Geotechnical Services Manual for Railroad Clients
A Consultant's Reference for Delivering Geotechnical Engineering Services Across North American Railroad Capital Programs
Soil & Rock Properties and Laboratory Testing Database
Typical values and ranges for soil and rock properties, typical laboratory results, ASTM precision (acceptable range of two results), and a catalog of the laboratory and field tests in this chapter with their standards, specimen requirements and design uses. English units, with source, table and page for every value.
Laboratory tests catalog · Typical values and ranges · Download Excel
Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database
Typical laboratory results and ASTM precision for reviewing test data. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Natural water content (saturated) | Loose uniform sand | Saturated, natural | 25 | 27.5 | 30 | % | DAS T2-3, p.12 | |
| Natural water content (saturated) | Dense uniform sand | Saturated, natural | 12 | 14 | 16 | % | DAS T2-3, p.12 | |
| Natural water content (saturated) | Loose angular-grained silty sand | Saturated, natural | 25 | % | DAS T2-3, p.12 | |||
| Natural water content (saturated) | Dense angular-grained silty sand | Saturated, natural | 15 | % | DAS T2-3, p.12 | |||
| Natural water content (saturated) | Stiff clay | Saturated, natural | 20 | % | DAS T2-3, p.12 | |||
| Natural water content (saturated) | Soft clay | Saturated, natural | 30 | 40 | 50 | % | DAS T2-3, p.12 | |
| Natural water content (saturated) | Soft organic clay | Saturated, natural | 80 | 105 | 130 | % | DAS T2-3, p.12 | |
| Natural water content (saturated) | Glacial till | Saturated, natural | 10 | % | DAS T2-3, p.12 | |||
| Specific gravity of soil solids | Sand | SW-SP | 2.63 | 2.65 | 2.67 | – | DAS T3-1, p.14 | |
| Specific gravity of soil solids | Silts | ML-MH | 2.65 | 2.675 | 2.7 | – | DAS T3-1, p.14 | |
| Specific gravity of soil solids | Clay and silty clay | CL-CH | 2.67 | 2.785 | 2.9 | – | DAS T3-1, p.14 | |
| Specific gravity of soil solids | Organic soil | OL / OH / Pt | 2 | – | DAS T3-1, p.14 | |||
| Plasticity index of clay mineral | Kaolinite | Clay mineral | 20 | 30 | 40 | % | DAS ch. 7 comments, p.45 | |
| Plasticity index of clay mineral | Illite | Clay mineral | 35 | 42.5 | 50 | % | DAS ch. 7 comments, p.45 | |
| Plasticity index of clay mineral | Montmorillonite | Clay mineral | 50 | 75 | 100 | % | DAS ch. 7 comments, p.45 | |
| Drained friction angle (direct shear) | Round-grained sand | SP-SW | Loose | 28 | 30 | 32 | deg | DAS ch. 15 comments, p.98 |
| Drained friction angle (direct shear) | Round-grained sand | SP-SW | Medium | 30 | 32.5 | 35 | deg | DAS ch. 15 comments, p.98 |
| Drained friction angle (direct shear) | Round-grained sand | SP-SW | Dense | 34 | 36 | 38 | deg | DAS ch. 15 comments, p.98 |
| Drained friction angle (direct shear) | Angular-grained sand | SP-SW | Loose | 30 | 33 | 36 | deg | DAS ch. 15 comments, p.98 |
| Drained friction angle (direct shear) | Angular-grained sand | SP-SW | Medium | 34 | 37 | 40 | deg | DAS ch. 15 comments, p.98 |
| Drained friction angle (direct shear) | Angular-grained sand | SP-SW | Dense | 40 | 42.5 | 45 | deg | DAS ch. 15 comments, p.98 |
| Pore pressure parameter at failure | Clays with high sensitivity | CL-CH | Triaxial (CU with pore pressure) | 0.75 | 1.125 | 1.5 | – | DAS ch. 18 comments, p.134 |
| Pore pressure parameter at failure | Normally consolidated clays | CL-CH | Triaxial (CU with pore pressure) | 0.5 | 0.75 | 1 | – | DAS ch. 18 comments, p.134 |
| Pore pressure parameter at failure | Overconsolidated clays | CL-CH | Triaxial (CU with pore pressure) | -0.5 | -0.25 | 0 | – | DAS ch. 18 comments, p.134 |
| Pore pressure parameter at failure | Compacted sandy clay | CL-CH | Triaxial (CU with pore pressure) | 0.5 | 0.625 | 0.75 | – | DAS ch. 18 comments, p.134 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Very low expansion potential | 0 | 10 | 20 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Low expansion potential | 21 | 35.5 | 50 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Medium expansion potential | 51 | 70.5 | 90 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | High expansion potential | 91 | 110.5 | 130 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Very high expansion potential | 130 | – | D4829-19 T1, p.2 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Liquid limit – acceptable range of two results | ASTM reference soil | CH | Single operator (repeatability) | 2 | % points | D4318-17e1 T2, p.13 | ||
| Plastic limit – acceptable range of two results | ASTM reference soil | CH | Single operator (repeatability) | 1 | % points | D4318-17e1 T2, p.13 | ||
| Plasticity index – acceptable range of two results | ASTM reference soil | CH | Single operator (repeatability) | 2 | % points | D4318-17e1 T2, p.13 | ||
| Liquid limit – acceptable range of two results | ASTM reference soil | CL | Single operator (repeatability) | 1 | % points | D4318-17e1 T2, p.13 | ||
| Plastic limit – acceptable range of two results | ASTM reference soil | CL | Single operator (repeatability) | 1 | % points | D4318-17e1 T2, p.13 | ||
| Plasticity index – acceptable range of two results | ASTM reference soil | CL | Single operator (repeatability) | 1 | % points | D4318-17e1 T2, p.13 | ||
| Liquid limit – acceptable range of two results | ASTM reference soil | ML | Single operator (repeatability) | 2 | % points | D4318-17e1 T2, p.13 | ||
| Plastic limit – acceptable range of two results | ASTM reference soil | ML | Single operator (repeatability) | 1 | % points | D4318-17e1 T2, p.13 | ||
| Plasticity index – acceptable range of two results | ASTM reference soil | ML | Single operator (repeatability) | 2 | % points | D4318-17e1 T2, p.13 | ||
| Liquid limit – acceptable range of two results | ASTM reference soil | CH | Multilaboratory (reproducibility) | 4 | % points | D4318-17e1 T2, p.13 | ||
| Plastic limit – acceptable range of two results | ASTM reference soil | CH | Multilaboratory (reproducibility) | 6 | % points | D4318-17e1 T2, p.13 | ||
| Plasticity index – acceptable range of two results | ASTM reference soil | CH | Multilaboratory (reproducibility) | 7 | % points | D4318-17e1 T2, p.13 | ||
| Liquid limit – acceptable range of two results | ASTM reference soil | CL | Multilaboratory (reproducibility) | 3 | % points | D4318-17e1 T2, p.13 | ||
| Plastic limit – acceptable range of two results | ASTM reference soil | CL | Multilaboratory (reproducibility) | 3 | % points | D4318-17e1 T2, p.13 | ||
| Plasticity index – acceptable range of two results | ASTM reference soil | CL | Multilaboratory (reproducibility) | 5 | % points | D4318-17e1 T2, p.13 | ||
| Liquid limit – acceptable range of two results | ASTM reference soil | ML | Multilaboratory (reproducibility) | 4 | % points | D4318-17e1 T2, p.13 | ||
| Plastic limit – acceptable range of two results | ASTM reference soil | ML | Multilaboratory (reproducibility) | 3 | % points | D4318-17e1 T2, p.13 | ||
| Plasticity index – acceptable range of two results | ASTM reference soil | ML | Multilaboratory (reproducibility) | 5 | % points | D4318-17e1 T2, p.13 | ||
| Specific gravity – acceptable range of two results | ASTM reference soil | CH | Single operator (repeatability) | 0.03 | – | D854-14 T3, p.7 | ||
| Specific gravity – acceptable range of two results | ASTM reference soil | CL | Single operator (repeatability) | 0.02 | – | D854-14 T3, p.7 | ||
| Specific gravity – acceptable range of two results | ASTM reference soil | ML | Single operator (repeatability) | 0.02 | – | D854-14 T3, p.7 | ||
| Specific gravity – acceptable range of two results | ASTM reference soil | SP | Single operator (repeatability) | 0.02 | – | D854-14 T3, p.7 | ||
| Specific gravity – acceptable range of two results | ASTM reference soil | CH | Multilaboratory (reproducibility) | 0.08 | – | D854-14 T3, p.7 | ||
| Specific gravity – acceptable range of two results | ASTM reference soil | CL | Multilaboratory (reproducibility) | 0.06 | – | D854-14 T3, p.7 | ||
| Specific gravity – acceptable range of two results | ASTM reference soil | ML | Multilaboratory (reproducibility) | 0.06 | – | D854-14 T3, p.7 | ||
| Specific gravity – acceptable range of two results | ASTM reference soil | SP | Multilaboratory (reproducibility) | 0.02 | – | D854-14 T3, p.7 | ||
| Percent fines (No. 200 wash) – acceptable range of two results | ASTM reference soil | CH | Single operator (repeatability) | 0.4 | % points | D1140-17 T2, p.5 | ||
| Percent fines (No. 200 wash) – acceptable range of two results | ASTM reference soil | CL | Single operator (repeatability) | 0.4 | % points | D1140-17 T2, p.5 | ||
| Percent fines (No. 200 wash) – acceptable range of two results | ASTM reference soil | ML | Single operator (repeatability) | 0.3 | % points | D1140-17 T2, p.5 | ||
| Percent fines (No. 200 wash) – acceptable range of two results | ASTM reference soil | SP | Single operator (repeatability) | 0.5 | % points | D1140-17 T2, p.5 | ||
| Percent fines (No. 200 wash) – acceptable range of two results | ASTM reference soil | CH | Multilaboratory (reproducibility) | 0.6 | % points | D1140-17 T2, p.5 | ||
| Percent fines (No. 200 wash) – acceptable range of two results | ASTM reference soil | CL | Multilaboratory (reproducibility) | 1.1 | % points | D1140-17 T2, p.5 | ||
| Percent fines (No. 200 wash) – acceptable range of two results | ASTM reference soil | ML | Multilaboratory (reproducibility) | 0.4 | % points | D1140-17 T2, p.5 | ||
| Percent fines (No. 200 wash) – acceptable range of two results | ASTM reference soil | SP | Multilaboratory (reproducibility) | 1 | % points | D1140-17 T2, p.5 | ||
| Maximum dry unit weight, standard effort – acceptable range of two results | ASTM reference soil | CH | Single operator (repeatability) | 1.3 | pcf | D698-12e2 T3, p.10 | ||
| Optimum water content, standard effort – acceptable range of two results | ASTM reference soil | CH | Single operator (repeatability) | 0.7 | % points | D698-12e2 T3, p.10 | ||
| Maximum dry unit weight, standard effort – acceptable range of two results | ASTM reference soil | CL | Single operator (repeatability) | 1.2 | pcf | D698-12e2 T3, p.10 | ||
| Optimum water content, standard effort – acceptable range of two results | ASTM reference soil | CL | Single operator (repeatability) | 0.9 | % points | D698-12e2 T3, p.10 | ||
| Maximum dry unit weight, standard effort – acceptable range of two results | ASTM reference soil | ML | Single operator (repeatability) | 1.3 | pcf | D698-12e2 T3, p.10 | ||
| Optimum water content, standard effort – acceptable range of two results | ASTM reference soil | ML | Single operator (repeatability) | 0.9 | % points | D698-12e2 T3, p.10 | ||
| Maximum dry unit weight, standard effort – acceptable range of two results | ASTM reference soil | CH | Multilaboratory (reproducibility) | 3.9 | pcf | D698-12e2 T3, p.10 | ||
| Optimum water content, standard effort – acceptable range of two results | ASTM reference soil | CH | Multilaboratory (reproducibility) | 1.8 | % points | D698-12e2 T3, p.10 | ||
| Maximum dry unit weight, standard effort – acceptable range of two results | ASTM reference soil | CL | Multilaboratory (reproducibility) | 2.3 | pcf | D698-12e2 T3, p.10 | ||
| Optimum water content, standard effort – acceptable range of two results | ASTM reference soil | CL | Multilaboratory (reproducibility) | 1.5 | % points | D698-12e2 T3, p.10 | ||
| Maximum dry unit weight, standard effort – acceptable range of two results | ASTM reference soil | ML | Multilaboratory (reproducibility) | 1.6 | pcf | D698-12e2 T3, p.10 | ||
| Optimum water content, standard effort – acceptable range of two results | ASTM reference soil | ML | Multilaboratory (reproducibility) | 1.3 | % points | D698-12e2 T3, p.10 | ||
| Maximum dry unit weight, modified effort – acceptable range of two results | Lean clay with sand / sandy lean clay (AMRL samples) | CL | Single operator (repeatability) | 1.8 | pcf | D1557-12e1 T3, p.11 | ||
| Optimum water content, modified effort – acceptable range of two results | Lean clay with sand / sandy lean clay (AMRL samples) | CL | Single operator (repeatability) | 1 | % points | D1557-12e1 T3, p.11 | ||
| Maximum dry unit weight, modified effort – acceptable range of two results | Lean clay with sand / sandy lean clay (AMRL samples) | CL | Multilaboratory (reproducibility) | 4.4 | pcf | D1557-12e1 T3, p.11 | ||
| Optimum water content, modified effort – acceptable range of two results | Lean clay with sand / sandy lean clay (AMRL samples) | CL | Multilaboratory (reproducibility) | 2.1 | % points | D1557-12e1 T3, p.11 | ||
| CBR – coefficient of variation, single operator | Laboratory-compacted soil | Compacted per D698 | 8.2 | % | D1883-16 T12.1, p.10 | |||
| CBR – coefficient of variation, single operator | Laboratory-compacted soil | Compacted per D1557 | 5.9 | % | D1883-16 T12.1, p.10 | |||
| Sand equivalent – single-operator standard deviation | Granular soil / fine aggregate | SE > 80 | 1.5 | SE units | D2419-14 T13.1.1, p.9 | |||
| Sand equivalent – single-operator standard deviation | Granular soil / fine aggregate | SE < 80 | 2.9 | SE units | D2419-14 T13.1.1, p.9 | |||
| Nuclear gauge wet density – 95% repeatability limit | ASTM reference soil | ML | Direct transmission | 1.3 | pcf | D6938-17a T1, p.6 | ||
| Nuclear gauge wet density – 95% reproducibility limit | ASTM reference soil | ML | Direct transmission | 2.1 | pcf | D6938-17a T1, p.6 | ||
| Nuclear gauge wet density – 95% repeatability limit | ASTM reference soil | CL | Direct transmission | 0.9 | pcf | D6938-17a T1, p.6 | ||
| Nuclear gauge wet density – 95% reproducibility limit | ASTM reference soil | CL | Direct transmission | 1.9 | pcf | D6938-17a T1, p.6 | ||
| Nuclear gauge wet density – 95% repeatability limit | ASTM reference soil | SP | Direct transmission | 0.7 | pcf | D6938-17a T1, p.6 | ||
| Nuclear gauge wet density – 95% reproducibility limit | ASTM reference soil | SP | Direct transmission | 1.9 | pcf | D6938-17a T1, p.6 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Coefficient of variation – lab measurement error | Clay, silt – Undrained strength, triaxial compression su(TC) | CL-ML | Phoon & Kulhawy (1999a) | 8 | 19 | 38 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Clay, silt – Undrained strength, direct shear su(DS) | CL-ML | Phoon & Kulhawy (1999a) | 19 | 20 | 20 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Clay – Undrained strength, lab vane su(LV) | CL-CH | Phoon & Kulhawy (1999a) | 5 | 13 | 37 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Clay, silt – Friction angle, triaxial φ′(TC) | CL-ML | Phoon & Kulhawy (1999a) | 7 | 24 | 56 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Clay, silt – Friction angle, direct shear φ′(DS) | CL-ML | Phoon & Kulhawy (1999a) | 3 | 13 | 29 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Sand – Friction angle, direct shear φ′(DS) | SW-SM | Phoon & Kulhawy (1999a) | 13 | 14 | 14 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Sand, silt – tan φ′, triaxial | SM-ML | Phoon & Kulhawy (1999a) | 2 | 8 | 22 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Clay – tan φ′, direct shear | CL-CH | Phoon & Kulhawy (1999a) | 6 | 14 | 22 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Fine-grained soils – Natural moisture content wn | ML-CH | Phoon & Kulhawy (1999a) | 6 | 8 | 12 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Fine-grained soils – Liquid limit wL | ML-CH | Phoon & Kulhawy (1999a) | 3 | 7 | 11 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Fine-grained soils – Plastic limit wP | ML-CH | Phoon & Kulhawy (1999a) | 7 | 10 | 18 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Fine-grained soils – Plasticity index PI | ML-CH | Phoon & Kulhawy (1999a) | 5 | 24 | 51 | % | FGE T31.4, p.480 |
| Coefficient of variation – lab measurement error | Fine-grained soils – Total unit weight γ | ML-CH | Phoon & Kulhawy (1999a) | 1 | 1 | 2 | % | FGE T31.4, p.480 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Ballast – material passing No. 200 sieve | Ballast – Granite and traprock | AREMA limit (max); ASTM C117 | 1 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – material passing No. 200 sieve | Ballast – Quartzite | AREMA limit (max); ASTM C117 | 1 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – material passing No. 200 sieve | Ballast – Limestone | AREMA limit (max); ASTM C117 | 1 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – material passing No. 200 sieve | Ballast – Dolomitic limestone | AREMA limit (max); ASTM C117 | 1 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – bulk specific gravity | Ballast – Granite and traprock | AREMA limit (min); ASTM C127 | 2.6 | – | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – bulk specific gravity | Ballast – Quartzite | AREMA limit (min); ASTM C127 | 2.6 | – | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – bulk specific gravity | Ballast – Limestone | AREMA limit (min); ASTM C127 | 2.6 | – | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – bulk specific gravity | Ballast – Dolomitic limestone | AREMA limit (min); ASTM C127 | 2.65 | – | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – absorption | Ballast – Granite and traprock | AREMA limit (max); ASTM C127 | 1 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – absorption | Ballast – Quartzite | AREMA limit (max); ASTM C127 | 1 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – absorption | Ballast – Limestone | AREMA limit (max); ASTM C127 | 2 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – absorption | Ballast – Dolomitic limestone | AREMA limit (max); ASTM C127 | 2 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – clay lumps and friable particles | Ballast – Granite and traprock | AREMA limit (max); ASTM C142 | 0.5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – clay lumps and friable particles | Ballast – Quartzite | AREMA limit (max); ASTM C142 | 0.5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – clay lumps and friable particles | Ballast – Limestone | AREMA limit (max); ASTM C142 | 0.5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – clay lumps and friable particles | Ballast – Dolomitic limestone | AREMA limit (max); ASTM C142 | 0.5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – Los Angeles abrasion loss (LAA) | Ballast – Granite and traprock | AREMA limit (max); ASTM C535 or C131 | 35 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – Los Angeles abrasion loss (LAA) | Ballast – Quartzite | AREMA limit (max); ASTM C535 or C131 | 30 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – Los Angeles abrasion loss (LAA) | Ballast – Limestone | AREMA limit (max); ASTM C535 or C131 | 30 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – Los Angeles abrasion loss (LAA) | Ballast – Dolomitic limestone | AREMA limit (max); ASTM C535 or C131 | 30 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – sodium sulfate soundness, 5 cycles | Ballast – Granite and traprock | AREMA limit (max); ASTM C88 | 5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – sodium sulfate soundness, 5 cycles | Ballast – Quartzite | AREMA limit (max); ASTM C88 | 5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – sodium sulfate soundness, 5 cycles | Ballast – Limestone | AREMA limit (max); ASTM C88 | 5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – sodium sulfate soundness, 5 cycles | Ballast – Dolomitic limestone | AREMA limit (max); ASTM C88 | 5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – flat or elongated particles | Ballast – Granite and traprock | AREMA limit (max); ASTM D4791 Method A | 5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – flat or elongated particles | Ballast – Quartzite | AREMA limit (max); ASTM D4791 Method A | 5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – flat or elongated particles | Ballast – Limestone | AREMA limit (max); ASTM D4791 Method A | 5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Ballast – flat or elongated particles | Ballast – Dolomitic limestone | AREMA limit (max); ASTM D4791 Method A | 5 | % | AREMA19 T1-2-1, p.1-2-11 | |||
| Subballast lateral stress ratio | Subballast | 0.4 | 0.7 | 1 | – | LI16 T3.8, p.105 | ||
| Subballast fines (passing No. 200) | Subballast | AREMA maximum | 5 | % | AREMA19 text, p.1-2-25 | |||
| Subballast LA abrasion loss | Subballast | Reasonable acceptance limit | 50 | % | LI16 text, p.105 | |||
| Subballast sodium sulfate soundness loss | Subballast | Reasonable acceptance limit | 5 | % | LI16 text, p.105 |
| Estimate | Correlation | Limits / notes | Source |
|---|---|---|---|
| Compression index – clays | Cc = 0.009 (LL − 10) (organic soils, sensitivity < 4) | Skempton / Terzaghi & Peck | USACE 3-7, p.59 |
| Compression index – clays | Cc = 1.15 (e0 − 0.35); Cc = 0.012 wn; Cc = 0.01 (LL − 13) | All clays | USACE 3-7, p.59 |
| Compression index – organic soils, peat | Cc = 0.0115 wn | wn in percent | USACE 3-7, p.59 |
| Compression index – varved clays | Cc = (1 + e0) [0.1 + 0.006 (wn − 25)] | USACE 3-7, p.59 | |
| Compression index – remolded clays | Cc = 0.007 (LL − 7) | Azzouz et al. (1976) | CB 5.2, p.109 |
| Compression index – inorganic silt/clay | Cc = 0.30 (e0 − 0.27); Cc = 0.75 (e0 − 0.5) | Azzouz et al. (1976) | CB 5.2, p.109 |
| Recompression index | Cr ≈ 0.05–0.10 Cc (range 0.015–0.35) | Roscoe et al. (1958) | CB 5.1 text, p.108 |
| Secondary compression index | Cα ≈ 0.0001 wn (10 < wn < 3000%) | NAVFAC DM 7.1 | USACE 3-14 text, p.79 |
| Plasticity index from linear shrinkage | PI ≈ 2.13 LS | Use where PL and LL are difficult | LOOK 2.12, p.49 |
| Liquidity and consistency index | LI = (w − PL)/PI; CI = (LL − w)/PI | CB Eq. 6.15–6.16, p.145 |
Full database · Laboratory tests · Download Excel · Library documents for this chapter · Calculators for this chapter
Laboratory testing is the scientific foundation of every geotechnical design. Field observations classify soils and rock; laboratory tests quantify the engineering properties that drive bearing capacity, settlement, slope stability, and pavement design calculations. For railroad capital projects, the consequences of poorly selected or inadequately executed lab programs are magnified by the scale of the loading environment — 286,000-lb gross rail load, cyclic dynamic amplification, and serviceability tolerances measured in fractions of an inch.
This chapter defines the laboratory testing program for geotechnical investigations serving owner railroads. It covers test selection by project type, ASTM standards for every test method, sample handling and chain of custody, laboratory QA/QC, turnaround time expectations by client, and accreditation requirements. All test results are expressed in English units throughout. The consultant must confirm current ASTM edition requirements with each client's engineering standards before mobilizing a laboratory program — clients periodically update their referenced editions.
The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.
| ID | Correlation | Gives |
|---|---|---|
| RK-10 | UCS from point load index | σ꜀ |
| IX-01 | Compression index from liquid limit (undisturbed) | C꜀ |
| IX-02 | Compression index from liquid limit (remolded) | C꜀ |
| IX-03 | Compression index from void ratio | C꜀ |
| IX-04 | Compression index from plasticity index | C꜀ |
| IX-05 | Secondary compression ratio | C_α |
| IX-06 | Normalized undrained strength from plasticity | Sᵤ/σ' |
| IX-08 | Friction angle of NC clay from plasticity | φ' |
| IX-10 | Undrained strength from liquidity index | Sᵤ (remolded) |
| IX-11 | Hazen hydraulic conductivity | k |
| IX-13 | Small-strain shear modulus (Hardin) | G_max |
The laboratory testing program for a railroad geotechnical investigation must be:
| Test | Siding/Track Ext. | Intermodal Yard | Bridge/Culvert | Mainline Rehab | Emergency |
|---|---|---|---|---|---|
| Moisture content (D2216) | All samples | All samples | All samples | All samples | All samples |
| Atterberg limits (D4318) | Fine-grained | Fine-grained | Fine-grained | Fine-grained | Fine-grained |
| Grain size (D6913/D7928) | Select | Select | Select | Select | Priority |
| Specific gravity (D854) | Consolidation set | All triaxial set | All triaxial set | Consolidation set | Priority |
| Standard Proctor (D698) | Structure backfill | As needed | Structure backfill | As needed | Not typically |
| Modified Proctor (D1557) | Embankment | Yes | Embankment | Yes | Not typically |
| CBR (D1883) | Subgrade | Pavement design | Not typically | Subgrade rehab | Not typically |
| Resilient Modulus (T307) | Subgrade | Pavement design | Not typically | Subgrade rehab | Not typically |
| Consolidation (D2435) | Soft clay | Soft clay | Soft clay | Soft clay | Not typically |
| UU Triaxial (D2850) | Not typically | Slope stability | Slope stability | Slope stability | Quick stability |
| CU Triaxial (D4767) | Not typically | Critical slopes | Critical slopes | Critical slopes | Not typically |
| Direct shear (D3080) | Not typically | Residual φ' | Rock joints | Residual φ' | Not typically |
| Unconfined compression (D2166) | Not typically | Select | Select | Select | Quick s_u |
| Permeability (D2434/D5084) | Drainage design | Drainage design | Drainage design | Drainage design | Not typically |
| Point load index (D5731) | Rock cuts | Rock cuts | Rock cuts | Rock cuts | Not typically |
| Sodium sulfate soundness | Ballast | Ballast | Not typically | Ballast rehab | Not typically |
| LA Abrasion (C131) | Ballast | Ballast | Not typically | Ballast rehab | Not typically |

