, su = ?Piezocone below the approach fillGivenqc = 6.80 tsf; u2 = 0.95 tsfa = 0.82σv = 1.95 tsfNkt = 13Required(a) qt (b) su Black = given; red = required
Given and required for Question 5.1-1.

Given

VariableValueDescription
qc, u26.80 tsf; 0.95 tsf
a0.82
σv1.95 tsf
Nkt13

Required

  • (a) qt
  • (b) su

Equations

  1. Eq. 5.1-1: qt = qc + u2(1 − a) — corrected tip resistance
  2. Eq. 5.1-3: su = (qt − σv) / Nkt — undrained strength

Steps

Step 1 · (a) qt
6.80 + 0.95 × 0.18 = 6.80 + 0.171
6.971 tsf
↓
Step 2 · (b) su
(6.971 − 1.95) / 13 = 5.021 / 13
0.386 tsf = 772 psf
↓
Solution
qt = 6.97 tsf; su = 772 psf.

Solution

(a) qt = 6.97 tsf. (b) su = 0.386 tsf (772 psf), a medium clay.

The value is suitable input for abutment bearing capacity (Chapter 6.1) once Nkt is confirmed for this clay.

Question 5.1-2: Vane Strength, Sensitivity and Design Strength

Problem Statement

A Class I railroad embankment along a lakeshore is to be widened for a passing track, over a highly plastic lacustrine clay. Field vane tests at 12 ft gave the peak and remolded torques shown. The engineer must convert the readings to strength, find the sensitivity, and give the design strength for the widening, noting whether the clay triggers an enhanced seismic review.

CrustLacustrine clay, PI 70%05101520Depth (ft)Tpeak / Trem = 8.6 / 1.4 lb·ftsu, St, design su = ?Field vane, D = 2.24 in., H/D = 2GivenTpeak = 8.6; Trem = 1.4 lb·ftD = 0.187 ftPI = 70%Required(a) Peak su (b) Sensitivity(c) Design su (d) Enhanced seismic review?Black = given; red = required
Given and required for Question 5.1-2.

Given

VariableValueDescription
Tpeak, Trem8.6 and 1.4 lb·ftAt 12 ft
D0.187 ft
PI70%

Required

  • (a) Peak su
  • (b) Sensitivity
  • (c) Design su
  • (d) Whether enhanced seismic review is triggered

Equations

  1. Eq. 5.1-6: su = 6T / (7πD³) — vane strength, H/D = 2
  2. Eq. 5.1-8: St = su,peak / su,remolded — sensitivity
  3. Eq. 5.1-7: su,design = μ su,peak — Bjerrum; μ = 0.85 at PI 40, 0.75 at PI 60, 0.65 at PI 80

Steps

Step 1 · (a) Peak
6 × 8.6 / 0.1438
359 psf
↓
Step 2 · (b) St
Remolded 6 × 1.4 / 0.1438 = 58 psf; 359 / 58
St = 6.1
↓
Step 3 · (c) Design
μ at PI 70% = 0.70; 0.70 × 359
251 psf
↓
Step 4 · (d) Trigger
6.1 < 8
Not triggered
↓
Solution
Design su ≈ 250 psf; St = 6.1.

Solution

(a) 359 psf. (b) St = 6.1. (c) 250 psf. (d) Not triggered.

The clay is sensitive: it will lose most of its strength if disturbed. Load it in stages with piezometer control rather than relying on the design value at one placement.

Question 5.1-3: Site Class and Gmax of a Soft Site

Problem Statement

A new intermodal ramp track is planned on soft ground beside a river. An MASW survey gave the average shear wave velocity of the upper 100 ft and the velocity and unit weight of the upper layer shown. The engineer must assign the seismic site class, find the small-strain modulus of the upper layer, and explain what the results mean for the track and structures.

Vs = 410 ft/s, γ = 110 pcfAverage to 100 ft: Vs,30 = 580 ft/s0102030405060708090100Depth (ft)Site class = ? Significance?MASW at intermodal ramp, beside riverGmax = ?GivenVs,30 = 580 ft/sUpper layer: γ = 110 pcf, Vs = 410 ft/sRequired(a) Site class(b) Gmax of the upper layer(c) SignificanceBlack = given; red = required
Given and required for Question 5.1-3.

Given

VariableValueDescription
Vs,30580 ft/s
γ, Vs110 pcf; 410 ft/sUpper layer

Required

  • (a) Site class
  • (b) Gmax of the upper layer
  • (c) Significance

Equations

  1. Eq. 1: Gmax = (γ/g) Vs²

Steps

Step 1 · (a) Class
580 < 600 ft/s
Site Class E
↓
Step 2 · (b) Gmax
(110/32.2) × 410² = 3.416 × 168,100
574,000 psf = 287 tsf
↓
Solution
Class E; Gmax = 287 tsf.

Solution

(a) Site Class E. (b) Gmax ≈ 287 tsf. (c) Large amplification and a soft subgrade.

Class E carries the largest code amplification factors at low to moderate shaking, and a site-specific response analysis is advisable. The low stiffness also suggests the subgrade may need improvement (Chapter 7.2) to meet track modulus requirements.

Question 5.1-4: Depth to Rock From Seismic Refraction

Problem Statement

A Class I railroad plans to widen a rock cut to add a second track. A two-layer seismic refraction line along the cut gave the overburden and rock velocities and the crossover distance shown. The engineer must estimate the depth to rock and say whether the rock can be ripped or will need blasting next to the operating track.

Overburden V1 = 3,800 ft/sRock V2 = 9,200 ft/sSourcexc = 48 ft (crossover)h = ?Rip or blast?GivenV1 = 3,800 ft/s; V2 = 9,200 ft/sxc = 48 ftRippability difficult: 8,000–12,000 ft/sRequired(a) Depth to rock(b) Is blasting likely?Black = given; red = required
Given and required for Question 5.1-4.

Given

VariableValueDescription
V1, V23,800 and 9,200 ft/sOverburden and rock
xc48 ftCrossover distance
RippabilityDifficult: 8,000 to 12,000 ft/sTable in Section 5.1

Required

  • (a) Depth to rock
  • (b) Whether blasting is likely

Equations

  1. Eq. 5.1-18: h = (xc/2) √[(V2 − V1)/(V2 + V1)]

Steps

Step 1 · (a) h
24 × √(5,400/13,000) = 24 × 0.6445
h = 15.5 ft
↓
Step 2 · (b) Rippability
9,200 ft/s
Difficult: blasting likely
↓
Solution
About 15.5 ft to rock; blasting likely.

Solution

(a) About 15.5 ft. (b) Blasting is likely.

Blasting near active track needs advance notice to the railroad, state explosive permits and a vibration limit agreed with the railroad. Confirm the rock depth with a boring before the excavation is priced.

Question 5.1-5: Dilatometer Parameters and Constrained Modulus

Problem Statement

A dilatometer sounding was made through the foundation of a railroad embankment that is to be raised 4 ft. At 14 ft, above the water table, the corrected pressures and effective stress are as shown. The engineer must compute the dilatometer indices, identify the soil type and find the constrained modulus to be used in the settlement estimate for the raise.

EmbankmentFoundation soil051015202530Depth (ft)p0 = 1,240; p1 = 3,860 psfID, KD, ED, M = ?Flat dilatometer soundingGivenp0 = 1,240 psf; p1 = 3,860 psfσ′v = 780 psfu0 = 0 (above GWT)Embankment raise of 4 ftRequired(a) ID (b) KD (c) ED (d) MDMT and soil typeBlack = given; red = required
Given and required for Question 5.1-5.

Given

VariableValueDescription
p0, p11,240 and 3,860 psfCorrected pressures at 14 ft
σ′v780 psf
u00Above the water table

Required

  • (a) ID
  • (b) KD
  • (c) ED
  • (d) MDMT, and soil type

Equations

  1. Eq. 1: ID = (p1 − p0)/(p0 − u0); KD = (p0 − u0)/σ′v; ED = 34.7(p1 − p0) — Marchetti
  2. Eq. 2: RM0 = 0.14 + 0.15(ID − 0.6); RM = RM0 + (2.5 − RM0) log KD ≥ 0.85; M = RM ED — for 0.6 < ID < 3

Steps

Step 1 · (a) ID
2,620 / 1,240
2.11: sand (> 1.8)
↓
Step 2 · (b) KD
1,240 / 780
1.59
↓
Step 3 · (c) ED
34.7 × 2,620
90,900 psf
↓
Step 4 · (d) RM and M
RM0 = 0.37; RM = 0.37 + 2.13 × 0.201 = 0.80, raised to 0.85; 0.85 × 90,900
MDMT ≈ 77,300 psf (38.6 tsf)
↓
Solution
Sand; ID 2.11, KD 1.59, ED 90,900 psf, M 77,300 psf.

Solution

(a) ID = 2.11, sand. (b) KD = 1.59. (c) ED ≈ 90,900 psf. (d) MDMT ≈ 77,300 psf (38.6 tsf).

A KD this low is typical of loose, normally consolidated sand. ED is not a design modulus; MDMT is, and it feeds the immediate settlement estimate for the widening (Chapter 6.2). The OCR correlation is for clays (ID < 1.2) and is not used here.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-12 Corrected cone resistance qₜUse: All piezocone (CPTu) soundings; essential in soft clays and silts. Limits: Correction negligible in clean sands; critical in soft fine-grained soils. Requires u2 filter position.
  • IS-14 Undrained shear strength from CPT SᵤUse: Fine-grained soils penetrated undrained (Ic > ~2.6). Limits: Nkt depends on reference test (vane, CIUC, DSS) and plasticity; calibrate locally. Use Nkt toward upper end for conservative Su.
  • IS-23 Flat dilatometer (DMT) intermediate parameters I_D, K_D, E_DUse: All soils penetrable by the blade; ID < 0.6 clay, 0.6–1.8 silt, >1.8 sand. Limits: ED is not a design modulus; convert with MDMT = RM · ED (Marchetti 1980).
  • IS-25 Field vane strength correction Sᵤ (field)Use: Soft clays, embankment stability on soft ground; based on back-analyzed failures. Typical PI 5–100%. Limits: Not applicable to fissured, varved, or organic clays without local calibration. Scatter about ±25%.
  • IX-09 At-rest earth pressure coefficient K₀Use: Uncemented soils on primary unloading. Limits: Not valid on reloading or for compacted fills, where K0 is governed by compaction stresses. Cap at passive limit.
  • IX-13 Small-strain shear modulus (Hardin) G_maxUse: Uncemented clays and sands; lab resonant-column basis. Limits: Underestimates aged/cemented soils; field Vs (Gmax = ρVs2) is preferred.
Question 5.1-6: Time-Zero Drift in a Hi-Rail GPR Ballast Survey

Problem Statement

A Class I railroad located in Kansas ran a hi-rail GPR survey to map ballast thickness over a mile of track with recurring surface defects. The contractor’s section shows the ballast–subballast interface getting deeper toward the end of the line. Reviewing the raw data, the engineer finds that the air-wave first break (time zero) also arrives later toward the end of the line, as it does when the electronics warm up. A test pit at the start of the line found the interface 22 in. below the top of tie. The engineer must calibrate the velocity and decide whether the ballast really thickens (Section 5.1.15.4).

051015 Two-way time (ns) Distance along track Start (test pit)End of line Air wave (time zero) Ballast–subballast interface 1.8 ns2.6 ns 9.4 ns10.2 ns Pit: interface at 22 in. GivenAir-wave time zero driftsfrom 1.8 to 2.6 nsInterface: 9.4 ns (start),10.2 ns (end)Test pit at start: 22 in.c = 11.8 in./ns Requiredv, εᵣ, depth at end withand without time-zero correction
Figure 5.1-17. Question 5.1-6: schematic radargram with time-zero drift.

Given

VariableValueDescription
t01.8 ns at start; 2.6 ns at endAir-wave first break (time zero)
tr9.4 ns at start; 10.2 ns at endInterface reflection, raw two-way time
dpit22 in.Interface depth at the test pit (start of line)
c11.8 in./nsSpeed of light in air

Required

  • (a) Wave velocity v in the ballast from the test pit
  • (b) Relative dielectric constant εr
  • (c) Interface depth at the end of the line with time-zero correction
  • (d) Apparent depth at the end if the drift is ignored, and the error

Equations

  1. Eq. 1: d = v (tr − t0) / 2
  2. Eq. 2: εr = (c / v)² (Section 5.1.15)

Steps

Step 1 · (a) Velocity
t = 9.4 − 1.8 = 7.6 ns; v = 2 × 22 / 7.6
v = 5.79 in./ns
↓
Step 2 · (b) Dielectric constant
(11.8 / 5.79)² = 2.04²
εr = 4.2
Spot check: A value of about 4 is typical of clean, fairly dry ballast; fouled or wet ballast reads higher.
↓
Step 3 · (c) Corrected depth at end
t = 10.2 − 2.6 = 7.6 ns; d = 5.79 × 7.6 / 2
d = 22.0 in.: no change in thickness
↓
Step 4 · (d) Uncorrected depth at end
Using the start time zero: t = 10.2 − 1.8 = 8.4 ns; d = 5.79 × 8.4 / 2
d = 24.3 in.: an apparent 2.3 in. of thickening
Spot check: The 0.8 ns drift times v/2 = 0.8 × 2.9 = 2.3 in., the same error.
↓
Solution
v = 5.79 in./ns; εr ≈ 4.2; corrected depth 22 in. at both ends; the apparent thickening is a 2.3-in. artifact of time-zero drift.