For ballast-source qualification, ballast condition surveys and subballast design, add the following to the soil program:

After Selig & Waters (1994), chs. 7, 8 and 9. Full reference under Supplemental References.
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
Method: Oven-dry at 230 ± 9°F for minimum 16 hours (peat and organic soils: 140°F).
Equation:
w = (M_water / M_dry) × 100%
where M_water = mass of water (mass_wet − mass_dry); M_dry = mass of dry soil.

Output: Water content w (%), dimensionless.
Minimum frequency: Every disturbed and undisturbed sample. Water content is the most fundamental test in the program — never omit it.

| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| w | water content = ( M_water / M_dry ) × 100% | Lab test | Oven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938). | gravels/sands 3–25%, clays 15–70% · by USCS group |
| Mdry | mass of dry soil. | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
Liquid Limit (LL): Casagrande cup method; flow curve plotted; LL at N = 25 blows.
Plastic Limit (PL): ⅛-in. thread rolling on glass plate.
Plasticity Index: PI = LL − PL
Liquidity Index: LI = (w − PL) / PI
Activity: A = PI / (% < 0.002 mm)
Output: LL, PL, PI (all %); LI and A dimensionless.
Minimum frequency: 1 per fine-grained stratum per boring; 1 per 5 ft depth in highly variable fine-grained profiles.
Sieve analysis (ASTM D6913): Applicable for material with particles retained on the No. 200 sieve. Sieves: 3 in., 2 in., 1½ in., 1 in., ¾ in., ½ in., No. 4, No. 10, No. 20, No. 40, No. 60, No. 100, No. 200.

Hydrometer analysis (ASTM D7928): For material passing No. 200 (clay and silt sizes). Combined with sieve for full gradation curve (ASTM D6913 + D7928).
Key outputs:
Minimum frequency: 1 per stratum per boring for classification; additional tests for filter design and liquefaction susceptibility assessment.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Cu | D₆₀ / D₁₀ (uniformity coefficient, dimensionless) | Lab test | Grain-size curve: sieve (ASTM D6913) plus hydrometer for fines (ASTM D7928). Read D10, D30, D50, D60, D85 from the curve. | by USCS group |
| Cc | D₃₀² / (D₆₀ × D₁₀) (coefficient of curvature, dimensionless) | Lab test | Grain-size curve: sieve (ASTM D6913) plus hydrometer for fines (ASTM D7928). Read D10, D30, D50, D60, D85 from the curve. | by USCS group |
Method: Pycnometer (volumetric flask) method; soil displaced volume in de-aired water.
Equation:
G_s = M_sd / (M_sd + M_pw − M_spw) (dimensionless)
where M_sd = mass of dry soil; M_pw = mass of pycnometer + water; M_spw = mass of pycnometer + soil + water.
Typical values: G_s = 2.60–2.75 (mineral soils); 2.60–2.65 (clean quartz sand); 2.70–2.80 (iron-rich soils).
Minimum frequency: 1 per soil type in each project; required for void ratio and consolidation calculations.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Gs | specific gravity of solids = M_sd / ( M_sd + M_pw − M_spw ) (dimensionless) | Lab test | Specific gravity of solids (ASTM D854). 2.65–2.70 is usually adequate for mineral soils when untested. | 2.64–2.80 mineral; lower if organic · by USCS group |
| Mpw | mass of pycnometer + water | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| Mspw | mass of pycnometer + soil + water. | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
Standard Proctor (ASTM D698):
Modified Proctor (ASTM D1557):
Output: Compaction curve (γ_d pcf vs. w %); γ_d,max (pcf); w_opt (%)
Zero-Air-Voids (ZAV) line: γ_d,ZAV = G_s × γ_w / (1 + G_s × w/100) (pcf)
Minimum frequency: 1 Modified Proctor per borrow source or fill material type (not per sample); repeat if source changes during construction.
Method: Laboratory CBR at Modified Proctor density (95% RC minimum). Specimen soaked 96 hours at Standard loading conditions.
Penetration resistance equation:
CBR = (P_sample / P_standard) × 100%
where:
Use the higher CBR from 0.1 or 0.2 in. penetration (recheck if 0.2 in. governs).
Output: CBR (%); used directly for pavement design (Chapter 7.3, Section 7.3.1).
Minimum frequency: 1 per subgrade soil type per project; 3+ tests for intermodal yard pavement design.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| CBR | California Bearing Ratio = ( P_sample / P_standard ) × 100% | Lab or field test | Lab CBR (ASTM D1883, soaked) on compacted samples; field CBR (D4429); or from DCP (ASTM D6951) correlation. | CL/CH ≤ 15; sands 10–40; gravels 20–80 · by USCS group |
| Psample | measured force at 0.1 in | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| Pstandard | standard force at same penetration | Constant | Physical constant or standard value. | project-specific |
Method: Cyclic triaxial test with conditioning sequence (500 cycles at 4 psi deviator) followed by 15 stress states per AASHTO T 307 protocol.
M_r from regression (NCHRP 1-28A model):
M_r = k₁ × P_a × (θ/P_a)^k₂ × (τ_oct/P_a + 1)^k₃ (psi)
where:
Minimum frequency: 1 test per subgrade soil type where the pavement or subgrade design uses M_r; confirm whether the owner requires it.
Repeated-load triaxial (or simple shear) tests give two results that matter for track:
Tiny plastic strains per cycle add up to large settlement over millions of cycles, so report both.
What to look for.
Test conditions. Test at the field moisture and density, including a wet-of-optimum case (Chapter 7.3). Fine-grained modulus falls steeply on the wet side.
After Selig & Waters (1994), chs. 3, 7 and 10. Full reference under Supplemental References.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Mr | resilient modulus = k₁ × P_a × (θ/ P_a )^k₂ × ( τ_oct / P_a + 1)^k₃ (psi) | Lab test (or correlation) | Repeated-load triaxial (AASHTO T 307), or Mr ≈ 2,555·CBR0.64 (MEPDG). | fine-grained 3,000–14,000 psi · by USCS group |
| Pa | atmospheric pressure = 2,117 psf = 14.7 psi | Constant | Physical constant or standard value. | project-specific |
| θ | bulk stress = σ₁ + σ₂ + σ₃ (psi) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| τoct | octahedral shear stress (psi) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |

Method A: Incremental load; load doubling each 24-hour interval; loads: 125–250–500–1,000–2,000–4,000–8,000 psf (standard); extend to 16,000 psf for deep or heavily preloaded sites.
Method B: Constant rate of strain (CRS); continuous loading at a controlled strain rate.
Key outputs (English units):
| Parameter | Symbol | Units | Equation |
|---|---|---|---|
| Compression index | C_c | dimensionless | Slope of e-log σ'_v curve (NC range) |
| Recompression index | C_r | dimensionless | Slope of e-log σ'_v curve (OC range); ≈ C_c/5 to C_c/10 |
| Preconsolidation pressure | σ'_p | tsf | Casagrande graphical construction |
| OCR | — | dimensionless | σ'_p / σ'_v0 |
| Coefficient of consolidation | c_v | ft²/day | c_v = T_v × H_dr² / t (see Chapter 6.2) |
| Secondary compression index | C_α | dimensionless | Δe / Δ log t (secondary range) |
Minimum frequency: 1 per fine-grained stratum per project; minimum 3 tests in any stratum requiring settlement analysis.
Method: Undrained shear test on undisturbed sample; three specimens at different confining pressures (typically 500, 1,000, 2,000 psf); no drainage allowed during shear.
Output: s_u (psf or tsf) from Mohr circle at failure; φ_u ≈ 0° for saturated clay.
Note: For saturated clay, UU test gives s_u directly regardless of confining pressure — the Mohr circle diameter is constant. UU is appropriate for short-term (undrained) stability analysis only.
Minimum frequency: 1 per soft or medium clay stratum per boring at critical cross-sections (slope stability, embankment loading over soft clay).


After Selig & Waters (1994), ch. 3. Full reference under Supplemental References.
Method: Specimens consolidated to two or three effective confining pressures (σ'₃); sheared undrained with pore pressure measurement; effective stress Mohr circles give c' and φ'.
Output: c' (psf), φ' (degrees) — effective strength parameters for long-term (drained) analysis.
Minimum frequency: Required for all critical slope stability analyses (Class I railroad clay shale, Class I railroad clay located in the prairies, Class I railroad sensitive marine clay); 1 set (3 specimens) per stratum per project minimum.
Method: Specimen sheared at constant normal stress; three tests at different normal stresses.
Peak and residual strength:
τ_peak = c' + σ_n × tan φ'_peak (psf)
τ_residual = σ_n × tan φ'_r (psf, c' = 0 for residual)
Output: c' (psf), φ' (degrees), φ'_r (degrees).
Use cases: Residual strength for Class I railroad clay shale and Class I railroad weathered shale slope stability; rock joint shear strength for cut slope design.
Minimum frequency: 1 per stratum requiring residual strength parameters; rock joints: minimum 3 direct shear tests per joint set per project.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| c' | effective cohesion | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |

Method: Axial loading to failure at unconfined conditions (σ₃ = 0). Quick and inexpensive.
Output: q_u (psf or tsf); s_u = q_u / 2.
Limitation: UU triaxial provides more reliable s_u; unconfined compression can underestimate s_u in fissured or brittle clays. Use for screening; not for final design in critical applications.
Minimum frequency: Appropriate for routine s_u checks on Shelby tube samples; supplement with UU triaxial for design-level analysis.
Constant head (ASTM D2434): For coarse-grained soils (k above about 3 ft/day, 10⁻³ cm/s).
k = (Q × L) / (A × h × t) (ft/day)
where Q = flow volume (ft³); L = specimen length (ft); A = cross-sectional area (ft²); h = head differential (ft); t = test duration (day).
Flexible wall permeameter (ASTM D5084): For fine-grained soils (k below about 3 ft/day, 10⁻³ cm/s).
k = (a × L × ln(h₁/h₂)) / (A × t) (ft/day)
where a = standpipe area (ft²); L = specimen length (ft); h₁, h₂ = head at start and end; t = elapsed time (day).
Minimum frequency: 1 per stratum for drainage design; 3 per stratum for seepage analysis through embankments or dams.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| k | (Q × L) / (A × h × t) (ft/day) | Field or lab test | Field: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only. | clean sand 1–100, clay < 0.001 ft/day · by USCS group |
| L | specimen length (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| A | cross-sectional area (ft²) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| h | head differential (ft) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| t | test duration (day). | Time | Elapsed test time (recorded) or the analysis time chosen for design. | project-specific |
Method: Rock core or irregular lump loaded to failure between conical platens.
Point load strength index:
I_s = P / D_e² (psi or psf)
where P = failure load (lb); D_e = equivalent core diameter (in.).
Size-corrected index:
I_s(50) = F × I_s where F = (D_e/1.97 in.)^0.45
Estimated UCS of rock:
q_u(rock) ≈ 24 × I_s(50) (psi) [Broch & Franklin 1972; I_s in psi]
Minimum frequency: at least 10 valid tests per rock unit (ASTM D5731, withdrawn 2025); not a substitute for UCS testing for critical rock foundation designs.

| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Is | P / D_e² (psi or psf) | Lab test | Uniaxial compression of rock core (ASTM D7012); point load index (D5731) for screening. | shale 1,000–15,000; sandstone 5,000–25,000; granite 15,000–40,000 psi |
| De | equivalent core diameter (in.). | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| Is(50) | F × I_s where F = ( D_e /1.97 in.)^0.45 | Lab test | Uniaxial compression of rock core (ASTM D7012); point load index (D5731) for screening. | shale 1,000–15,000; sandstone 5,000–25,000; granite 15,000–40,000 psi |
USACE manuals (EM 1110-2-1902 slope stability, EM 1110-2-2504 sheet piles, and others cited in this manual) use letter names for the basic triaxial tests: Q = unconsolidated-undrained (UU); R = consolidated-undrained (CU); S = consolidated-drained (CD), which is also the long-term drained case. The Q test applies only to soils that are not free-draining, and R-test specimens should generally be fully saturated before shear. Errors EM 1110-2-1906 lists for R tests: back-pressure increments too large or applied too fast; chamber and back pressure not held precisely (which can overconsolidate the specimen); shearing before consolidation is complete; too fast a strain rate; temperature drift; and water absorbed from the porous inserts after the test, which biases the final water content. For S tests the main errors are strain rate and volume-change measurement. In pervious soils, water redistributes even in a quick Q test, so measure the water content of the middle third separately from the ends.

Section 5.2.3.8 gives cv = TvHdr2/t but not how t is found. The two standard curve-fitting methods (Das lab manual) are:
With double drainage, Hdr is half the average specimen height during the increment. Report which method was used. The two methods commonly give different cv values for the same increment, and the report should say which one the settlement-time analysis in Chapter 6.2 used.
Source: U.S. Army Corps of Engineers (1970, with changes). Laboratory Soils Testing. EM 1110-2-1906 · Das, B. M. (2002). Soil Mechanics Laboratory Manual, 6th ed. Oxford University Press

Railroad cuts in Appalachian and prairie shales (Chapter 6.3) need durability as well as strength data, and Atterberg limits of clay shale depend on how the sample was processed. EM 1110-2-1906 therefore standardizes three preparations: blenderized (the primary reference — dried below 122°F at < 30% RH, soaked at least 48 hr, then blended as a slurry above 300% water content or twice the LL); undried (shaved directly into distilled water); and air-dried (one drying–soaking cycle). The spread among the three indicates the strength of interparticle bonds. Report which method produced the limits used for design.

Slake durability (Franklin and Chandra, 1972; ASTM D4644, withdrawn 2025): oven-dried rock lumps are rotated for 10 minutes in a sieve-mesh drum half immersed in 68°F water. Id is the percentage of the initial dry mass retained. Nagaraj reports reproducibility within 5% at 95% confidence, and the test discriminates well between mudstones that otherwise look alike.
| Id (%) | 0–25 | 25–50 | 50–75 | 75–90 | 90–95 | 95–100 |
|---|---|---|---|---|---|---|
| Durability | Very low | Low | Medium | High | Very high | Extremely high |
After Franklin and Chandra (1972). As printed in Nagaraj’s Table 9.7, the 75–90 and 90–95 labels are transposed; the order shown here is the original.
For clay shales, Nagaraj also reproduces the Morgenstern and Eigenbrod (1974) classification, which combines the amount of slaking (by the liquid limit of the slaked material: < 20 very low to > 140 very high) with the rate (change in liquidity index in the first cycle: < 0.75 slow, 0.75–1.25 fast, > 1.25 very fast). Add slake durability to the rock column of Table 5.2-1 for every cut in shale, mudstone or claystone and for any rock proposed as riprap or fill.
Source: U.S. Army Corps of Engineers (1970, with changes). Laboratory Soils Testing. EM 1110-2-1906 · Nagaraj, T. S. (1993). Principles of Testing Soils, Rocks and Concrete. Elsevier (Developments in Geotechnical Engineering)

| Test | Equipment and procedure | Result |
|---|---|---|
| Deval (1896) | 11-lb sample in cylinders 8 in. dia. × 13 in., inclined 30°; 10,000 revolutions at 2,000 rev/h (about 5 h); dry or wet | Deval coefficient from % attrition. Typical minimums: > 12 (limestone), > 14 (hard rock), some railways > 16 |
| Los Angeles (1926) | Drum 28 in. dia. × 20 in.; 11-lb sample with 12 steel balls of 15 oz each; 500 revolutions at 30–33 rpm (about 15 min). EN version: 22-lb sample, 1,000 revolutions | % passing No. 12 (French) or No. 8 (British) sieve. Many specifications: LA < 25. EN reference test |
| Micro-Deval | 1.1 lb of ⅜–½ in. gravel with 11 lb of small steel balls (about ⅜ in.) and 2.6 qt of water in an 8-in. cylinder; 12,000 revolutions at 100 rpm. EN version: 22 lb, 14,000 revolutions | MDE = % finer than No. 12. Used mainly for subballast; subballast MDE < 15–20 |

North American ballast specifications (AREMA Chapter 1) use the ASTM Los Angeles test for large coarse aggregate (ASTM C535). Results from the European methods are not interchangeable with ASTM results without correlation.
Cyclic behavior. Ballast takes a large permanent set on first loading as stones rearrange, then accumulates strain slowly: εN = ε1(1 + c·log N), with c ≈ 0.2 (European ORE and British Rail research) or 0.25–0.40 (American research). On that basis it takes 100,000–300,000 cycles to double the first-cycle plastic strain. Ballast modulus roughly doubles over the first 1,000 cycles and then stays nearly constant; gravel subballast modulus does not change with cycles. Repeated-load triaxial programs should run long enough to get past this initial bedding-in.

After Profillidis (2014), §12.3–12.4, Eq. 12.1, Figs. 12.3–12.4. Full reference under Supplemental References.
| Test | Standard | What it gives |
|---|---|---|
| Atterberg limits | ASTM D4318 | Liquid limit, plastic limit, plasticity index; classifies fines |
| Particle-size distribution | ASTM D6913 (sieve), D7928 (hydrometer) | Sieve gradation, % finer than No. 200, hydrometer split of silt and clay |
| Moisture content | ASTM D2216 (oven); D4643 (microwave, for quick checks) | Water content by drying |
| Unconfined compressive strength | ASTM D2166 | Direct strength of cohesive samples |
| Proctor compaction | ASTM D698 / D1557 | Target density and optimum moisture for fill and subgrade |





Compaction can roughly double a soil’s strength. The fines content of granular fill controls its drainage, frost susceptibility and strength after rain, so specify and test fines on ballast and sub-ballast deliveries rather than accepting material that only looks good dry.
After Geotechnology for Railroaders Program, Module 2; §09–10. Full reference under Supplemental References.
Case study: 5.2.16.1 Curing time changes compaction and CBR results (Look 2023), in Section 5.2.16 Case Studies.
Shelby tubes (ASTM D1587, withdrawn 2024 thin-wall samples) must be:

Sample Quality Designation (Lunne et al. 1997, for OCR 1–2) — also referenced in Chapter 4.1:
| Δe/e₀ | Quality |
|---|---|
| < 0.04 | Very good to excellent |
| 0.04–0.07 | Good to fair |
| 0.07–0.14 | Poor |
| > 0.14 | Very poor |
Report SQD for all consolidation and triaxial test specimens. Note samples with SQD = Poor or Very Poor in the report, with a caveat on the reliability of the strength and compressibility parameters derived from them.
A chain of custody (COC) form must accompany every sample shipment from field to laboratory. Required fields:
Owner railroads may require COC forms to be scanned and submitted with the laboratory report as a QC attachment.
A minimum of 10% of all tests (by test type) must be run in duplicate as a QC check. Duplicate tests are run on split halves of the same sample by the same method. Acceptable precision limits:
| Test | Acceptable Duplicate Difference | Action if Exceeded |
|---|---|---|
| Water content (D2216) | ≤ 1.0% | Repeat test on third portion |
| Atterberg limits (D4318) | LL ≤ 2%, PL ≤ 2% | Repeat; average of three if still outside |
| Modified Proctor (D1557) | γ_d,max ≤ 1.0 pcf; w_opt ≤ 1.0% | Rerun entire compaction curve |
| Consolidation C_c (D2435) | ≤ 0.05 | Flag and report; use higher value for design |
| UU triaxial s_u (D2850) | ≤ 10% of mean | Investigate specimen preparation |
| CBR (D1883) | ≤ 5 percentage points | Average of three specimens |
The laboratory must maintain certified reference standards for:
Each laboratory report must contain:
Specimen selection matters more than test count. EM 1110-2-1906 stresses that strength, compressibility and permeability can vary severalfold within a few inches. Specimen selection therefore needs personal inspection of the samples by the laboratory and the design engineer together, not selection from boring logs alone. Its guiding principle: “one good test is not only far better than many poor tests, but is also less expensive.” Undisturbed samples should not be stored for long periods, because physical and chemical changes eventually invalidate them.
Source: U.S. Army Corps of Engineers (1970, with changes through 1986). Calibration of Laboratory Soils Testing Equipment. EM 1110-2-1909 · U.S. Army Corps of Engineers (1970, with changes). Laboratory Soils Testing. EM 1110-2-1906
Case study: 5.2.16.2 Laboratory variation in Cooroy clay compaction curves (Look 2023), in Section 5.2.16 Case Studies.
| Test | Class I | Class I | Class I | Class I | Class I | Passenger | Class I | Short line |
|---|---|---|---|---|---|---|---|---|
| Water content, Atterberg, grain size | 5 business days | 5 business days | 5 business days | 5 business days | 5 business days | 5 business days | 5 business days | 5 business days |
| Modified Proctor | 7 business days | 7 business days | 7 business days | 7 business days | 7 business days | 7 business days | 7 business days | 7 business days |
| CBR (soaked) | 10 business days | 10 business days | 10 business days | 10 business days | 10 business days | 10 business days | 10 business days | 10 business days |
| UU Triaxial | 10 business days | 10 business days | 10 business days | 10 business days | 10 business days | 10 business days | 10 business days | 10 business days |
| CU Triaxial | 15 business days | 15 business days | 15 business days | 15 business days | 15 business days | 15 business days | 15 business days | 15 business days |
| Consolidation (D2435) | 14 business days | 14 business days | 14 business days | 14 business days | 14 business days | 14 business days | 14 business days | 14 business days |
| Resilient modulus (T307) | Not required | Not required | Not required | 15 business days | 15 business days | 15 business days | 15 business days | Not required |
Rush processing (1.5–2× standard fee): available from most accredited labs at 50–70% of standard turnaround times. Confirm availability at project initiation for emergency and fast-track projects.
Sample Retention Policy vary by owner railroad. Confirm them against the owner railroad's current standards when the work is scoped, and record the edition used.
Owner railroads reserve the right to request sample re-testing or third-party verification testing within the retention period.
Laboratory Accreditation Requirements vary by owner railroad. Confirm them against the owner railroad's current standards when the work is scoped, and record the edition used.
Key accreditation bodies:
An oedometer test on a tube sample from 18 to 20 ft under a bridge approach embankment on a Class I railroad located in Georgia. Three numbers come out of the e-log σ′ curve: the preconsolidation stress, the compression index above it and the recompression index below it. Together with the present effective stress they say which settlement equation of Chapter 6.2 applies.
| Variable | Value | Description |
|---|---|---|
| Data | σ′ = 0.125, 0.25, 0.5, 1, 2, 4, 8, 16 tsf; e = 1.820, 1.795, 1.762, 1.698, 1.590, 1.430, 1.235, 1.015 | End of each load stage |
| σ′p | 1.50 tsf | Casagrande construction (maximum curvature near 1.0 to 1.5 tsf) |
| γsat | 115 pcf | Water table at the surface |
| z | 19 ft | Sample depth |
Cc = 0.590, Cr = 0.135, σ′p = 1.50 tsf and OCR = 3.0: a moderately overconsolidated clay.
Use the overconsolidated settlement equations of Chapter 6.2: recompression only while the final stress stays below 1.50 tsf, and recompression plus virgin compression if the embankment pushes it past. Report all four values in the engineering properties table of the geotechnical report. Cc is taken from the straight part of the curve well above σ′p, not from the bend.
Subgrade for an intermodal yard expansion on a Class I railroad located in Kansas City. The Proctor test sets the compaction reference; the CBR is run on a specimen compacted to the specified fraction of it and soaked, which is the condition the subgrade will be in after a wet season.
| Variable | Value | Description |
|---|---|---|
| Proctor points | w = 10.5, 12, 14, 16, 18%; γd = 111.8, 115.4, 118.2, 117.1, 113.5 pcf | Modified Proctor |
| RC | 95% (assumed) | Specimen compaction |
| Loads | 730 lb at 0.1 in.; 960 lb at 0.2 in. | Soaked CBR |
| Standard loads | 3,000 lb at 0.1 in.; 4,500 lb at 0.2 in. | ASTM D1883 |
| Requirement | CBR ≥ 20% (assumed) | Subgrade or blanket |
γd,max = 118.2 pcf at 14.0%; design CBR = 24.3%, just above the assumed 20% requirement.
A soaked CBR of 24% is high for a lean clay, which commonly tests between 3 and 15%. Before the value is used, check the specimen’s classification, compaction and soak record, and run at least three more tests across the yard footprint. If the result is confirmed, the subgrade is marginally adequate; if not, plan for a blanket layer or treatment (Chapter 7.3).
A cut slope in residual silty clay on a Class I railroad located in Appalachia. Three CU specimens with pore pressure measurement give the effective strength parameters for long-term (drained) slope stability. The p′-q′ plot turns three Mohr circles into a straight line, whose slope and intercept give φ′ and c′.
| Variable | Value | Description |
|---|---|---|
| σ3 | 1,000; 2,000; 3,000 psf | Cell pressures, specimens A to C |
| Δuf | 400; 710; 1,050 psf | Pore pressure at failure |
| q | 820; 1,540; 2,290 psf | (σ1 − σ3)/2 at failure |
φ′ ≈ 31° and c′ ≈ 90 psf.
These are for long-term (drained) stability. Small cohesion intercepts from three points are uncertain; for a cut slope with a factor of safety near 1.3, test at least two more specimens and consider checking the slope with c′ = 0, because weathering of a residual soil in the cut face destroys cohesion first.
| Boring | Sample | Depth (ft) | USCS | LL | PL | PI | w (%) | γ_d (pcf) | s_u (tsf) | φ' (°) | c' (psf) | C_c | C_r | σ'_p (tsf) | k (ft/day) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B-1 | SS-3 | 8–10 | CL | 42 | 20 | 22 | 24.1 | — | — | — | — | — | — | — | — |
| B-1 | ST-1 | 12–14 | CH | 65 | 28 | 37 | 38.5 | 78.2 | 0.24 | — | — | 0.52 | 0.11 | 1.20 | — |
| B-2 | SS-4 | 10–12 | CL | 35 | 22 | 13 | 18.2 | — | — | — | — | — | — | — | — |
| B-3 | ST-1 | 18–20 | CH | 71 | 29 | 42 | 42.1 | 76.5 | 0.19 | — | — | 0.59 | 0.14 | 1.50 | 2.1×10⁻⁵ |
| B-3 | SS-6 | 25–27 | SC | — | — | 4 | 9.8 | — | — | 32° | 0 | — | — | — | — |
| B-4 | ST-2 | 15–17 | CL | 48 | 22 | 26 | 29.4 | 80.1 | 0.31 | — | — | 0.44 | 0.09 | 1.35 | — |
| B-5 | SS-3 | 8–10 | CL | 44 | 21 | 23 | 22.8 | — | — | — | — | — | — | — | — |
| B-6 | ST-1 | 12–14 | CH | 68 | 27 | 41 | 40.2 | 77.4 | 0.22 | 31° | 200 | 0.57 | 0.12 | 1.45 | — |