Solution

(a) v ≈ 5.8 in./ns. (b) εr ≈ 4.2. (c) 22 in., the same as at the test pit. (d) 24.3 in. if the drift is ignored: a false 2.3 in. of thickening.

The ballast does not thicken; the trend in the contractor’s section is a processing error. Ask for the data to be reprocessed with time zero picked trace by trace (or at least per file), and for a second test pit or core toward the end of the line to confirm the velocity, because a change in fouling or moisture also changes εr and the depth. Look for the cause of the surface defects elsewhere, for example in the subballast or subgrade (Chapter 2.3).

Cross-References
  • Chapter 4.1 — SPT corrections: SPT vs. CPT comparison; energy efficiency basis; SPT-CPT conversion (Robertson & Campanella)
  • Chapter 2.2 — Soil classification: SBT chart zone assignments; USCS correlation from CPT I_D
  • Chapter 6.1 — Bearing capacity: s_u from VST/CPTu used in undrained bearing capacity of spread footings and pile tip resistance
  • Chapter 6.2 — Settlement analysis: M_DMT as M_v substitute; OCR from K_D for preconsolidation stress estimation
  • Chapter 6.3 — Slope stability: Bjerrum-corrected s_u as undrained strength input for embankment stability
  • Chapter 6.5 — Seismic/liquefaction: q_c1N from CPTu for CRR; B_q for pore pressure generation assessment; G_max from MASW for site response
5.1.15 Ground Penetrating Radar Layer Interpretation
At a glance. Provides: Thickness of clean and fouled ballast and subballast, wet zones and ballast pockets. Used for: Planning undercutting and drainage, and placing crib digs and DCP tests. Catalogue entry

Ground penetrating radar (GPR) sends short radio pulses into the track and records reflections from boundaries where the dielectric constant changes: the ballast surface, the clean-to-fouled ballast transition, the ballast-subballast interface and wet zones. Systems mounted on hi-rail vehicles collect a sample every 1 to 2 in. at up to about 25 mph through wood or concrete ties and resolve layers as thin as about 1.5 in. to depths beyond 5 ft. The weakness is that the dielectric constant must be known to turn travel time into depth, and it changes strongly with moisture and fouling.

5.1.15.1 Method

Equation 5.1-19. Velocity, thickness and back-calculated dielectric

v = c/√εr   d = vt/2   εr = (ct/2d)²

c = 11.8 in./ns; t = two-way travel time within the layer; d = layer thickness.

Table 5.1-2. Typical dielectric constants of track materials
MaterialDielectric constant
Air / fresh water1 / 80
Granite ballast: dry, drained, saturatedabout 3.2 to 3.7 / 16 / 26
Trap rock (basalt) ballast: dry / saturatedabout 4.3 to 5.0 / 31
Clayey soil, dry to wet4 to 16
Sandy soil, dry to wet4 to 25
Silty soil, dry to wet9 to 23

Laboratory tests on dry ballast found the dielectric constant rises linearly with clay fouling: for granite, εr ≈ 1.04F + 3.24 (F = fouling fraction by mass, 0 to 0.5), and limestone runs higher than granite at the same fouling. Moisture has a much larger effect, more than doubling εr as void moisture rises, so a high dielectric means wet or fouled ballast and only a crib dig tells which. Wavelength sets the resolution: at 1 GHz in clean ballast the wavelength is about 6 in., and layers thinner than about a quarter of it blur together. Field programs should therefore calibrate at test pits and use GPR to extend the pit results along the track rather than replace them. Other subgrade performance indicators (track geometry, track modulus, cone and plate tests) are compared in the McHenry and Rose review listed below.

5.1.15.2 Worked example: three-layer interpretation with a calibration pit

Table 5.1-3. 1 GHz survey, interval times 3.69, 3.84 and 3.20 ns (calculator output)
LayerAssumed εrThickness
Clean ballast3.312.0 in.
Fouled ballast88.0 in.
Subballast106.0 in.
Depth to subgrade26.0 in.
With a pit showing 13 in. of clean ballastback-calculated27.0 in. to subgrade

A one-inch difference in the calibration pit (12 in. versus 13 in.) changes the back-calculated clean-ballast dielectric from about 3.3 to about 2.8. That is why pits should be measured carefully and located where the GPR record is clear.

Open the GPR layer calculator →
Layer thickness and depth from two-way times and dielectric constants, calibration from a pit, resolution by antenna frequency, and a dry-granite fouling estimate.

5.1.15.3 Sources in the library

These documents are in the reference library. The method summaries above are paraphrased; equations are standard or published forms.

  • Railroad Ballast Evaluation Using Ground-Penetrating Radar (Transportation Research Record 2159), GPR folder: dielectric tests on fouled and wet ballast.Find source ↗
  • Subsurface Evaluation of Railway Track Using Ground Penetrating Radar (report), GPR folder.Find source ↗Library entry
  • Computational Methods for Processing Ground Penetrating Radar Data (thesis), GPR folder.Find source ↗Library entry
  • Railway Geotechnics (Li, Hyslip, Sussmann and Chrismer, 2016), Chapter 8: GPR, wavelength and dielectric table.Find source ↗
  • McHenry and Rose, Railroad Subgrade Performance Indicators: A Review of Available Testing Methods, Ballast folder.Find source ↗Library entry
5.1.15.4 Processing GPR Data and Checking the Processing
Supplemental reference · Bostanudin (2013)

From Raw Radargram to Interpreted Section

A GPR record is a set of traces of received voltage against two-way travel time, displayed side by side along the survey line. What the interpreter sees depends heavily on processing, so the processing chain should be known and documented before results are used for design or maintenance decisions.

Choosing the antenna. Lower frequencies have longer wavelengths, penetrate deeper and resolve less; higher frequencies penetrate less but resolve thinner layers and smaller objects, because the shorter wavelength gives a narrower beam. Depth follows from velocity: d = v t / 2, with v = c / √εr (Section 5.1.15.1).