Checklist · Part V · Subsurface Exploration
Pre-Field
Field
Laboratory Phase
Report Integration
| Topic | See Also |
|---|---|
| SPT N-value correction using γ_d and G_s | Chapter 4.1 |
| In situ test correlation to lab parameters | Chapter 5.1 |
| USCS classification using Atterberg limits and grain size | Chapter 2.2 |
| Groundwater (effect on consolidation parameters) | Chapter 2.8 |
| Bearing capacity using c', φ' from triaxial | Chapter 6.1 |
| Settlement using C_c, C_r, σ'_p from consolidation | Chapter 6.2 |
| Slope stability using φ' and c' from CU triaxial | Chapter 6.3 |
| Liquefaction using fines content and FC correction | Chapter 6.5 |
| CBR and M_r for pavement design | Chapter 7.3 |
| Ground improvement parameter selection | Chapter 7.2 |
| Retaining wall backfill φ' from direct shear | Chapter 7.1 |
| Subgrade s_u from UU triaxial for subgrade FS | Chapter 2.3 |
| Reference Proctor for compaction acceptance | Chapter 5.3 |
| Lab data table format in final report | Chapter 8.4 |
| Lab test data table template (blank) | Appendix B |
A consolidation test was run on a tube sample from beneath a planned railroad embankment. The test gave the void ratios in the virgin range and the stresses shown. The engineer must compute the compression index and the overconsolidation ratio and decide which settlement equation applies to the embankment load.
| Variable | Value | Description |
|---|---|---|
| Points | e = 1.42 at 1.0 tsf; e = 1.18 at 4.0 tsf | Virgin range |
| σ′v0 | 0.80 tsf | |
| σ′p | 1.60 tsf | Casagrande |
(a) Cc = 0.40. (b) OCR = 2.0. (c) The overconsolidated equations; which one depends on whether the final stress passes 1.60 tsf.
The new load decides the case, so compute σ′vf = σ′v0 + Δσ before choosing.
A nuclear gauge test on a lift of fill for a new railroad yard gave the field density and moisture shown. The railroad’s specification requires 95% of Modified Proctor and moisture within 3% of optimum. The inspector must decide whether the lift passes on density and on moisture.
| Variable | Value | Description |
|---|---|---|
| γd,field | 117.4 pcf | |
| γd,max | 120.5 pcf | Modified Proctor |
| w, wopt | 17.2%; 14.0% | |
| Spec | RC ≥ 95%; w within ±3% of optimum | Railroad requirement |
(a) 97.4%. (b) Passes. (c) Fails: 0.2% above the wet limit.
Rework or dry the lift and retest before placing the next one. A wet-side lift that passes density can still rut and pump under construction traffic, which is why both criteria must be met.
Two consolidation tests on the same clay stratum beneath a planned railroad bridge approach fill gave different compression indices, and the sample quality measurements differ as shown. The engineer must decide which compression index to use for the approach settlement and why.
Two tests on the same stratum disagree; sample quality decides which to trust.
| Variable | Value | Description |
|---|---|---|
| Sample A | Cc = 0.45; Δe/e0 = 0.06, good to fair | Lunne et al. (1997) SQD |
| Sample B | Cc = 0.31; Δe/e0 = 0.12, poor |
No equation is needed; the answer follows from the criteria listed under Given.
Use Cc = 0.45 from Sample A.
Disturbance always errs toward less compressible behavior beyond σ′p, so the lower value is the suspect one. Document the rejection with the SQD criteria in the report.
Three consolidated-undrained triaxial tests were run on clay from the foundation of a railroad embankment that is to be widened. The confining pressures, deviator stresses and pore pressures at failure are shown. The engineer must find the effective stresses at failure and the effective friction angle for the widening’s drained stability analysis.
The same method as Example 5.2-3.
| Variable | Value | Description |
|---|---|---|
| σ3 | 1,000; 2,000; 3,000 psf | |
| (σ1 − σ3)f | 1,840; 3,280; 4,920 psf | |
| uf | 450; 820; 1,200 psf |
(a) 550, 1,180 and 1,800 psf. (b) 2,390, 4,460 and 6,720 psf. (c) φ′ ≈ 33.5°.
The middle point lies close to the line through the outer two (predicted q = 920 + 0.552 × 1,350 = 1,665 psf against 1,640), so the three specimens are consistent.
A soaked CBR test was run on the proposed subballast borrow for a Class I railroad siding. The test gave the loads shown at 0.1 and 0.2 in. of penetration, with a seating load. The engineer must correct the loads, compute the CBR and report the design value.
| Variable | Value | Description |
|---|---|---|
| Loads | 880 lb at 0.1 in.; 1,260 lb at 0.2 in. | |
| Seating | 15 lb at zero penetration | |
| Standard loads | 3,000 and 4,500 lb |
(a) 865 and 1,245 lb. (b) 28.8% and 27.7%. (c) Design CBR = 28.8%.
If the 0.2-in. value had been higher, ASTM D1883 calls for a repeat test; a higher value at 0.2 in. usually means a seating error at low penetration.
A soldier pile and lagging wall will support a cut beside a yard track for a Class I railroad located in Indiana. The piles pass through clean fill above the water table and old cinder fill below it. Corrosivity tests on one sample from each zone have come back from the laboratory. The engineer must decide whether either zone is aggressive to the steel piles, which results govern, and what to ask the laboratory about its procedure before finalizing the design (Section 5.2.30).
| Variable | Value | Description |
|---|---|---|
| B-1, upper fill | pH 6.8; 4,200 ohm-cm; Cl 45 ppm; SO4 150 ppm; organics 0.6% | Above the water table |
| B-2, cinder fill | pH 4.6; 1,800 ohm-cm; Cl 160 ppm; SO4 820 ppm; organics 3.5%; Eh −120 mV | Below the water table; sulfate sample oven-dried at 200°F |
(a) B-1 is not aggressive; B-2 is aggressive on all five criteria. (b) pH, resistivity and the reducing (low Eh) conditions govern; sulfate and chloride confirm it. (c) Question the oven-drying of the sulfate sample and confirm the methods, but the conclusion stands.
Design the steel for the cinder zone, not the average: options include a sacrificial thickness or heavier section based on an aggressive-ground loss rate, coatings over the length in the cinder fill, concrete encasement of the embedded pile, or a different wall type. Treat lagging and connections the same way. Take more samples along the wall alignment, because old cinder fills vary, and keep a sealed, unopened sample from below the water table for redox and sulfide testing. Disposal of excavated cinder fill may also need environmental testing (Chapter 5.4).
Field case studies by Burt G. Look, from Earthworks: Theory to Practice – Design and Construction (CRC Press/Balkema, 2023), chosen for this chapter’s topics. Each is summarized from the book with its key figures and a closing note on railroad application added by the authors of this manual. Credit for the case material belongs to Look; see item S8 under Supplemental References.
Related section: 5.2.3 Test Methods — ASTM Standards and English Unit Outputs
Samples of Bundamba clay (plasticity index 47%, 97% passing No. 40, 69%–82% fines) were cured for 0, 1, 4 and 7 days before compaction and soaked and unsoaked CBR testing:
For railroad work: plastic clay subgrade samples for CBR, resilient modulus or Proctor testing should be cured to the period the test standard requires, and the curing time should be reported. A test turned around too quickly can push the design either way.


Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §5.8, pp. 142. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.
Related section: 5.2.5 Laboratory QA/QC
Eleven standard compaction tests on clay from one project site at Cooroy, Queensland (55 compaction points) gave maximum dry densities from 97–104 pcf, median about 101 pcf, and optimum moisture contents from 18.6% to 24.5%, median 21.5%. The idea of a unique MDD and OMC does not hold for clays. The repeatability allowed in the Australian standard suggests 85%–115% of OMC as a realistic moisture window, yet many specifications ask for ±2% of OMC, which testing variation alone makes unachievable.
The real target is low air voids: much below 85% of OMC, air voids exceed about 10%. Look also warns that the compacted soil will not stay at its placement moisture, so the moisture target should guide field effort and not be a pass/fail criterion. Density is the pass/fail measure. Compaction well above MDD or dry of OMC raises suction, so the “stronger” material is more sensitive to later moisture change.
For railroad work: the ±2% moisture band suits processed granular materials such as subballast, not high-moisture clays in embankment or subgrade. Use a band that reflects the laboratory’s own repeatability.

Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §7.9, pp. 230–232. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.
The library's notes on the Mohr-Coulomb model and on drained and undrained strength cover how a set of triaxial or direct shear specimens becomes a design envelope. The common error in railroad reports is to fit c and φ to too few specimens, or to report a peak effective cohesion for a clay slope that will, over decades, soften toward zero cohesion. The calculator fits the envelope by least squares and states the fit quality so the scatter is visible.
Equation 5.2-1. Triaxial results in p-q space
Equation 5.2-2. Direct shear
| Condition | Test and strength | Railroad example |
|---|---|---|
| End of construction or rapid loading of saturated clay | UU or CU total stress: su (φ = 0) | New fill placed quickly on soft clay |
| Long term, drained | CU with pore pressure or CD: c', φ' | Cut slopes and old embankments |
| Clay slopes that have softened | Fully softened (c' ≈ 0) | Over-steepened fill slopes in fat clay |
| Pre-existing slide surface | Residual (ring or reversal shear) | Reactivated slides at a track realignment |
Three consolidated-undrained specimens with pore pressure measurement (effective σ3 of 10, 20 and 40 psi) give φ' = 29.3 deg and c' = 2.78 psi with r² = 1.000. For a long-term slope check the 2.8-psi cohesion (about 400 psf) should be justified or dropped toward the fully softened value. On a 5-ft-deep slide in a dry 2H:1V slope with this friction angle, the Chapter 6.3 calculator gives a factor of safety of 1.12 with c' = 0 and 2.79 with c' = 400 psf, so the cohesion, not the friction angle, decides the answer.
Open the shear strength calculator →
Mohr-Coulomb c and φ from triaxial (σ3, σ1) or direct shear (σn, τ) results, with Mohr circles, fit quality and strength at a design normal stress.
These documents are in the reference library. The method summaries above are paraphrased; equations are standard forms.
Ballast is bought to a specification, and acceptance rests on two sets of laboratory results: the gradation, compared with the recommended band for the specified size number, and the physical tests, compared with limiting values that depend on the rock type. AREMA Chapter 1, Part 2, publishes both tables. The tests screen out rock that breaks down, absorbs water, carries clay or fines into the track, or packs poorly. Conference papers in the library show how petrography and field imaging extend these tests where a quarry's rock is marginal.
| Size No. | 3 in. | 2 1/2 | 2 | 1 1/2 | 1 | 3/4 | 1/2 | 3/8 | No. 4 | No. 8 |
|---|---|---|---|---|---|---|---|---|---|---|
| 24 | 100 | 90–100 | 25–60 | 0–10 | 0–5 | |||||
| 25 | 100 | 80–100 | 60–85 | 50–70 | 25–50 | 5–20 | 0–10 | 0–3 | ||
| 3 | 100 | 95–100 | 35–70 | 0–15 | 0–5 | |||||
| 4A | 100 | 90–100 | 60–90 | 10–35 | 0–10 | 0–3 | ||||
| 4 | 100 | 90–100 | 20–55 | 0–15 | 0–5 | |||||
| 5 | 100 | 90–100 | 40–75 | 15–35 | 0–15 | 0–5 | ||||
| 57 | 100 | 95–100 | 25–60 | 0–10 | 0–5 |
Nos. 24, 25, 3, 4A and 4 are main line ballast; Nos. 5 and 57 are yard ballast.
| Property (ASTM) | Granite, traprock | Quartzite | Limestone | Dolomitic limestone |
|---|---|---|---|---|
| Passing No. 200, max (C 117) | 1.0% | 1.0% | 1.0% | 1.0% |
| Bulk specific gravity, min (C 127) | 2.60 | 2.60 | 2.60 | 2.65 |
| Absorption, max (C 127) | 1.0% | 1.0% | 2.0% | 2.0% |
| Clay lumps and friable particles, max (C 142) | 0.5% | 0.5% | 0.5% | 0.5% |
| LA abrasion, max (C 535 or C 131) | 35% | 30% | 30% | 30% |
| Sodium sulfate soundness, 5 cycles, max (C 88) | 5.0% | 5.0% | 5.0% | 5.0% |
| Flat or elongated, max (D 4791 Method A) | 5.0% | 5.0% | 5.0% | 5.0% |
Use ASTM C535 for gradations with particles retained on the 1 in. sieve and C 131 for gradations passing 1 in. For concrete tie track AREMA excludes carbonate rock and gradation No. 57.
| Sample | Gradation | Tests | Result |
|---|---|---|---|
| Granite: 96% passing 2 in., 72% at 1 1/2, 22% at 1, 6% at 3/4, 2% at 3/8; LA 24% | conforms | all within limits | acceptable |
| Limestone, finer: 40% passing 1 in., 12% at 3/4, 3% at 3/8; LA 32% | does not conform (1 in. and 3/4 in. sieves high) | LA abrasion over 30% | not acceptable |
The second shipment fails on both counts: it is too fine for No. 4A and the limestone is softer than the 30% LA limit allows. Fine, soft ballast breaks down faster and fouls sooner (Chapter 6.4), so rejection at the quarry costs far less than early undercutting.
Open the ballast acceptance calculator →
Sieve analysis against the AREMA band for the size number, plus the limiting test values for the rock type and the concrete-tie exclusions.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated limits are standard or published values. Individual railroads are not named.
Consolidated-undrained (CU) triaxial tests with pore pressure measurement are the workhorse strength test for clay foundations under embankments. One set of tests gives both the undrained strength for short-term stability and the effective stress parameters for long-term stability. Das's Principles of Geotechnical Engineering shows how to reduce the results. Each failure point is plotted as p = (σ1 + σ3)/2 against q = (σ1 − σ3)/2. A straight line through the points (the Kf line, q = m + p tan α) converts to the Mohr–Coulomb parameters through sin φ = tan α and c = m/cos φ. Skempton's pore pressure coefficient at failure, Af, shows whether the clay tends to contract or dilate when sheared. Budhu and Craig give the critical state view of the same tests. Das also gives Skempton's correlation between the field vane strength ratio and plasticity index, with an overconsolidation adjustment, as a check on the laboratory values.
Equation 5.2-3. Kf line, Skempton's A and field vane estimate
Af = (Δud)f / (Δσd)f
(cu(VST)/σ′0)NC = 0.11 + 0.0037PI; (cu(VST)/σ′0)OC = (cu(VST)/σ′0)NC(OCR)0.8
| Quantity | Das | Calculator |
|---|---|---|
| φcu, one specimen: σ3 = 12 psi, (Δσd)f = 9.1 psi, (Δud)f = 6.8 psi | 16° | 16.0° |
| φ′, same specimen | 27.8° | 27.8° |
| Drained deviator stress at σ′3 = 12 psi | 21 psi | 21.0 psi |
| Field vane strength, PI = 28, OCR = 3.2, σ′0 = 160 kPa (3,342 psf) | 86.7 kPa (1,811 psf) | 1,810 psf |
Three CU tests on a clay at cell pressures of 10, 20 and 30 psi give a best-fit Kf line of φ′ = 36.1° with c′ = 0.69 psi, and a total stress angle φcu = 20.5°. These are illustrative results, not data from a real site. The mean Af is 0.49. Use φ′ and c′ for long-term embankment stability, and the undrained strength ratio for the end of construction and for staged construction (Chapter 2.5). A field vane strength well below the laboratory value usually points to sample disturbance, not to weak clay; check it with Chapter 4.1.
Open the CU triaxial calculator →
Total and effective stress Kf lines from CU tests with pore pressure, Mohr-Coulomb parameters, Skempton's Af, the implied drained strength, and a field vane strength estimate from PI and OCR, with a p-q plot.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.
The settlement-rate calculations in Chapters 6.2, 7.2 and 2.5 all start from cv, and cv comes from fitting the time readings of each oedometer load increment to Terzaghi's theory. Craig's Soil Mechanics (Section 7.8) describes both standard fits. Casagrande's log time method finds the start of primary consolidation from the parabolic early part of the curve, and the end where the steep and secondary parts meet, then reads t50. Taylor's root time method draws a line with abscissae 1.15 times those of the straight early part and reads t90 where it meets the curve. Craig notes that the root time method needs shorter readings but does not always show a straight line. The same increment also gives mv, and from mv and cv the permeability. He also warns that small laboratory specimens often understate field cv, because they miss the silt layers and fissures that drain a clay in the field.
Equation 5.2-4. Curve fitting and derived properties (Craig Eqs. 7.26 to 7.31)
r0 = (a0 − as)/(a0 − af); rp = 10(as − a90)/[9(a0 − af)]; rs = 1 − r0 − rp
mv = Δe/[(1 + e0)Δσ′]; k = cvmvγw
The calculator automates both constructions. For the root time plot it finds the longest straight run of early readings (R² above 0.997) and intersects the 1.15 line with the readings. For the log time plot it takes the corrected zero from the readings at t and 4t, and the end of primary consolidation where the steepest segment meets a line through the last three readings. Hand constructions differ from person to person, and so does this one, by a few percent.
| Quantity | Craig | Calculator |
|---|---|---|
| Example 7.4: t90 (root time) | 53.3 min | 54.5 min |
| Example 7.4: cv, root time / log time | 0.46 / 0.45 m²/yr | 0.45 / 0.49 m²/yr |
| Example 7.4: r0, rp | 0.080, 0.785 | 0.083, 0.784 |
| Example 7.4: mv | 0.70 m²/MN | 0.70 m²/MN |
| Problem 7.1: cv, root time / log time | 2.7 / 2.6 m²/yr | 2.77 / 2.58 m²/yr |
| Problem 7.1: mv | 0.98 m²/MN | 0.98 m²/MN |
| Problem 7.1: k | 8.1 × 10−10 m/s | 8.5 × 10−10 m/s |
The log time value for Example 7.4 is about 9% higher than Craig's because the calculator's tangent at the steepest segment falls slightly differently from his hand construction.
Craig's Example 7.4 increment, 214 to 429 kPa (4,469 to 8,960 psf), gives cv of 0.013 ft²/day by root time and 0.014 ft²/day by log time, with t90/t50 of 54.5 / 11.6 min. Secondary compression makes up about 13% of the compression in the increment. The permeability back-figured from cv and mv is 9.66 × 10−9 cm/s, typical of a clay. When this cv is used for a preload or wick drain design, compare it with field ch from CPTu dissipation tests (Chapter 5.1). The laboratory value is often the lower of the two.
Open the oedometer curve fitting calculator →
Root time (Taylor) and log time (Casagrande) curve fitting of an oedometer load increment, compression ratios, mv and permeability, in either mm or inch dial units.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.
Almost every laboratory and field result is reported through the weight-volume (phase) relationships of soil: a moisture content and a unit weight from a tube sample give the void ratio for a settlement calculation; a field density test gives the dry unit weight for a compaction check; an assumed porosity gives the saturated and buoyant weights for a slope or a retaining wall. The relationships are simple, but they are easy to mix up, and an inconsistent set (degree of saturation over 100%, for example) is a common sign of a wrong specific gravity or a bad density test.
Equation 5.2-5. Phase relationships
Vv = volume of voids (air plus water); Vs = volume of solids; S = degree of saturation; Gs = specific gravity of solids (ASTM D854); γw = 62.4 pcf; ic = critical hydraulic gradient for a quick condition under upward flow.
A specimen trimmed from a tube sample of embankment fill is weighed, oven-dried and weighed again. Its bulk specific gravity was measured by immersion. The numbers are those of the soil composition example in Hicks (2000).
| Variable | Value | Description |
|---|---|---|
| W | 122 g | Moist weight |
| Ws | 104 g | Oven-dry weight |
| Gm | 1.82 | Bulk specific gravity of the moist mass |
| Gs | 2.53 | Specific gravity of solids |
The sample has a void ratio of 0.631 at 17.3% water content and 69% saturation, and a dry unit weight of 96.8 pcf.
A Gs of 2.53 is low for mineral soil and suggests some organic matter or light particles (for example cinders in an old track fill). If Gs is assumed rather than measured, check it: with 2.70 the same weights give e = 0.74 and S = 63%, a material difference for settlement estimates.
Open the phase relationships calculator →
Void ratio, porosity, water content, saturation and unit weights from a lab specimen, from field unit weight and water content, or from void ratio, with the critical gradient and a seepage check.
The summaries above are paraphrased in original wording; equations and tabulated values are standard or published. Individual railroads, clients, companies and projects are not named.
Laboratory and field test results in this manual cite ASTM standard numbers. This table lists every active standard published in ASTM Volumes 04.08 and 04.09 (Soil and Rock) as of the 2010 subject index, grouped by purpose, so a test name in a proposal, a lab report or a specification can be matched to its designation. The 55 standards marked ★ are the ones used most often in railroad geotechnical work. Standards are revised on a five-year cycle and some have been replaced since 2010 (for example, D422 by D6913 and D7928, and D2938, D2664 and others by D7012), so confirm the current edition at astm.org before citing one in a scope or specification.
| Designation | Edition | Title | Vol. |
|---|---|---|---|
| Classification and index properties (33) | |||
| D422 ★ | 63(2007) | Test Method for Particle-Size Analysis of Soils | 04.08 |
| D425 | 88(2008) | Test Method for Centrifuge Moisture Equivalent of Soils | 04.08 |
| D854 ★ | 06ε1 | Test Methods for Specific Gravity of Soil Solids by Water Pycnometer | 04.08 |
| D1140 ★ | 00(2006) | Test Methods for Amount of Material in Soils Finer than No. 200 (75-µm) Sieve | 04.08 |
| D2487 ★ | 06ε1 | Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System) | 04.08 |
| D2488 ★ | 09a | Practice for Description and Identification of Soils (Visual-Manual Procedure) | 04.08 |
| D2974 ★ | 07a | Test Methods for Moisture, Ash, and Organic Matter of Peat and Other Organic Soils | 04.08 |
| D2976 ★ | 71(2004) | Test Method for pH of Peat Materials | 04.08 |
| D2977 | 03 | Test Method for Particle Size Range of Peat Materials for Horticultural Purposes | 04.08 |
| D2978 | 03 | Test Method for Volume of Processed Peat Materials | 04.08 |
| D2980 | 04 | Test Method for Volume Mass, Moisture-Holding Capacity, and Porocity of Saturated Peat Materials | 04.08 |
| D3282 | 09 | Practice for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes | 04.08 |
| D4221 | 99(2005) | Test Method for Dispersive Characteristics of Clay Soil by Double Hydrometer | 04.08 |
| D4318 ★ | 05 | Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils | 04.08 |
| D4544 | 86(2008) | Practice for Estimating Peat Deposit Thickness | 04.08 |
| D4643 | 08 | Test Method for Determination of Water (Moisture) Content of Soil by Microwave Oven Heating | 04.08 |
| D4647 | 06ε1 | Test Method for Identification and Classification of Dispersive Clay Soils by the Pinhole Test | 04.08 |
| D4943 | 08 | Test Method for Shrinkage Factors of Soils by the Wax Method | 04.08 |
| D4944 | 04 | Test Method for Field Determination of Water (Moisture) Content of Soil by the Calcium Carbide Gas Pressure Tester | 04.08 |
| D4959 | 07 | Test Method for Determination of Water (Moisture) Content of Soil By Direct Heating | 04.08 |
| D4972 ★ | 01(2007) | Test Method for pH of Soils | 04.08 |
| D5239 | 04 | Practice for Characterizing Fly Ash for Use in Soil Stabilization | 04.08 |
| D5519 ★ | 07 | Test Methods for Particle Size Analysis of Natural and Man-Made Riprap Materials | 04.08 |
| D5550 | 06 | Test Method for Specific Gravity of Soil Solids by Gas Pycnometer | 04.08 |
| D5715 | 00(2006) | Test Method for Estimating the Degree of Humification of Peat and Other Organic Soils (Visual/Manual Method) | 04.08 |
| D5720 | 95(2009) | Practice for Static Calibration of Electronic Transducer-Based Pressure Measurement Systems for Geotechnical Purposes | 04.08 |
| D5852 | 00(2007) | Test Method for Erodibility Determination of Soil in the Field or in the Laboratory by the Jet Index Method | 04.08 |
| D6026 | 06 | Practice for Using Significant Digits in Geotechnical Data | 04.09 |
| D6027 | 96(2004) | Practice for Calibrating Linear Displacement Transducers for Geotechnical Purposes | 04.09 |
| D6276 | 99a(2006)ε1 | Test Method for Using pH to Estimate the Soil-Lime Proportion Requirement for Soil Stabilization | 04.09 |
| D6565 | 00(2005) | Test Method for Determination of Water (Moisture) Content of Soil by the Time-Domain Reflectometry (TDR) Method | 04.09 |
| D6572 | 06 | Test Methods for Determining Dispersive Characteristics of Clayey Soils by the Crumb Test | 04.09 |
| D6913 ★ | 04(2009) | Test Methods for Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis | 04.09 |
| Compaction, density and field control (28) | |||
| D558 | 04 | Test Methods for Moisture-Density (Unit Weight) Relations of Soil-Cement Mixtures | 04.08 |
| D559 | 03 | Test Methods for Wetting and Drying Compacted Soil-Cement Mixtures | 04.08 |
| D560 | 03 | Test Methods for Freezing and Thawing Compacted Soil-Cement Mixtures | 04.08 |