Standard processing steps, in order:

  1. Data editing. Remove bad traces, sort files, and check the file headers (trace spacing, line interval, start position). Wrong header values put every feature in the wrong place.
  2. Dewow. A running-average filter removes the low-frequency “wow” from induction near the transmitter, centering each trace on zero.
  3. Topographic (static) correction. Shifts traces for changes in surface elevation so that layers plot at the right depth where the surface is not flat.
  4. Time-zero correction. Resets the start of each trace to the ground surface (first break of the air wave or first negative peak). Time zero can drift along a line with temperature changes in the electronics or damaged cables, which makes flat layers appear to dip.
  5. Filtering. Temporal (band-pass) filters along each trace and spatial filters across traces raise the signal-to-noise ratio. Background removal subtracts the average trace and suppresses flat, repeating reflections.
  6. Gain. Time-varying gain restores the amplitude lost with depth so that deep reflections are visible. Gain amplifies noise as well as signal and changes relative amplitudes; automatic gain control in particular should not be used where amplitudes are interpreted, for example to grade fouling or moisture. Keep a constant-gain copy for quantitative work.
  7. Migration. Collapses diffraction hyperbolas from point targets (pipes, rebar, boulders) to their apex and moves dipping reflectors to their true position. It needs a correct velocity; the shape of a hyperbola can itself be used to estimate the velocity.

Clutter and noise. Clutter is reflection from things other than the target: direct coupling between the antennas, multiple reflections between antenna and ground, and many small scatterers. Radio sources nearby (radios, phones, transmitters) add noise. The thesis shows that multivariate methods can separate them: in a singular value decomposition of the radargram, the first one or two components carry most of the clutter and the last components carry noise, so rebuilding the image without both leaves the target reflections. Principal and independent component analysis, and their two-dimensional and combined forms, reduced clutter in simulated and measured data, and the matrix pencil method gave the best extraction of the resonant poles used to characterize targets.

Positioning. Results are only usable if every trace can be tied to a surface location; record survey-wheel or GNSS positions and reference marks along the line.

For railroad work: On track, the regularly spaced ties and the rails produce strong repeating reflections that are clutter for subsurface interpretation; background removal or SVD-type filtering suppresses them, but over-filtering can also remove real, flat layer interfaces such as the ballast–subballast boundary, so compare filtered and unfiltered sections. Ask the GPR contractor for the raw data, the processing log (each step and its parameters), the velocity or dielectric constants used and how they were calibrated at test pits, and the gain used for any amplitude-based fouling index. Tie traces to milepost and track chainage, and apply static corrections where the line crosses grade changes or superelevated curves (Chapter 2.3).

Practice: Question 5.1-6 (Section 5.1.14) shows how uncorrected time-zero drift creates false ballast thickening.

Source: Bostanudin (2013), Chapters 2–6. Full reference under Supplemental References.

Supplemental reference · Jol (ed.) (2009)

Signal Loss, Penetration and Resolution: Will GPR Work Here?

Whether GPR can see a target depends on how fast the signal is absorbed and how large the target is compared with the radar wavelength (Annan; Cassidy, in Jol 2009). Check both before ordering a survey.

Attenuation. In low-loss ground, attenuation is controlled by electrical conductivity:

Eq. 5.1-25: α ≈ 1.64 σ / √εr (dB/m, with σ in mS/m), from α = (Z0/2) σ / √εr with Z0 = 377 ohms. Typical ground loses about 1 dB/m; high-loss ground 10 to 100 dB/m; very low-loss ground 0.01 to 0.1 dB/m. Conductivity rises with water, clay and dissolved salt, so wet clay, marine clay, and ground salted by deicing or brackish water stop GPR within a few feet. Losses also rise with frequency, because of water relaxation and scattering.

Resolution. Two reflectors can be told apart in depth if they are more than about a quarter wavelength apart, and the footprint on a reflector at depth d grows with depth (the first Fresnel zone):

Eq. 5.1-26: λ = v / fc; Δr ≈ λ / 4 (vertical); Eq. 5.1-27: Δl ≈ √(d λ / 2) (lateral radius).

Velocity. Check the velocity on site: from the shape of diffraction hyperbolas, from a common-midpoint (CMP) or wide-angle survey in which the antennas are moved apart about a fixed point, or from a reflector at a known depth in a test pit or boring.

Water content. The complex refractive index model (CRIM) relates the bulk dielectric constant to porosity n, saturation Sw and the dielectric constants of water (about 80), air (1) and the mineral grains (about 4 to 6):

Eq. 5.1-28: √εmix = n Sw √εw + (1 − n) √εm + n (1 − Sw) √εa. It works best for sands and gravels (IX-15); for general soils the Topp equation is the usual alternative (IX-14).

Screening by soil type. The NRCS Ground Penetrating Radar Soil Suitability Maps rate the soils of the conterminous United States for GPR from clay content, clay mineralogy, salinity and sodium in the upper 2 m (about 6.5 ft) (Doolittle and Butnor, in Jol 2009). They are a quick desktop check of whether GPR is worth trying along a corridor (Chapter 3.2).

Question 5.1-7: Can GPR Find a Buried Culvert Under the Embankment?

Problem Statement

Old valuation maps for a Class I railroad located in Mississippi show a 36-in. pipe culvert under a 12-ft embankment, but its exact location and condition are unknown. A sinkhole has opened on the downstream slope. Before drilling, the engineer must decide whether GPR from the shoulder can find the pipe at about 10 ft depth, and with which antenna. Borings at the ends of the fill show two possible conditions: silty sand fill, or clay fill.

TrackAntenna on shoulderFootprint radius Δl = ?36-in. culvertd = 10 ftGivenSand fill: εr = 9, σ = 5 mS/mClay fill: εr = 16, σ = 30 mS/mAntennas: 100 and 400 MHzd = 10 ft (3.05 m)Required(a) Two-way loss to pipe(b) v, λ, Δr, Δl in sand(c) Antenna and time window
Figure 5.1-19. Question 5.1-7: GPR from the shoulder over a buried culvert.