| D698 ★ | 07ε1 | Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kN-m/m3)) | 04.08 |
| D1556 ★ | 07 | Test Method for Density and Unit Weight of Soil in Place by Sand-Cone Method | 04.08 |
| D1557 ★ | 09 | Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)) | 04.08 |
| D1883 | 07ε2 | Test Method for CBR (California Bearing Ratio) of Laboratory- Compacted Soils | 04.08 |
| D2167 | 08 | Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method | 04.08 |
| D2168 | 02a | Test Methods for Calibration of Laboratory Mechanical-Rammer Soil Compactors | 04.08 |
| D2844 ★ | 07 | Test Method for Resistance R-Value and Expansion Pressure of Compacted Soils | 04.08 |
| D2937 ★ | 04 | Test Method for Density of Soil in Place by the Drive-Cylinder Method | 04.08 |
| D4253 ★ | 00(2006) | Test Methods for Maximum Index Density and Unit Weight of Soils Using a Vibratory Table | 04.08 |
| D4254 ★ | 00(2006)ε1 | Test Methods for Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density | 04.08 |
| D4380 | 84(2006) | Test Method for Density of Bentonitic Slurries | 04.08 |
| D4531 | 86(2008) | Test Methods for Bulk Density of Peat and Peat Products | 04.08 |
| D4564 | 08 | Test Method for Density and Unit Weight of Soil in Place by the Sleeve Method | 04.08 |
| D4718 | 87(2007) | Practice for Correction of Unit Weight and Water Content for Soils Containing Oversize Particles | 04.08 |
| D5080 | 08 | Test Method for Rapid Determination of Percent Compaction | 04.08 |
| D5102 | 09 | Test Methods for Unconfined Compressive Strength of Compacted Soil-Lime Mixtures | 04.08 |
| D5856 | 95(2007) | Test Method for Measurement of Hydraulic Conductivity of Porous Material Using a Rigid-Wall, Compaction-Mold Permeameter | 04.08 |
| D6023 | 07 | Test Method for Density (Unit Weight), Yield, Cement Content, and Air Content (Gravimetric) of Controlled Low-Strength Material (CLSM) | 04.09 |
| D6035 | 08 | Test Method for Determining the Effect of Freeze-Thaw on Hydraulic Conductivity of Compacted or Intact Soil Specimens Using a Flexible Wall Permeameter | 04.09 |
| D6683 | 08 | Test Method for Measuring Bulk Density Values of Powders and Other Bulk Solids as Function of Compressive Stress | 04.09 |
| D6780 | 05 | Test Method for Water Content and Density of Soil in Place by Time Domain Reflectometry (TDR) | 04.09 |
| D6938 ★ | 08a | Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth) | 04.09 |
| D7013 | 04 | Guide for Nuclear Surface Moisture and Density Gauge Calibration Facility Setup | 04.09 |
| D7263 | 09 | Test Methods for Laboratory Determination of Density (Unit Weight) of Soil Specimens | 04.09 |
| D7382 | 08 | Test Methods for Determination of Maximum Dry Unit Weight and Water Content Range for Effective Compaction of Granular Soils Using a Vibrating Hammer | 04.09 |
| Strength and deformation (21) | |||
| D1633 | 00(2007) | Test Methods for Compressive Strength of Molded Soil-Cement Cylinders | 04.08 |
| D1634 | 00(2006) | Test Method for Compressive Strength of Soil-Cement Using Portions of Beams Broken in Flexure (Modified Cube Method) | 04.08 |
| D2166 ★ | 06 | Test Method for Unconfined Compressive Strength of Cohesive Soil | 04.08 |
| D2850 ★ | 03a(2007) | Test Method for Unconsolidated-Undrained Triaxial Compression Test on Cohesive Soils | 04.08 |
| D3080 ★ | 04 | Test Method for Direct Shear Test of Soils Under Consolidated Drained Conditions | 04.08 |
| D3999 | 91(2003) | Test Methods for the Determination of the Modulus and Damping Properties of Soils Using the Cyclic Triaxial Apparatus | 04.08 |
| D4015 | 07 | Test Methods for Modulus and Damping of Soils by Resonant- Column Method | 04.08 |
| D4219 | 08 | Test Method for Unconfined Compressive Strength Index of Chemical-Grouted Soils | 04.08 |
| D4429 ★ | 09a | Test Method for CBR California Bearing Ratio of Soils in Place __ | 04.08 |
| D4729 | 08 | Test Method for In Situ Stress and Modulus of Deformation Using Flatjack Method | 04.08 |
| D4767 ★ | 04 | Test Method for Consolidated Undrained Triaxial Compression Test for Cohesive Soils | 04.08 |
| D5202 | 08 | Test Method for Determining Triaxial Compression Creep Strength of Chemical Grouted Soils | 04.08 |
| D5311 | 92(2004)ε1 | Test Method for Load Controlled Cyclic Triaxial Strength of Soil | 04.08 |
| D5874 | 02(2007) | Test Method for Determination of the Impact Value (IV) of a Soil | 04.08 |
| D6128 | 06 | Test Method for Shear Testing of Bulk Solids Using the Jenike Shear Cell | 04.09 |
| D6467 | 06a | Test Method for Torsional Ring Shear Test to Determine Drained Residual Shear Strength of Cohesive Soils | 04.09 |
| D6528 | 07 | Test Method for Consolidated Undrained Direct Simple Shear Testing of Cohesive Soils | 04.09 |
| D6682 | 08 | Test Method for Measuring Shear Stresses of Powders Using Peschl Rotational Split Level Shear Tester | 04.09 |
| D6758 | 08 | Test Method for Measuring Stiffness and Apparent Modulus of Soil and Soil-Aggregate In-Place by Electro-Mechanical Method | 04.09 |
| D6773 | 08 | Test Method for Bulk Solids Using Schulze Ring Shear Tester | 04.09 |
| D7207 | 05 | Test Method for Determination of Unvegetated Rolled Erosion Control Product (RECP) Ability to Protect Sand from Hydraulically-Induced Shear Stresses under Bench-Scale Conditions | 04.09 |
| Consolidation, swell and collapse (9) | |||
| D2435 ★ | 04 | Test Methods for One-Dimensional Consolidation Properties of Soils Using Incremental Loading | 04.08 |
| D3877 | 08 | Test Methods for One-Dimensional Expansion, Shrinkage, and Uplift Pressure of Soil-Lime Mixtures | 04.08 |
| D4083 | 89(2007) | Practice for Description of Frozen Soils (Visual-Manual Procedure) | 04.08 |
| D4186 | 06 | Test Method for One-Dimensional Consolidation Properties of Saturated Cohesive Soils Using Controlled-Strain Loading | 04.08 |
| D4546 ★ | 08 | Test Methods for One-Dimensional Swell or Collapse of Cohesive Soils | 04.08 |
| D4829 ★ | 08a | Test Method for Expansion Index of Soils | 04.08 |
| D5333 | 03 | Test Method for Measurement of Collapse Potential of Soils | 04.08 |
| D5918 | 06 | Test Methods for Frost Heave and Thaw Weakening Susceptibility of Soils | 04.09 |
| D7300 | 06 | Test Method for Laboratory Determination of Strength Properties of Frozen Soil at a Constant Rate of Strain | 04.09 |
| Permeability and suction (11) | |||
| D2434 ★ | 68(2006) | Test Method for Permeability of Granular Soils (Constant Head) | 04.08 |
| D4511 | 00(2006) | Test Method for Hydraulic Conductivity of Essentially Saturated Peat | 04.08 |
| D4525 | 08 | Test Method for Permeability of Rocks by Flowing Air | 04.08 |
| D4630 | 96(2008) | Test Method for Determining Transmissivity and Storage Coefficient of Low-Permeability Rocks by In Situ Measurements Using the Constant Head Injection Test | 04.08 |
| D4631 | 95(2008) | Test Method for Determining Transmissivity and Storativity of Low Permeability Rocks by In Situ Measurements Using Pressure Pulse Technique | 04.08 |
| D5084 ★ | 03 | Test Methods for Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter | 04.08 |
| D5298 | 03 | Test Method for Measurement of Soil Potential (Suction) Using Filter Paper | 04.08 |
| D6527 | 00(2008) | Test Method for Determining Unsaturated and Saturated Hydraulic Conductivity in Porous Media by Steady-State Centrifugation | 04.09 |
| D6836 | 02(2008)ε2 | Test Methods for Determination of the Soil Water Characteristic Curve for Desorption Using Hanging Column, Pressure Extractor, Chilled Mirror Hygrometer, or Centrifuge | 04.09 |
| D7100 | 06 | Test Method for Hydraulic Conductivity Compatibility Testing of Soils with Aqueous Solutions | 04.09 |
| D7243 | 06a | Guide for Measuring the Saturated Hydraulic Conductivity of Paper Industry Sludges | 04.09 |
| Exploration, sampling and in situ testing (47) | |||
| D420 ★ | 98(2003) | Guide to Site Characterization for Engineering Design and Construction Purposes | 04.08 |
| D421 ★ | 85(2007) | Practice for Dry Preparation of Soil Samples for Particle-Size Analysis and Determination of Soil Constants | 04.08 |
| D1452 | 09 | Practice for Soil Exploration and Sampling by Auger Borings | 04.08 |
| D1558 | 99(2004)ε1 | Test Method for Moisture Content Penetration Resistance Relationships of Fine-Grained Soils | 04.08 |
| D1586 ★ | 08a | Test Method for Standard Penetration Test (SPT) and Split-Barrel Sampling of Soils | 04.08 |
| D1587 ★ | 08 | Practice for Thin-Walled Tube Sampling of Soils for Geotechnical Purposes | 04.08 |
| D1997 | 91(2008)ε1 | Test Method for Laboratory Determination of the Fiber Content of Peat Samples by Dry Mass | 04.08 |
| D2573 ★ | 08 | Test Method for Field Vane Shear Test in Cohesive Soil | 04.08 |
| D2944 | 71(2008) | Test Method of Sampling Processed Peat Materials | 04.08 |
| D3441 ★ | 05 | Test Method for Mechanical Cone Penetration Tests of Soil | 04.08 |
| D3550 | 01(2007) | Practice for Thick Wall, Ring-Lined, Split Barrel, Drive Sampling of Soils | 04.08 |
| D4220 ★ | 95(2007) | Practices for Preserving and Transporting Soil Samples | 04.08 |
| D4427 | 07 | Classification of Peat Samples by Laboratory Testing | 04.08 |
| D4452 | 06 | Practice for X-Ray Radiography of Soil Samples | 04.08 |
| D4633 ★ | 10 | Test Method for Energy Measurement for Dynamic Penetrometers | 04.08 |
| D4648 | 05 | Test Method for Laboratory Miniature Vane Shear Test for Saturated Fine-Grained Clayey Soil | 04.08 |
| D4719 ★ | 07 | Test Methods for Prebored Pressuremeter Testing in Soils | 04.08 |
| D5520 | 94(2006)ε1 | Test Method for Laboratory Determination of Creep Properties of Frozen Soil Samples by Uniaxial Compression | 04.08 |
| D5714 | 95(2002) | Specification for Content of Digital Geospatial Metadata | 04.08 |
| D5778 ★ | 07 | Test Method for Electronic Friction Cone and Piezocone Penetration Testing of Soils | 04.08 |
| D5781 | 95(2006) | Guide for Use of Dual-Wall Reverse-Circulation Drilling for Geoenvironmental Exploration and the Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5782 | 95(2006) | Guide for Use of Direct Air-Rotary Drilling for Geoenvironmental Exploration and the Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5783 | 95(2006) | Guide for Use of Direct Rotary Drilling with Water-Based Drilling Fluid for Geoenvironmental Exploration and the Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5784 | 95(2006) | Guide for Use of Hollow-Stem Augers for Geoenvironmental Exploration and the Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5872 | 95(2006) | Guide for Use of Casing Advancement Drilling Methods for Geoenvironmental Exploration and Installation of Subsurface Water- Quality Monitoring Devices | 04.08 |
| D5875 | 95(2006) | Guide for Use of Cable-Tool Drilling and Sampling Methods for Geoenvironmental Exploration and Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5876 | 95(2005) | Guide for Use of Direct Rotary Wireline Casing Advancement Drilling Methods for Geoenvironmental Exploration and Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5879 | 95(2003) | Practice for Surface Site Characterization for On-Site Septic Systems | 04.09 |
| D5911 | 96(2002)ε1 | Practice for Minimum Set of Data Elements to Identify a Soil Sampling Site | 04.09 |
| D5921 | 96(2003)ε1 | Practice for Subsurface Site Characterization of Test Pits for On-Site Septic Systems | 04.09 |
| D5971 | 07 | Practice for Sampling Freshly Mixed Controlled Low-Strength Material | 04.09 |
| D6066 | 96(2004) | Practice for Determining the Normalized Penetration Resistance of Sands for Evaluation of Liquefaction Potential | 04.09 |
| D6151 | 08 | Practice for Using Hollow-Stem Augers for Geotechnical Exploration and Soil Sampling | 04.09 |
| D6230 ★ | 98(2005) | Test Method for Monitoring Ground Movement Using Probe-Type Inclinometers | 04.09 |
| D6236 | 98(2004) | Guide for Coring and Logging Cement - or Lime-Stabilized Soil | 04.09 |
| D6391 | 06 | Test Method for Field Measurement of Hydraulic Conductivity Limits of Porous Materials Using Two Stages of Infiltration from a Borehole | 04.09 |
| D6519 | 08 | Practice for Sampling of Soil Using the Hydraulically Operated Stationary Piston Sampler | 04.09 |
| D6598 ★ | 07 | Guide for Installing and Operating Settlement Platforms for Monitoring Vertical Deformations | 04.09 |
| D6635 ★ | 01(2007) | Test Method for Performing the Flat Plate Dilatometer | 04.09 |
| D6914 | 04ε1 | Practice for Sonic Drilling for Site Characterization and the Installation of Subsurface Monitoring Devices | 04.09 |
| D7015 | 07 | Practices for Obtaining Intact Block (Cubical and Cylindrical) Samples of Soils | 04.09 |
| D7299 | 06 | Practice for Verifying Performance of a Vertical Inclinometer Probe | 04.09 |
| D7380 | 08 | Test Method for Soil Compaction Determination at Shallow Depths Using 5-lb (2.3 kg) Dynamic Cone Penetrometer | 04.09 |
| D7384 | 09 | Practice for Minimum Geospatial Data for a Surface Coal Mining Permit Boundary | 04.09 |
| D7443 | 09 | Practice for Minimum Geospatial Data for Underground Coal Mining Extents | 04.09 |
| D7533/D7533M | 09 | Practice for Minimum Geospatial Data for Abandoned Mine Land Problem Area | 04.09 |
| D7534/D7534M | 09 | Practice for Minimum Geospatial Data for Abandoned Mine Land Planning Unit | 04.09 |
| Geophysical methods (16) | |||
| D4428/D4428M ★ | 07 | Test Methods for Crosshole Seismic Testing | 04.08 |
| D5753 | 05 | Guide for Planning and Conducting Borehole Geophysical Logging | 04.08 |
| D5777 ★ | 00(2006) | Guide for Using the Seismic Refraction Method for Subsurface Investigation | 04.08 |
| D6167 | 97(2004) | Guide for Conducting Borehole Geophysical Logging: Mechanical Caliper | 04.09 |
| D6274 | 98(2004) | Guide for Conducting Borehole Geophysical Logging - Gamma | 04.09 |
| D6429 | 99(2006) | Guide for Selecting Surface Geophysical Methods | 04.09 |
| D6430 | 99(2005) | Guide for Using the Gravity Method for Subsurface Investigation | 04.09 |
| D6431 | 99(2005) | Guide for Using the Direct Current Resistivity Method for Subsurface Investigation | 04.09 |
| D6432 | 99(2005) | Guide for Using the Surface Ground Penetrating Radar Method for Subsurface Investigation | 04.09 |
| D6639 | 01(2008) | Guide for Using the Frequency Domain Electromagnetic Method for Subsurface Investigations | 04.09 |
| D6726 | 01(2007) | Guide for Conducting Borehole Geophysical Logging— Electromagnetic Induction | 04.09 |
| D6727 | 01(2007) | Guide for Conducting Borehole Geophysical Logging— Neutron | 04.09 |
| D6820 | 20 | Guide for Use of the Time Domain Electromagnetic Method for Subsurface Investigation | 04.09 |
| D7046 | 04 | Guide for Use of the Metal Detection Method for Subsurface Investigation | 04.09 |
| D7128 | 05 | Guide for Using the Seismic-Reflection Method for Shallow Subsurface Investigation | 04.09 |
| D7400 | 08 | Test Methods for Downhole Seismic Testing | 04.09 |
| Rock (56) | |||
| D653 | 09 | Terminology Relating to Soil, Rock, and Contained Fluids | 04.08 |
| D1635 | 00(2006) | Test Method for Flexural Strength of Soil-Cement Using Simple Beam with Third-Point Loading | 04.08 |
| D2113 ★ | 08 | Practice for Rock Core Drilling and Sampling of Rock for Site Investigation | 04.08 |
| D2216 ★ | 05 | Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass | 04.08 |
| D2845 | 08 | Test Method for Laboratory Determination of Pulse Velocities and Ultrasonic Elastic Constants of Rock | 04.08 |
| D2936 | 08 | Test Method for Direct Tensile Strength of Intact Rock Core Specimens | 04.08 |
| D3740 | 08 | Practice for Minimum Requirements for Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction | 04.08 |
| D3967 | 08 | Test Method for Splitting Tensile Strength of Intact Rock Core Specimens | 04.08 |
| D4394 | 08 | Test Method for Determining In Situ Modulus of Deformation of Rock Mass Using Rigid Plate Loading Method | 04.08 |
| D4395 | 08 | Test Method for Determining In Situ Modulus of Deformation of Rock Mass Using Flexible Plate Loading Method | 04.08 |
| D4403 | 84(2005) | Practice for Extensometers Used in Rock | 04.08 |
| D4404 | 84(2004) | Test Method for Determination of Pore Volume and Pore Volume Distribution of Soil and Rock by Mercury Intrusion Porosimetry | 04.08 |
| D4436 | 08 | Test Method for Rock Bolt Long-Term Load Retention Test | 04.08 |
| D4506 | 08 | Test Method for Determining In Situ Modulus of Deformation of Rock Mass Using Radial Jacking Test | 04.08 |
| D4535 | 08 | Test Methods for Measurement of Thermal Expansion of Rock Using Dilatometer | 04.08 |
| D4543 | 08 | Practices for Preparing Rock Core as Cylindrical Test Specimens and Verifying Conformance to Dimensional and Shape Tolerances | 04.08 |
| D4553 | 08 | Test Method for Determining In Situ Creep Characteristics of Rock | 04.08 |
| D4554 | 02(2006) | Test Method for In Situ Determination of Direct Shear Strength of Rock Discontinuities | 04.08 |
| D4555 | 01(2005) | Test Method for Determining Deformability and Strength of Weak Rock by an In Situ Uniaxial Compressive Test | 04.08 |
| D4611 | 08 | Test Method for Specific Heat of Rock and Soil | 04.08 |
| D4623 | 08 | Test Method for Determination of In Situ Stress in Rock Mass by Overcoring Method—USBM Borehole Deformation Gauge | 04.08 |
| D4644 | 08 | Test Method for Slake Durability of Shales and Similar Weak Rocks | 04.08 |
| D4645 | 08 | Test Method for Determination of In-Situ Stress in Rock Using Hydraulic Fracturing Method | 04.08 |
| D4753 | 07 | Guide for Evaluating, Selecting, and Specifying Balances and Standard Masses for Use in Soil, Rock, and Construction Materials Testing | 04.08 |
| D4879 | 08 | Guide for Geotechnical Mapping of Large Underground Openings in Rock | 04.08 |
| D4914 | 08 | Test Methods for Density and Unit Weight of Soil and Rock in Place by the Sand Replacement Method in a Test Pit | 04.08 |
| D4971 | 08 | Test Method for Determining In Situ Modulus of Deformation of Rock Using Diametrically Loaded 76-mm (3-in.) Borehole Jack | 04.08 |
| D4992 | 07 | Practice for Evaluation of Rock to be Used for Erosion Control | 04.08 |
| D5030 | 04 | Test Method for Density of Soil and Rock in Place by the Water Replacement Method in a Test Pit | 04.08 |
| D5079 | 08 | Practices for Preserving and Transporting Rock Core Samples | 04.08 |
| D5121 | 06 | Practice for Preparation of Rock Slabs for Durability Testing | 04.08 |
| D5195 | 08 | Test Method for Density of Soil and Rock In-Place at Depths Below Surface by Nuclear Methods | 04.08 |
| D5220 | 08 | Test Method for Water Mass per Unit Volume of Soil and Rock In-Place by the Neutron Depth Probe Method | 04.08 |
| D5240 | 04 | Test Method for Testing Rock Slabs to Evaluate Soundness of Riprap by Use of Sodium Sulfate or Magnesium Sulfate | 04.08 |
| D5255 | 01(2008) | Practice for Certification of Personnel Engaged in the Testing of Soil and Rock | 04.08 |
| D5312 | 04 | Test Method for Evaluation of Durability of Rock for Erosion Control Under Freezing and Thawing Conditions | 04.08 |
| D5313 | 04 | Test Method for Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions | 04.08 |
| D5334 | 08 | Test Method for Determination of Thermal Conductivity of Soil and Soft Rock by Thermal Needle Probe Procedure | 04.08 |
| D5335 | 08 | Test Method for Linear Coefficient of Thermal Expansion of Rock Using Bonded Electric Resistance Strain Gauges | 04.08 |
| D5434 | 09 | Guide for Field Logging of Subsurface Explorations of Soil and Rock | 04.08 |
| D5607 | 08 | Test Method for Performing Laboratory Direct Shear Strength Tests of Rock Specimens Under Constant Normal Force | 04.08 |
| D5730 | 04 | Guide for Site Characterization for Environmental Purposes With Emphasis on Soil, Rock, the Vadose Zone and Ground Water | 04.08 |
| D5731 ★ | 08 | Test Method for Determination of the Point Load Strength Index of Rock and Application to Rock Strength Classifications | 04.08 |
| D5779 | 08 | Test Method for Field Determination of Apparent Specific Gravity of Rock and Manmade Materials for Erosion Control | 04.08 |
| D5873 | 05 | Test Method for Determination of Rock Hardness by Rebound Hammer Method | 04.08 |
| D5878 | 08 | Guide for Using Rock-Mass Classification Systems for Engineering Purposes | 04.09 |
| D5883 | 96(2008) | Guide for Use of Rotary Kiln Produced Expanded Shale, Clay or Slate (ESCS) as a Mineral Amendment in Topsoil Used for Landscaping and Related Purposes | 04.09 |
| D6031 | 96(2004) | Test Method for Logging In Situ Moisture Content and Density of Soil and Rock by the Nuclear Method in Horizontal, Slanted, and Vertical Access Tubes | 04.09 |
| D6032 ★ | 08 | Test Method for Determining Rock Quality Designation (RQD) of Rock Core | 04.09 |
| D6168 | 97(2004) | Guide for Selection of Minimum Set of Data Elements Required to Identify Locations Chosen for Field Collection of Information to Describe Soil, Rock, and Their Contained Fluids | 04.09 |
| D6169 | 98(2005) | Guide for Selection of Soil and Rock Sampling Devices Used With Drill Rigs for Environmental Investigations | 04.09 |
| D6473 | 99(2005) | Test Method For Specific Gravity And Absorption of Rock For Erosion Control | 04.09 |
| D6711 | 01(2008) | Practice for Specifying Rock to Fill Gabions, Revet Mattresses, and Gabion Mattresses | 04.09 |
| D7070 | 08 | Test Methods for Creep of Rock Core Under Constant Stress and Temperature | 04.09 |
| D7099 | 04 | Terminology Relating to Frozen Soil and Rock | 04.09 |
| D7458 | 08 | Test Method for Determination of Beryllium in Soil, Rock, Sediment, and Fly Ash Using Ammonium Bifluoride Extraction and Fluorescence Detection | 04.09 |
| Deep foundations and anchors (10) | |||
| D1143/D1143M ★ | 07ε1 | Test Methods for Deep Foundations Under Static Axial Compressive Load | 04.08 |
| D3689 ★ | 07 | Test Methods for Deep Foundations Under Static Axial Tensile Load | 04.08 |
| D3966 | 07 | Test Methods for Deep Foundations Under Lateral Load | 04.08 |
| D4435 | 08 | Test Method for Rock Bolt Anchor Pull Test | 04.08 |
| D4945 ★ | 08 | Test Method for High-Strain Dynamic Testing of Deep Foundations | 04.08 |
| D5780 | 95(2002) | Test Methods for Individual Piles in Permafrost Under Static Axial Compressive Load | 04.08 |
| D5882 ★ | 07 | Test Method for Low Strain Impact Integrity Testing of Deep Foundations | 04.09 |
| D6760 | 08 | Test Method for Integrity Testing of Concrete Deep Foundations by Ultrasonic Crosshole Testing | 04.09 |
| D7383 | 08 | Test Methods for Axial Compressive Force Pulse (Rapid) Testing of Deep Foundations | 04.09 |
| D7401 | 08 | Test Methods for Laboratory Determination of Rock Anchor Capacities by Pull and Drop Tests | 04.09 |
| Stabilization, soil-cement and CLSM (14) | |||
| D806 | 00(2006) | Test Method for Cement Content of Hardened Soil-Cement Mixtures | 04.08 |
| D1632 | 07 | Practice for Making and Curing Soil-Cement Compression and Flexure Test Specimens in the Laboratory | 04.08 |
| D3155 | 98(2006) | Test Method for Lime Content of Uncured Soil-Lime Mixtures | 04.08 |
| D3551 | 08 | Practice for Laboratory Preparation of Soil-Lime Mixtures Using Mechanical Mixer | 04.08 |
| D4016 | 08 | Test Method for Viscosity of Chemical Grouts by Brookfield Viscometer (Laboratory Method) | 04.08 |
| D4223 | 99(2006) | Practice for Preparation of Test Specimens of Asphalt- Stabilized Soils | 04.08 |
| D4320/D4320M | 09 | Practice for Laboratory Preparation of Chemically Grouted Soil Specimens for Obtaining Engineering Parameters | 04.08 |
| D4381 | 06 | Test Method for Sand Content by Volume of Bentonitic Slurries | 04.08 |
| D4609 | 08 | Guide for Evaluating Effectiveness of Admixtures for Soil Stabilization | 04.08 |
| D4832 | 02 | Test Method for Preparation and Testing of Controlled Low Strength Material (CLSM) Test Cylinders | 04.08 |
| D5982 | 07 | Test Method for Determining Cement Content of Fresh Soil-Cement (Heat of Neutralization Method) | 04.09 |
| D6024 | 07 | Test Method for Ball Drop on Controlled Low Strength Material (CLSM) to Determine Suitability for Load Application | 04.09 |
| D6103 | 04 | Test Method for Flow Consistency of Controlled Low Strength Material (CLSM) | 04.09 |
| D6910/D6910M | 09 | Test Method for Marsh Funnel Viscosity of Clay Construction Slurries | 04.09 |
| Erosion control, riprap and revetments (23) | |||
| D5268 | 07 | Specification for Topsoil Used for Landscaping Purposes | 04.08 |
| D5539 | 94(2008) | Specification for Seed Starter Mix | 04.08 |
| D6092 ★ | 97(2008) | Practice for Specifying Standard Sizes of Stone for Erosion Control | 04.09 |
| D6449 | 99(2008) | Test Method for Flow of Fine Aggregate Concrete for Fabric Formed Concrete (Flow Cone Method) | 04.09 |
| D6459 | 07 | Test Method for Determination of Rolled Erosion Control Product (RECP) Performance in Protecting Hillslopes from Rainfall-Induced Erosion | 04.09 |
| D6460 | 07 | Test Method for Determination of Rolled Erosion Control Product (RECP) Performance in Protecting Earthen Channels from Stormwater- Induced Erosion | 04.09 |
| D6461 | 99(2007)ε2 | Specification for Silt Fence Materials | 04.09 |
| D6462 | 03(2008) | Practice for Silt Fence Installation | 04.09 |
| D6475 | 06 | Test Method for Measuring Mass Per Unit Area of Erosion Control Blankets | 04.09 |
| D6599 | 00(2008) | Practice for Construction of Live Fascines on Slopes | 04.09 |
| D6629 | 01(2007) | Guide for Selection of Methods for Estimating Soil Loss by Erosion | 04.09 |
| D6684 | 04 | Specification for Materials and Manufacture of Articulating Concrete Block (ACB) Revetment Systems | 04.09 |
| D6685 | 01(2008) | Guide for the Selection of Test Methods for Fabrics Used for Fabric Formed Concrete (FFC) | 04.09 |
| D6765 | 02(2008) | Practice for Live Staking | 04.09 |
| D6825 ★ | 02(2008)ε1 | Guide for Placement of Riprap Revetments | 04.09 |
| D6884 | 03 | Practice for Installation of Articulating Concrete Block (ACB) Revetment Systems | 04.09 |
| D6939 | 03 | Practice for Brushmattressing | 04.09 |
| D7014 | 04 | Practice for Assembly and Placement of Double-Twisted Wire Mesh Gabions and Revet Mattresses | 04.09 |
| D7047 | 04 | Test Method for Mucilloid Content of Plantago Insularis (Ovata, Psyllium) Used as a Tackifiers | 04.09 |
| D7101 | 08 | Index Test Method for Determination of Unvegetated Rolled Erosion Control Product (RECP) Ability to Protect Soil from Rain Splash and Associated Runoff Under Bench-Scale Conditions | 04.09 |
| D7208 | 06 | Test Method for Determination of Temporary Ditch Check Performance in Protecting Earthen Channels from Stormwater-Induced Erosion | 04.09 |
| D7276 | 08 | Guide for Analysis and Interpretation of Test Data for Articulating Concrete Block (ACB) Revetment Systems in Open Channel Flow | 04.09 |
| D7277 | 08 | Test Method for Performance Testing of Articulating Concrete Block (ACB) Revetment Systems for Hydraulic Stability in Open Channel Flow | 04.09 |
| Chemical and corrosion (2) | |||
| D1411 | 09 | Test Methods for Water-Soluble Chlorides Present as Admixtures in Graded Aggregate Road Mixes | 04.08 |
| D4373 | 02(2007) | Test Method for Rapid Determination of Carbonate Content of Soils | 04.08 |
| Groundwater, wells and environmental (95) | |||
| D3385 | 09 | Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer | 04.08 |
| D3404 | 91(2004) | Guide for Measuring Matric Potential in Vadose Zone Using Tensiometers | 04.08 |
| D4043 | 96(2004) | Guide for Selection of Aquifer Test Method in Determining Hydraulic Properties by Well Techniques | 04.08 |
| D4044 | 96(2008) | Test Method for (Field Procedure) for Instantaneous Change in Head (Slug) Tests for Determining Hydraulic Properties of Aquifers | 04.08 |
| D4050 | 96(2008) | Test Method for (Field Procedure) for Withdrawal and Injection Well Tests for Determining Hydraulic Properties of Aquifer Systems | 04.08 |
| D4104 | 96(2004) | Test Method (Analytical Procedure) for Determining Transmissivity of Nonleaky Confined Aquifers by Overdamped Well Response to Instantaneous Change in Head (Slug Tests) | 04.08 |
| D4105 | 96(2008) | Test Method for (Analytical Procedure) for Determining Transmissivity and Storage Coefficient of Nonleaky Confined Aquifers by the Modified Theis Nonequilibrium Method | 04.08 |
| D4106 | 96(2008) | Test Method for (Analytical Procedure) for Determining Transmissivity and Storage Coefficient of Nonleaky Confined Aquifers by the Theis Nonequilibrium Method | 04.08 |
| D4542 ★ | 07 | Test Method for Pore Water Extraction and Determination of the Soluble Salt Content of Soils by Refractometer | 04.08 |
| D4696 | 92(2008) | Guide for Pore-Liquid Sampling from the Vadose Zone | 04.08 |
| D4700 | 91(2006) | Guide for Soil Sampling from the Vadose Zone | 04.08 |
| D4750 | 87(2001) | Test Method for Determining Subsurface Liquid Levels in a Borehole or Monitoring Well (Observation Well) | 04.08 |
| D5088 | 02(2008) | Practice for Decontamination of Field Equipment Used at Waste Sites | 04.08 |
| D5092 | 04ε1 | Practice for Design and Installation of Ground Water Monitoring Wells | 04.08 |
| D5093 | 02(2008) | Test Method for Field Measurement of Infiltration Rate Using Double-Ring Infiltrometer with Sealed-Inner Ring | 04.08 |
| D5126 | 90(2004) | Guide for Comparison of Field Methods for Determining Hydraulic Conductivity in Vadose Zone | 04.08 |
| D5143 | 06 | Test Method for Analysis of Nitroaromatic and Nitramine Explosive in Soil by High Performance Liquid Chromatography | 04.08 |
| D5254 | 92(2004) | Practice for Minimum Set of Data Elements to Identify a Ground-Water Site | 04.08 |
| D5269 | 96(2008) | Test Method for Determining Transmissivity of Nonleaky Confined Aquifers by the Theis Recovery Method | 04.08 |
| D5270 | 96(2008) | Test Method for Determining Transmissivity and Storage Coefficient of Bounded, Nonleaky, Confined Aquifers | 04.08 |
| D5299 | 99(2005) | Guide for Decommissioning of Ground Water Wells, Vadose Zone Monitoring Devices, Boreholes, and Other Devices for Environmental Activities | 04.08 |
| D5314 | 92(2006) | Guide for Soil Gas Monitoring in the Vadose Zone | 04.08 |
| D5408 | 93(2004) | Guide for Set of Data Elements to Describe a Ground-Water Site; Part One—Additional Identification Descriptors | 04.08 |
| D5409 | 93(2004) | Guide for Set of Data Elements to Describe a Ground-Water Site; Part Two—Physical Descriptors | 04.08 |
| D5410 | 93(2007) | Guide for Set of Data Elements to Describe a Ground-Water Site;Part Three—Usage Descriptors | 04.08 |
| D5435 | 03(2008) | Test Method for Diagnostic Soil Test for Plant Growth and Food Chain Protection | 04.08 |
| D5447 | 04 | Guide for Application of a Ground-Water Flow Model to a Site-Specific Problem | 04.08 |
| D5472 | 93(2005) | Test Method for Determining Specific Capacity and Estimating Transmissivity at the Control Well | 04.08 |
| D5473 | 93(2006) | Test Method for (Analytical Procedure for) Analyzing the Effects of Partial Penetration of Control Well and Determining the Horizontal and Vertical Hydraulic Conductivity in a Nonleaky Confined Aquifer | 04.08 |
| D5474 | 93(2006) | Guide for Selection of Data Elements for Ground-Water Investigations | 04.08 |
| D5490 | 93(2008) | Guide for Comparing Ground-Water Flow Model Simulations to Site-Specific Information | 04.08 |
| D5521 | 05 | Guide for Development of Ground-Water Monitoring Wells in Granular Aquifers | 04.08 |
| D5608 | 01(2006) | Practices for Decontamination of Field Equipment Used at Low Level Radioactive Waste Sites | 04.08 |
| D5609 | 94(2008) | Guide for Defining Boundary Conditions in Ground-Water Flow Modeling | 04.08 |
| D5610 | 94(2008) | Guide for Defining Initial Conditions in Ground-Water Flow Modeling | 04.08 |
| D5611 | 94(2008) | Guide for Conducting a Sensitivity Analysis for a Ground- Water Flow Model Application | 04.08 |
| D5716 | 95(2006) | Test Method for Measuring the Rate of Well Discharge by Circular Orifice Weir | 04.08 |
| D5718 | 95(2006) | Guide for Documenting a Ground-Water Flow Model Application | 04.08 |
| D5719 | 95(2006) | Guide for Simulation of Subsurface Airflow Using Ground-Water Flow Modeling Codes | 04.08 |
| D5737 | 95(2006) | Guide for Methods for Measuring Well Discharge | 04.08 |
| D5738 | 95(2006) | Guide for Displaying the Results of Chemical Analyses of Ground Water for Major Ions and Trace Elements—Diagrams for Single Analyses | 04.08 |
| D5754 | 95(2006) | Guide for Displaying the Results of Chemical Analyses of Ground Water for Major Ions and Trace Elements—Trilinear Diagrams for Two or More Analyses | 04.08 |
| D5785 | 95(2006) | Test Method for (Analytical Procedure) for Determining Transmissivity of Confined Nonleaky Aquifers by Underdamped Well Response to Instantaneous Change in Head (Slug Test) | 04.08 |
| D5786 | 95(2006) | Practice for (Field Procedure) for Constant Drawdown Tests in Flowing Wells for Determining Hydraulic Properties of Aquifer Systems | 04.08 |
| D5787 | 95(2009) | Practice for Monitoring Well Protection | 04.08 |
| D5850 | 95(2006) | Test Method for (Analytical Procedure) Determining Transmissivity, Storage Coefficient, and Anisotropy Ratio from a Network of Partially Penetrating Wells | 04.08 |
| D5855 | 95(2006) | Test Method for (Analytical Procedure) for Determining Transmissivity and Storage Coefficient of Confined Nonleaky or Leaky Aquifer by Constant Drawdown Method in Flowing Well | 04.08 |