Given

VariableValueDescription
εr, σ9, 5 mS/m (sand); 16, 30 mS/m (clay)Dielectric constant and conductivity of the two possible fills
d10 ft (3.05 m)Depth to the top of the pipe
fc100 and 400 MHzAntenna center frequencies available
c0.984 ft/nsSpeed of light

Required

  • (a) Two-way material loss to the pipe in each fill
  • (b) Velocity, wavelength, vertical resolution and footprint radius at the pipe in sand, for each antenna
  • (c) Antenna choice and time window

Equations

  1. Eq. 5.1-25: α ≈ 1.64 σ / √εr (dB/m); two-way loss = 2 α d
  2. v = c / √εr
  3. Eq. 5.1-26: λ = v / fc, Δr ≈ λ/4; Eq. 5.1-27: Δl ≈ √(dλ/2)
  4. t = 2d / v (two-way time)

Steps

Step 1 · (a) Attenuation and two-way loss
Sand: 1.64 × 5 / 3 = 2.73 dB/m; 2 × 2.73 × 3.05. Clay: 1.64 × 30 / 4 = 12.3 dB/m; 2 × 12.3 × 3.05
About 17 dB (sand); about 75 dB (clay)
↓
Step 2 · (b) Velocity in sand
0.984 / √9
v = 0.328 ft/ns
↓
Step 3 · (b) Wavelength and resolution
400 MHz: λ = 0.328 / 0.4 = 0.82 ft; Δr = 0.82 / 4; Δl = √(10 × 0.82 / 2). 100 MHz: λ = 3.28 ft; Δr = 3.28 / 4; Δl = √(10 × 3.28 / 2)
400 MHz: Δr = 0.2 ft, Δl = 2.0 ft. 100 MHz: Δr = 0.8 ft, Δl = 4.0 ft
Spot check: Δl2 = 2.02 = 4.0 = 10 × 0.82 / 2 = 4.1 ✓.
↓
Step 4 · (c) Time window
2 × 10 / 0.328
t = 61 ns to the top of the pipe; record at least 100 ns
↓
Solution
In sand fill, use 400 MHz (100 or 200 MHz as backup), with lines across the expected pipe line and a 100-ns window. In clay fill, about 75 dB of loss puts GPR at the edge of what will work; use other methods.

Solution

(a) About 17 dB in sand and 75 dB in clay. (b) v = 0.328 ft/ns; 400 MHz gives Δr ≈ 0.2 ft and Δl ≈ 2.0 ft; 100 MHz gives 0.8 ft and 4.0 ft. (c) 400 MHz with at least 100 ns in sand; GPR unlikely to work in clay.

In sand fill, both antennas will show the pipe as a diffraction hyperbola. The 400-MHz footprint (about 4 ft across) is close to the pipe size, so the apex will be sharp and the pipe can be located to within about a foot. Run lines across the expected pipe line, square to it, every 5 to 10 ft along the shoulder, and fit the hyperbola shape to check the velocity. A void or soft zone above the pipe shows as a strong, often bright and phase-reversed reflection. In clay fill the material loss alone is about 75 dB, in the high-loss range, and frequency-dependent loss makes it worse at 400 MHz. Use electrical resistivity imaging (5.1.0.25), microgravity (5.1.0.27), a camera survey from the culvert ends, or probing and borings instead. Check the NRCS suitability map and the boring logs before paying for a GPR survey.

Source: Annan, Ch. 1; Cassidy, Chs. 2 and 5; Doolittle and Butnor, Ch. 6; in Jol (ed.) (2009). Summarized and paraphrased; units converted; attenuation coefficient derived from Annan’s low-loss expression. Full reference under S12.

5.1.16 Borehole Geophysical Logging

Many railroad borings are drilled by rotary or wash methods with samples only at intervals, and rock is often cored only where it matters most. Borehole geophysical logs are run in the open or cased hole after drilling and fill the gaps between samples. They give a continuous record, by depth, of properties that relate to clay content, density, water content, fracturing and seismic velocity. They also give a consistent way of correlating layers from boring to boring. Logging costs little per foot compared with continuous coring, but the hole can usually be logged only once before it is grouted or caves, so the logs must be planned before drilling starts (ASTM D5753).

Table 5.1-12. Borehole geophysical logs useful in geotechnical work
LogMeasuresHole conditionsGeotechnical use
Natural gamma (total or spectral)Natural radioactivity (potassium, uranium, thorium), mostly from clay mineralsOpen or cased (PVC or steel), wet or dryClay content; sand-clay boundaries; correlating till and shale marker beds between borings
Electromagnetic induction (conductivity)Electrical conductivity of the ground around the holeOpen or PVC-cased; not in steelClay layers; saline or contaminated groundwater; pyritic or graphitic zones
Resistivity and spontaneous potential (SP)Resistivity of the formation; natural voltagesOpen, fluid-filledLithology; permeable beds; water quality
NeutronHydrogen content, which is water content below the water table and in clayOpen or cased; licensed radioactive sourcePorosity and water content; with density, clay identification
Gamma-gamma (density)Bulk density from back-scattered gamma raysOpen or cased; licensed source; needs a caliper correctionIn-place density of soil and rock; loose or disturbed zones; voids
CaliperHole diameterOpen holeWashouts, caving, cavities and soft zones; corrects the nuclear logs. In air-filled holes, gamma-gamma back-scatter can serve as a caliper (Mathew and Anderson)
Temperature, differential temperature, fluid conductivity, flowmeterFluid temperature, salinity and vertical flow in the holeOpen, fluid-filledWater-bearing fractures and solution zones; which zones carry the flow (Howard)
Full-waveform sonic, P-S suspensionP- and S-wave velocity of the wallOpen, fluid-filledSmall-strain modulus; rock quality; seismic site class
Optical and acoustic televiewerImage of the borehole wallOpen; clear fluid for opticalFracture orientation, aperture and spacing for kinematic analysis (Section 5.1.0)
Borehole radar (single-hole or crosshole)Radar reflections and transmissionOpen or PVC; resistive rockFracture zones and voids up to tens of feet from the hole, with orientation
Crosshole seismic and tomographyP- and S-wave travel times between holesTwo or more holes, cased and grouted (ASTM D4428)Velocity profile; velocity map between holes; fractured or weak zones
Borehole gravityGravity, giving bulk density over a large volumeLarge-diameter holeAverage density away from the disturbed wall; rarely used in shallow work

Logging overburden

Greenhouse and Pehme logged rotary holes through thick glacial deposits in southern Ontario to establish the stratigraphy and properties without coring every hole. The approach transfers well to railroad corridors:

  • Case each hole with 3-in. PVC drainage pipe, capped at the bottom and filled with fresh water just before logging. The nuclear tools can then be run safely without the hole caving onto them.
  • Log beside at least one continuously cored hole, and run the tools in calibration pits of known density, water content and clay content. The logs can then be read quantitatively, not only as “sand” or “clay.”
  • Distinctive, widespread units (a dense, bouldery till or a clay till) can be recognized on several logs at once and used as marker beds between borings. Units that look alike in drillers’ logs can often be told apart on the geophysical logs.
  • With natural gamma, neutron and gamma-gamma logs together, porosity, clay content and density can be estimated statistically for every layer the hole crosses.

Crosshole seismic tomography in rock

Sources fired in one hole and receivers in another give travel times along many crossing ray paths. These can be inverted for a map of P-wave velocity between the holes. Ivansson showed that the simple straight-ray solution has artifacts from travel-time errors and from bending of rays around slow zones. Check the map against synthetic travel times from a trial model before interpreting it. New used a “representative velocity” grid with points about 3 ft apart in granite and found that velocity reductions matched the observed fracturing. Velocity can be related to rock quality through the velocity index:

Eq. 5.1-24: VI = (VF / VL)2, where VF = field P-wave velocity of the rock mass and VL = P-wave velocity of intact core. VI is roughly equal to RQD/100 (Deere et al. 1967; RK-13), because open joints slow the wave in the field but are absent from the intact core.

Correct each travel time for the trigger and instrument delay, and use the true distance between source and receiver from deviation surveys of both holes. A 1-ft error in a 40-ft spacing changes the velocity by 2.5% and the velocity index by about 5%.

Borehole radar

Single-hole radar with the transmitter and receiver about 40 ft apart showed fracture zones that cross the hole as attenuation and delay of the direct wave. Fractures and voids away from the hole showed as reflections, and their angle gave the orientation of the zone (Olsson and Nilsson). Reflections came from up to about 145 ft away, and an air-filled drift was detected about 100 ft from the hole. Wright, Watts and Bramsoe detected an anomalous zone extending more than 65 ft from the hole in granite. Radar needs resistive ground: it works in fresh crystalline rock, limestone and dry sand, and fails in clay, shale and saline water.

Log quality

A log is only as good as its calibration (Hill). Calibration follows three steps: recorder, system, then tool. Ask the logging contractor for signed and dated calibration records, a field calibration check before and after logging, and a repeat run over a short section to show that the logs repeat. Depth control matters: tie the depth reference to the ground surface or top of casing and check it against a known feature such as the casing shoe. Have the engineer or a trained representative at the hole, because problems found at the office cannot be fixed once the hole is grouted.

For railroad work: Natural gamma and EM conductivity logs run in PVC-cased holes are cheap ways to trace soft clay layers between borings along an embankment or under a bridge approach. Caliper, density and televiewer logs locate voids, solution openings and mine workings at bridge piers and culverts (Chapter 2.11, Soluble Ground and Karst; Chapter 3.10, Mining and Man-Made Hazards). Crosshole seismic or radar between borings at a pier can show whether a weak zone seen in one core continues between the holes. Nuclear logging tools carry licensed radioactive sources, so they need a qualified logging contractor and the source handling rules on the right-of-way. Grout every hole after logging, as the railroad requires, so it does not become a path for water under the track.

Example 5.1-5: Rock Quality Between Borings From Crosshole P-Wave Travel Times

Problem Statement

A new bridge pier for a Class I railroad located in Kentucky will bear on limestone. Core from boring B-2 shows a broken zone near 30 ft, but B-1, 40 ft away, shows sound rock at that depth. A crosshole P-wave survey was run between the two borings to see whether the weak zone extends across the pier footprint. The engineer must convert the travel times to velocities, estimate rock quality, and decide where to put an added core boring.

Overburden Limestone Fractured or solution-enlarged zone? B-1 (source)B-2 (receiver) 20 ft30 ft40 ft L = 40.0 ft (from deviation surveys) Given Measured first arrivals:20 ft: 2.70 ms30 ft: 3.90 ms40 ft: 2.45 ms Trigger delay 0.10 msIntact core Vₗ = 18,000 ft/s Required(a) Vₚ at each depth(b) Velocity index(c) Estimated RQD and the zone to target
Figure 5.1-18. Example 5.1-5: crosshole P-wave survey between two borings at a bridge pier in limestone.

Given

VariableValueDescription
L40.0 ftSource to receiver distance at each depth, from deviation surveys of both holes
tm2.70, 3.90, 2.45 msMeasured first-arrival times at 20, 30 and 40 ft
td0.10 msTrigger and instrument delay, from a zero-offset test
VL18,000 ft/sP-wave velocity of intact core (laboratory pulse velocity)

Required

  • (a) Field P-wave velocity VF at each depth
  • (b) Velocity index at each depth
  • (c) Estimated RQD, and where to put the added boring

Equations

  1. Corrected time: t = tm − td
  2. Velocity: VF = L / t
  3. Eq. 5.1-24: VI = (VF / VL)2; RQD ≈ 100 VI (%)

Steps

Step 1 · Correct the times
2.70 − 0.10; 3.90 − 0.10; 2.45 − 0.10
t = 2.60, 3.80, 2.35 ms
↓
Step 2 · (a) Velocities
40.0 / 0.00260; 40.0 / 0.00380; 40.0 / 0.00235
VF = 15,400; 10,500; 17,000 ft/s
Spot check: 15,385 × 0.00260 = 40.0 ft ✓.
↓
Step 3 · (b) Velocity index
(15,385 / 18,000)2 = 0.8552; (10,526 / 18,000)2 = 0.5852; (17,021 / 18,000)2 = 0.9462
VI = 0.73; 0.34; 0.89
↓
Step 4 · (c) Estimated RQD
100 × VI
RQD ≈ 73% (fair) at 20 ft; 34% (poor) at 30 ft; 89% (good) at 40 ft
Spot check: ignoring the 0.10-ms delay at 30 ft gives 40 / 0.00390 = 10,260 ft/s and VI = 0.32, so the delay changes the answer only slightly here, but by more on shorter paths.
↓
Solution
The slow path at 30 ft (VI ≈ 0.34) shows that the poor zone seen in B-2 extends between the borings. Core a third boring near the middle of the footprint through the 25- to 35-ft interval.

Solution

(a) 15,400, 10,500 and 17,000 ft/s. (b) VI = 0.73, 0.34 and 0.89. (c) Estimated RQD about 73%, 34% and 89%; the weak zone near 30 ft continues across the footprint.

A single straight path gives the average along the path, not the location of the weak rock along it. Shoot the 25- to 35-ft interval at 1- to 2-ft depth steps, with source and receiver offset in depth to get crossing rays, and make a tomogram if the budget allows. Core a third boring near the middle of the footprint and check the core RQD against the velocity index before using the correlation for design. In limestone, a slow zone may be an open or clay-filled solution feature rather than fractured rock. If so, the pier needs the karst treatment of Chapter 2.11 rather than only a lower bearing value.

Source: Killeen (ed.) (1986), GSC Paper 85-27: Greenhouse and Pehme; Ivansson; New; Black; Olsson and Nilsson; Wright, Watts and Bramsoe; Mathew and Anderson; Howard; Hill. ASTM D5753; velocity index after Deere et al. (1967). Summarized and paraphrased; units converted. Full references under S9, S10, S11.

5.1.17 Surface Geophysical Methods: Matching the Method to the Target

Surface geophysics measures a physical property of the ground from the surface: magnetization, electrical conductivity, seismic velocity, density or natural voltage. It works only where the target differs from its surroundings in that property, so the first step is always to ask what the target is and what property contrast it makes (Everett; ASTM D6429). Seismic refraction, MASW, ERT, GPR and microgravity are summarized in the catalogue in Section 5.1.0. This section adds magnetics, electromagnetic induction, resistivity arrays and self-potential, and the inversion and uncertainty that apply to all of them.

Table 5.1-13. Choosing a surface geophysical method for common railroad targets
TargetProperty contrastMethods to considerProblems near track
Buried steel pipe, abandoned well casing, old steel culvert, drumsMagnetization; electrical conductivityMagnetics (gradiometer), EM induction, GPRRails, fences, vehicles and signal equipment give large magnetic and EM noise
Clay layer, saline or contaminated groundwater, landfillConductivityEM induction, ERT, IPTraction power and buried cables affect EM and ERT
Voids, sinkholes, mine workingsDensity; resistivity (air-filled high, water- or clay-filled low)Microgravity, ERT, GPR, seismicTrack vibration affects gravity readings; terrain corrections on embankments
Seepage through an embankment or into a sinkholeNatural voltage from water flow (streaming potential); resistivitySelf-potential, time-lapse ERTStray currents from traction power and cathodic protection
Depth to bedrock, rippabilitySeismic velocity; resistivitySeismic refraction, MASW, ERTTrain noise; schedule shots between trains
Faults, shear zonesVelocity, resistivity, magnetizationRefraction, ERT, magneticsInterpret with geologic mapping

Magnetics

Magnetometers (proton precession, cesium vapor or fluxgate) measure the Earth’s total field, and buried steel shows as a local anomaly of tens to thousands of nanotesla (nT). A gradiometer measures the difference between two sensors one above the other, which removes the slowly varying regional field and the daily (diurnal) variation and sharpens shallow targets. For single-sensor surveys, read a base station during the survey to correct for diurnal change.

Eq. 5.1-29: for a long magnetized pipe, with the anomaly reduced to the pole, the depth from the sensor to the pipe is approximately equal to the full width of the total-field anomaly at half its maximum value (FWHM): d ≈ FWHM. Depth rules for other shapes differ. At mid-latitudes an anomaly that has not been reduced to the pole is lopsided, with a positive and a negative lobe, so the peak may not sit exactly over the pipe.

Electromagnetic induction (terrain conductivity)

A transmitter coil induces currents in the ground and a receiver coil measures the secondary field. At low induction numbers the reading is proportional to the apparent conductivity of the ground (mS/m). The Geonics EM31 has a coil spacing of 3.66 m (12 ft); the EM34 has spacings of 10, 20 and 40 m (33, 66 and 131 ft). The effective depth is about 1.5 times the coil spacing with the coils horizontal (vertical dipole) and about 0.75 times with the coils vertical (horizontal dipole) (McNeill 1980). EM induction is fast, needs no ground contact, and maps clay, saline water, landfill edges and buried metal. Metal fences, rails, pipelines and power lines distort the readings, so keep lines well away from them or note them on the map.

Resistivity arrays and electrical resistivity tomography

Current I is passed between two electrodes and the voltage V is measured between two others. The apparent resistivity is Eq. 5.1-30: ρa = κ V / I, where κ is the geometric factor of the array: κ = 2πa for the Wenner array with electrode spacing a, and κ = πn(n + 1)(n + 2)a for the dipole-dipole array with dipole length a and separation na. Wenner gives good signal and lateral profiles; Schlumberger suits depth soundings; dipole-dipole resolves lateral changes and vertical structures best but has weaker signal at large n. Multi-electrode systems record many combinations as a pseudosection, which is inverted to a resistivity section (ERT).

Self-potential and induced polarization

Self-potential (SP) measures natural voltages between a fixed reference electrode and a roving electrode, using non-polarizing electrodes and a high-impedance voltmeter. Water flowing through soil generates a streaming potential, so SP maps seepage paths: in embankments and dams, around sinkholes, and along leaking pipes. Readings must be corrected for drift and topography, because SP tends to increase downhill along the hydraulic gradient, and they are noisier in heavy vegetation. Induced polarization (IP) measures how the ground stores charge after the current is switched off; it helps tell clay from sand where both have similar resistivity, and responds to some contaminants and disseminated sulfides.

Inversion, non-uniqueness and time-lapse surveys

ERT, EM and gravity sections are produced by inversion: the software finds a model whose computed response matches the measured data. Many different models can fit the same data (non-uniqueness), so inversions add constraints that favor smooth or simple models (regularization). The resulting section is one plausible picture, smoother than the real ground, and less reliable at depth and at the ends of the line. Repeating the same survey over time (time-lapse ERT or microgravity) removes much of this ambiguity, because the change between surveys shows where something is happening, such as a void growing or water moving.

For railroad work: State the target and the property contrast in the scope before asking for a geophysical survey, and ask the contractor to explain why the method will see it. Run lines across the expected target, not along the track; keep away from rails, fences and power lines, or measure their effect with a test line. Ask for the raw data, the inversion settings and a statement of uncertainty, and plan borings, test pits or potholes to check the anomalies. Geophysics shows where to drill; it does not replace drilling. Before drilling or driving piles near suspected buried pipes, confirm locations by vacuum excavation even if the geophysics looks clear.

Example 5.1-6: Locating a Buried Steel Pipe Before Drilling a Signal Foundation

Problem Statement

A Class I railroad located in Ohio plans a 3-ft diameter drilled shaft for a new signal mast. Old right-of-way maps show an abandoned steel water line crossing the railroad near the site, but not its exact location or depth. The utility locator could not trace it. A magnetometer profile was run across the right-of-way, well away from the rails, square to the expected pipe line. The railroad requires 5 ft of horizontal clearance between the shaft and any buried pipe. The engineer must estimate the pipe location and depth and decide whether the shaft must be moved.

half of peak (59 nT) FWHM = ? peak 118 nT 47.252.056.8 Station along profile (ft) steel pipe (depth = ?) planned shaft,3 ft dia. at sta. 49 sensor 1.0 ft above ground GivenPeak 118 nT at sta. 52.059 nT at sta. 47.2 and 56.8Sensor height 1.0 ftShaft: 3 ft dia., centerat sta. 49.0Clearance to pipe: 5 ft Required(a) Depth to the pipe(b) Clear distance from shaft to pipe(c) Where to move the shaft
Figure 5.1-20. Example 5.1-6: magnetometer profile across a buried steel pipe and a planned signal foundation (not to scale).

Given

VariableValueDescription
Tmax118 nT at station 52.0 ftPeak of the total-field anomaly (regional field removed)
x1, x247.2 ft and 56.8 ftStations where the anomaly equals half the peak (59 nT)
h1.0 ftSensor height above ground
Shaft3.0 ft diameter, center at station 49.0 ftPlanned signal foundation
c5.0 ftRequired horizontal clearance from shaft edge to pipe

Required

  • (a) Depth of the pipe below ground
  • (b) Clear horizontal distance from the shaft edge to the pipe
  • (c) Station ranges where the shaft meets the clearance

Equations

  1. FWHM = x2 − x1
  2. Eq. 5.1-29: d ≈ FWHM (sensor to pipe); depth below ground z = d − h
  3. clear distance = |xpipe − xshaft| − D/2

Steps

Step 1 · Width at half maximum
56.8 − 47.2
FWHM = 9.6 ft
Spot check: the half-maximum points are 4.8 ft either side of the peak (52.0 − 47.2 = 4.8; 56.8 − 52.0 = 4.8), so the anomaly is symmetric and the pipe is close to station 52.0.
↓
Step 2 · (a) Depth
d ≈ 9.6 ft from the sensor; z = 9.6 − 1.0
Pipe about 8.6 ft below ground
↓
Step 3 · (b) Clear distance
|52.0 − 49.0| − 3.0/2 = 3.0 − 1.5
1.5 ft, less than the 5.0 ft required
↓
Step 4 · (c) Allowed shaft locations
Center at least 5.0 + 1.5 = 6.5 ft from station 52.0
Shaft center at station 45.5 ft or less, or 58.5 ft or more
↓
Solution
Pipe near station 52 at about 8.6 ft depth; the planned shaft is only 1.5 ft from it. Move the shaft center to station 45.5 or less (or 58.5 or more), after potholing to confirm.

Solution

(a) About 8.6 ft below ground at station 52.0. (b) 1.5 ft clear, which fails the 5-ft requirement. (c) Move the shaft center to station 45.5 ft or less, or 58.5 ft or more.

The 15-ft shaft would pass the pipe depth, so drilling at station 49 risks hitting it. The depth rule is approximate: it assumes a long pipe and an anomaly reduced to the pole, and a lopsided anomaly at this latitude can shift the peak by a few feet. The symmetric half-maximum points here suggest the shift is small, but confirm the pipe by vacuum excavation at station 52 before drilling, and add a second profile 20 to 30 ft along the pipe line to check its direction. If the pipe is found shallower or offset, recompute the clearance. Moving the shaft to station 45 keeps it on the same side of the pipe and avoids a crossing of the signal cable trench over the pipe.

Source: Everett (2013), Chs. 1, 3, 4, 5, 8, 10 and 11–12; McNeill (1980); ASTM D6429. Summarized and paraphrased; units converted. Full references under S13, S14, S15.

Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

Primary sources

Supplemental references

  • Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.Find source ↗Library entry
  • Jarushi, F., AlKaabim, S. and Cosentino, P. (2015). “A New Correlation between SPT and CPT for Various Soils.” Int. J. Geological and Environmental Engineering 9(2)Find source ↗
  • U.S. Army Corps of Engineers (1995). Geophysical Exploration for Engineering and Environmental Investigations. EM 1110-1-1802Official page ↗Library entry
  • McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of KentuckyFind source ↗Library entry

File locations for these documents are listed under Supplemental References.

Supplemental References

Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S7 for railroad clients; tables are condensed from the book and its figures are not reproduced.

  1. Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.Find source ↗Library entry
  2. Jarushi, F., AlKaabim, S. and Cosentino, P. (2015). “A New Correlation between SPT and CPT for Various Soils.” Int. J. Geological and Environmental Engineering 9(2)Find source ↗
  3. U.S. Army Corps of Engineers (1995). Geophysical Exploration for Engineering and Environmental Investigations. EM 1110-1-1802Find source ↗Library entry
  4. McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of KentuckyFind source ↗Library entry
  5. Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
  6. Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
  7. Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: chs. 4 and 10Find source ↗Library entry
  8. Bostanudin, N. J. F. (2013). Computational Methods for Processing Ground Penetrating Radar Data. PhD thesis, School of Engineering, University of Portsmouth, UK. Used on this page: Section 5.1.15 (GPR data processing)Find source ↗Library entry
  9. Killeen, P. G. (ed.) (1986). Borehole Geophysics for Mining and Geotechnical Applications. Geological Survey of Canada Paper 85-27. Ottawa: Supply and Services Canada. Papers used: Greenhouse and Pehme; Ivansson; New; Black; Olsson and Nilsson; Wright, Watts and Bramsoe; Mathew and Anderson; Howard; Hill. Used on this page: Section 5.1.16Find source ↗
  10. ASTM D5753, Standard Guide for Planning and Conducting Geotechnical Borehole Geophysical Logging. West Conshohocken, PA: ASTM International. Used on this page: Section 5.1.16Open source ↗
  11. Deere, D. U., Hendron, A. J., Patton, F. D. and Cording, E. J. (1967). “Design of surface and near-surface construction in rock.” Failure and Breakage of Rock, Proc. 8th U.S. Symposium on Rock Mechanics, C. Fairhurst (ed.). New York: AIME, 237–302. Used on this page: Section 5.1.16Find source ↗
  12. Jol, H. M. (ed.) (2009). Ground Penetrating Radar: Theory and Applications. Amsterdam: Elsevier. Chapters used: Annan (Ch. 1), Cassidy (Chs. 2 and 5), Doolittle and Butnor (Ch. 6), Saarenketo (Ch. 13). Used on this page: Section 5.1.15 (signal loss, resolution, Question 5.1-7)Find source ↗
  13. Everett, M. E. (2013). Near-Surface Applied Geophysics. Cambridge: Cambridge University Press. Chapters used: 1 (workflow and uncertainty), 3 (magnetics), 4 (electrical resistivity), 5 (induced polarization and self-potential), 8 (electromagnetic induction), 10 (time-lapse microgravity), 11–12 (inversion). Used on this page: Section 5.1.17Find source ↗
  14. McNeill, J. D. (1980). Electromagnetic Terrain Conductivity Measurement at Low Induction Numbers. Technical Note TN-6. Mississauga, ON: Geonics Limited. Used on this page: Section 5.1.17Find source ↗
  15. ASTM D6429, Standard Guide for Selecting Surface Geophysical Methods. West Conshohocken, PA: ASTM International. Used on this page: Section 5.1.17Open source ↗
← Previous · 4.0 Subsurface Exploration Chapter 4.1 — Borings and Sampling
Next · 5.0 Testing → Chapter 5.2 — Laboratory Testing Program