| D5877 | 95(2005) | Guide for Displaying Results of Chemical Analyses of Ground Water for Major Ions and Trace Elements—Diagrams Based on Data Analytical Calculations | 04.09 |
| D5881 | 95(2005) | Test Method for (Analytical Procedure) Determining Transmissivity of Confined Nonleaky Aquifers by Critically Damped Well Response to Instantaneous Change in Head (Slug) | 04.09 |
| D5903 | 96(2006) | Guide for Planning and Preparing for a Groundwater Sampling Event | 04.09 |
| D5912 | 96(2004) | Test Method for (Analytical Procedure) Determining Hydraulic Conductivity of an Unconfined Aquifer by Overdamped Well Response to Instantaneous Change in Head (Slug) | 04.09 |
| D5920 | 96(2005) | Test Method (Analytical Procedure) for Tests of Anisotropic Unconfined Aquifers by Neuman Method | 04.09 |
| D5922 | 96(2004) | Guide for Analysis of Spatial Variation in Geostatistical Site Investigations | 04.09 |
| D5923 | 96(2004) | Guide for Selection of Kriging Methods in Geostatistical Site Investigations | 04.09 |
| D5978 | 96(2005) | Guide for Maintenance and Rehabilitation of Ground-Water Monitoring Wells | 04.09 |
| D5979 | 96(2008) | Guide for Conceptualization and Characterization of Ground-Water Systems | 04.09 |
| D5980 | 96(2004) | Guide for Selection and Documentation of Existing Wells for Use in Environmental Site Characterization and Monitoring | 04.09 |
| D5981 | 96(2008) | Guide for Calibrating a Ground-Water Flow Model Application | 04.09 |
| D5995 | 98(2004) | Guide for Environmental Site Characterization in Cold Regions | 04.09 |
| D6000 | 96(2008) | Guide for Presentation of Water-Level Information from Ground-Water Sites | 04.09 |
| D6001 | 05 | Guide for Direct-Push Ground Water Sampling for Environmental Site Characterization | 04.09 |
| D6025 | 96(2008) | Guide for Developing and Evaluating Ground-Water Modeling Codes | 04.09 |
| D6028 | 96(2004) | Test Method (Analytical Procedure) for Determining Hydraulic Properties of a Confined Aquifer Taking into Consideration Storage of Water in Leaky Confining Beds by Modified Hantush Method | 04.09 |
| D6029 | 96(2004) | Test Method (Analytical Procedure) for Determining Hydraulic Properties of a Confined Aquifer and a Leaky Confining Bed with Negligible Storage by the Hantush-Jacob Method | 04.09 |
| D6030 | 96(2008) | Guide for Selection of Methods for Assessing Ground Water or Aquifer Sensitivity and Vulnerability | 04.09 |
| D6033 | 96(2008) | Guide for Describing the Functionality of a Ground-Water Modeling Code | 04.09 |
| D6034 | 96(2004) | Test Method (Analytical Procedure) for Determining the Efficiency of a Production Well in a Confined Aquifer from a Constant Rate Pumping Test | 04.09 |
| D6036 | 96(2008) | Guide for Displaying the Results of Chemical Analyses of Ground Water for Major Ions and Trace Elements—Use of Maps | 04.09 |
| D6067 | 96(2003) | Guide for Using the Electronic Cone Penetrometer for Environmental Site Characterization | 04.09 |
| D6089 | 97(2003) | Guide for Documenting a Ground-Water Sampling Event | 04.09 |
| D6106 | 97(2004) | Guide for Establishing Nomenclature of Ground-Water Aquifers | 04.09 |
| D6170 | 97(2004) | Guide for Selecting a Ground-Water Modeling Code | 04.09 |
| D6171 | 97(2004) | Guide for Documenting a Ground-Water Modeling Code | 04.09 |
| D6187 | 97(2003) | Practice for Cone Penetrometer Technology Characterization of Petroleum Contaminated Sites with Nitrogen Laser-Induced Fluorescence | 04.09 |
| D6235 | 04 | Practice for Expedited Site Characterization of Vadose Zone and Ground Water Contamination at Hazardous Waste Contaminated Sites | 04.09 |
| D6282 | 98(2005) | Guide for Direct Push Soil Sampling for Environmental Site Characterizations | 04.09 |
| D6285 | 99(2005) | Guide for Locating Abandoned Wells | 04.09 |
| D6286 | 98(2006) | Guide for Selection of Drilling Methods for Environmental Site Characterization | 04.09 |
| D6312 | 98(2005) | Guide for Developing Appropriate Statistical Approaches for Ground-Water Detection Monitoring Programs | 04.09 |
| D6452 | 99(2005) | Guide for Purging Methods for Wells Used for Ground-Water Quality Investigations | 04.09 |
| D6517 | 00(2005) | Guide for Field Preservation of Ground-Water Samples | 04.09 |
| D6564 | 00(2005) | Guide for Field Filtration of Ground-Water Samples | 04.09 |
| D6634 | 01(2006) | Guide for the Selection of Purging and Sampling Devices for Ground-Water Monitoring Wells | 04.09 |
| D6642 | 01(2006) | Guide for Comparison of Techniques to Quantify the Soil-Water (Moisture) Flux | 04.09 |
| D6724 | 04 | Guide for Installation of Direct Push Ground Water Monitoring Wells | 04.09 |
| D6725 | 04 | Practice for Direct Push Installation of Prepacked Screen Monitoring Wells in Unconsolidated Aquifers | 04.09 |
| D6771 | 02 | Practice for Low-Flow Purging and Sampling for Wells and Devices Used for Ground-Water Quality Investigations | 04.09 |
| D6911 | 03 | Guide for Packaging and Shipping Environmental Samples for Laboratory Analysis | 04.09 |
| D7045 | 04 | Guide for Optimization of Ground Water Monitoring Constituents for Detection Monitoring Programs for RCRA Waste Disposal Facilities | 04.09 |
| D7048 | 04 | Guide for Applying Statistical Methods for Assessment and Corrective Action Environmental Monitoring Programs | 04.09 |
| D7069 | 04 | Guide for Field Quality Assurance in a Ground-water Sampling Event | 04.09 |
| D7242 | 06 | Practice for Field Pneumatic Slug (Instantaneous Change in Head) Tests to Determine Hydraulic Properties of Aquifers with Direct Push Ground Water Samplers | 04.09 |
| D7262 | 07 | Test Method for Estimating the Permanganate Natural Oxidant Demand of Soil and Aquifer Solids | 04.09 |
| D7322 | 07 | Test Method for Determination of Rolled Erosion Control Product (RECP) Ability to Encourage Seed Germination and Plant Growth Under Bench-Scale Conditions | 04.09 |
| D7352 | 07 | Practice for Direct Push Technology for Volatile Contaminant Logging with the Membrane Interface Probe (MIP) | 04.09 |
| Specifications and aggregates (5) | |||
| D1241 | 07 | Specification for Materials for Soil-Aggregate Subbase, Base, and Surface Courses | 04.08 |
| D6393 | 08 | Test Method for Bulk Solids Characterization by Carr Indices | 04.09 |
| D6940 | 04 | Practice for Measuring Sifting Segregation Tendencies of Bulk Solids | 04.09 |
| D6941 | 05ε1 | Practice for Measuring Fluidization Segregation Tendencies of Powders | 04.09 |
| D7481 | 09 | Test Methods for Determining Loose and Tapped Bulk Densities of Powders using a Graduated Cylinder | 04.09 |
| Other (6) | |||
| D3213 | 08 | Practices for Handling, Storing, and Preparing Soft Intact Marine Soil | 04.08 |
| D4612 | 08 | Practice for Calculating Thermal Diffusivity of Rocks | 04.08 |
| D5880 | 95(2006) | Guide for Subsurface Flow and Transport Modeling | 04.09 |
| D5924 | 96(2004) | Guide for Selection of Simulation Approaches in Geostatistical Site Investigations | 04.09 |
| D7351 | 07 | Test Method for Determination of Sediment Retention Device Effectiveness in Sheet Flow Applications | 04.09 |
| D7367 | 07 | Test Method for Determining Water Holding Capacity of Fiber Mulches for Hydraulic Planting | 04.09 |
ASTM International, Annual Book of ASTM Standards 2010, Volume 00.01, Subject Index and Alphanumeric List. Designations and titles are listed for reference; the standards themselves must be obtained from ASTM.
The specific gravity of the solids, Gs, ties together every weight-volume calculation (Section 5.2.21), the hydrometer analysis and the zero-air-voids curve. Most mineral soils fall between 2.65 and 2.75; a lower value warns of organic matter, cinders or other light particles, which are common in old railroad fills. The pycnometer test is simple, but entrapped air and temperature differences are its main sources of error.
Equation 5.2-6. Specific gravity by pycnometer
W1 = flask filled with water to the mark at T; W2 = flask with soil and water filled to the mark; Ws = oven-dry soil. A ranges from 1.0007 at 16°C to 0.9974 at 30°C. ASTM D854.
Three pycnometer trials on a light brown sandy silt were run at 23°C (Das, Table 3-3). The scanned table prints W2 for the first flask as 722.0 g; the water mass of 37.0 g printed in the same column requires 728.0 g, which is used here.
| Variable | Value | Description |
|---|---|---|
| W1 | 666.0, 674.0, 652.0 g | Flask + water to the mark |
| W2 | 728.0, 738.3, 709.93 g | Flask + soil + water |
| Ws | 99.0, 103.0, 92.0 g | Oven-dry soil |
| T | 23°C | A = 0.9993 |
The specific gravity of the solids is 2.68, typical of quartz-rich silt and sand.
Use the measured value rather than an assumed 2.65 or 2.70 in the phase relationships and the hydrometer analysis; a 0.05 error in Gs shifts a computed void ratio by about 3%.
Open the specific gravity calculator →
Pycnometer reduction for any number of trials, the temperature correction to 20 °C, the average and the spread check.
Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.
The gradation curve classifies the soil (USCS, Section 2.2.4.2), checks filter and subballast criteria, and screens frost susceptibility and liquefaction. Sieves cover gravel and sand; the hydrometer test, which measures the density of a soil-water suspension as particles settle, extends the curve into the silt and clay sizes so that the clay fraction and activity can be found.
Equation 5.2-7. Sieve analysis
Wn = mass retained on sieve n; W = oven-dry specimen mass. Mass lost during sieving should be under 2%.
Equation 5.2-8. Hydrometer analysis (ASTM 152H)
From Stokes’ law. Fz = zero correction; Fm = meniscus correction; T in °C (15 to 28); t in minutes; η = viscosity of water (g·s/cm²); D in mm.
A 500-g sample of sand with some fines was sieved (Das, Table 4-2), and a 50-g sample of brown silty clay was tested with the 152H hydrometer at 28°C (Das, Table 5-4; Gs = 2.75, Fz = 7, Fm = 1).
| Variable | Value | Description |
|---|---|---|
| W | 500 g | Sieve specimen |
| Retained | 0, 40.2, 84.6, 50.2, 40.0, 106.4, 108.8, 59.4 g; pan 8.7 g | No. 4, 10, 20, 30, 40, 60, 140, 200 |
| Hydrometer | R = 51 at 0.25 min … 27 at 2,880 min | Ws = 50 g, T = 28°C |
The sand is poorly graded (SP) with only 2% fines; the silty clay has about 54% clay-size particles.
For railroad work the sand’s narrow gradation matters for filters and subballast (Section 2.4.19); the clay fraction of the silty clay, with its PI, gives the activity used to screen swell (Section 2.2.15).
Open the particle-size analysis calculator →
Sieve reduction with the loss check, the 152H hydrometer reduction with all corrections, the combined gradation curve, D10, D30, D60, Cu, Cc and the gravel, sand, fines and clay fractions.
Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.
The liquid and plastic limits place a fine-grained soil on the plasticity chart, correlate with compressibility and strength, and, with the natural water content, show whether a clay is near its liquid limit (sensitive, likely to flow) or below its plastic limit (stiff or desiccated). The shrinkage limit adds a measure of how much the soil will shrink as it dries, which matters for embankment cracking and track geometry on expansive clay.
Equation 5.2-9. Liquid limit
FI = flow index; N = blows to close the groove 1/2 in. The one-point method applies for N = 20 to 30. The cone method (Nagaraj, 1993) is less operator-dependent and agrees with the cup below LL ≈ 100%.
Equation 5.2-10. Plastic and shrinkage limits and indices
A-line: PI = 0.73(LL − 20). Vi, Vf = volume of the wet and dry pat (mercury mass/13.6, or wax method ASTM D4943).
| Index | Range | Meaning |
|---|---|---|
| Liquidity index LI | > 1 | Water content above LL: sensitive, flows when remolded |
| 0 to 1 | Plastic range | |
| < 0 | Below PL: stiff, often desiccated or overconsolidated | |
| Activity A | < 0.75 | Inactive (kaolinite) |
| 0.75 to 1.25 | Normal (illite) | |
| > 1.25 | Active (smectite): swell likely |
Three cup trials, a plastic limit trial and a shrinkage limit pat were run on samples from the Das laboratory manual (Tables 6-1, 7-1 and 8-1).
| Variable | Value | Description |
|---|---|---|
| LL trials | cans 15.26/29.30/25.84 g at N = 35; 17.01/31.58/27.72 g at N = 23; 15.17/31.45/26.96 g at N = 17 | can, can + wet, can + dry |
| PL trial | 13.33/23.86/22.27 g | |
| SL pat | dish 12.34 g; + wet 40.43 g; + dry 33.68 g; Vi = 14.62, Vf = 11.05 cm³ | Mercury 198.83 g and 150.30 g /13.6 |
The fines are a lean clay (CL) with LL 35, PI 17.5 and a shrinkage limit of about 15%.
LL/SL = 2.4, a moderate shrinkage potential: fills of this clay will crack when they dry below about 15% water content, opening paths for rain into the embankment.
Open the Atterberg limits calculator →
Liquid limit by multipoint flow curve, one-point method or fall cone; plastic limit; shrinkage limit and ratio; PI, LI, activity, toughness index and the plasticity chart.
Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.
Laboratory permeability tests give the hydraulic conductivity of a specimen at a known density. Constant-head tests suit clean sands and gravels; falling-head tests suit finer sands and silts; clays need a flexible-wall permeameter (ASTM D5084). Results are corrected to 20°C because the viscosity of water changes about 2% per degree. Field values, which are controlled by layering and fissures, are usually higher; use the lab value to compare materials, design filters and check drainage layers.
Equation 5.2-11. Coefficient of permeability
Q = volume collected in time t; h = constant head difference; a = standpipe area; h1, h2 = heads at the start and end; A, L = specimen area and length; ηT/η20 = 0.889 at 25°C, 1.135 at 15°C.
A uniform sand was tested in a 6.35-cm permeameter at three heads (Das, Tables 10-2 and 10-3). The specimen’s dry mass was 726.9 g and Gs = 2.66.
| Variable | Value | Description |
|---|---|---|
| D, L | 6.35 cm; 13.2 cm | A = 31.67 cm² |
| Q | 305, 375, 395 cm³ in 60 s | |
| h | 60, 70, 80 cm | |
| T | 25°C | η25/η20 = 0.889 |
| Md | 726.9 g | Dry specimen |
The sand’s permeability is about 3 × 10−2 cm/s at 20°C, typical of a clean, uniform medium sand.
This is free-draining for a subballast or drainage blanket; check the filter criteria against the subgrade (Section 2.4.19) so fines do not migrate into it.
Open the laboratory permeability calculator →
Constant- and falling-head reductions for any number of runs, the viscosity correction to 20 °C, the specimen void ratio, k in cm/s and ft/day.
Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.
The unconfined compression test is the quickest measure of the undrained strength of a clay sample: an unconfined cylinder is loaded axially until it fails or reaches 15 to 20% strain. It is the strength usually reported on boring logs of cohesive soil and used for quick undrained stability checks of embankments and cuts. Because there is no confinement, fissures and sample disturbance lower the result, so it is a lower bound to the in-situ strength.
Equation 5.2-12. Stress, strength and modulus
A0 = initial area; the area correction assumes the specimen bulges uniformly. ASTM D2166.
A 1.43-in. by 3.0-in. specimen of light brown clay was tested in a frame with a proving ring of 0.264 lb per division (Das, Table 16-1).
| Variable | Value | Description |
|---|---|---|
| D, L0 | 1.43 in.; 3.0 in. | A0 = 1.606 in.² |
| Ring factor | 0.264 lb/div | |
| Readings | ΔL 0 to 0.36 in.; dial 0 to 86 div | 17 readings |
The clay has an unconfined strength of 13.3 psi, so su ≈ 960 psf (medium stiff).
Before using it for a slope or bearing check, compare with pocket penetrometer and vane readings on the same sample; if the clay is fissured or the sample was disturbed, the field strength may be noticeably higher, and a UU triaxial test is the better design value.
Open the unconfined compression calculator →
Strain, area-corrected stress and the stress-strain curve from raw dial readings; qu, su, strain at failure, E50, consistency and sensitivity.
Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.
The direct shear box is the common test for the friction angle of sands, ballast fines, subballast and drained clays (at slow rates). The upper half of the box is displaced across the lower half under a fixed normal load while the shear force and the change in height are recorded. Dense sands reach a peak and then soften toward an ultimate value as they dilate; loose sands contract and show no clear peak. Section 5.2.17 (Shear Strength from Lab Tests) fits envelopes to already-reduced results; this section reduces the raw readings.
Equation 5.2-13. Direct shear reduction
A = box area; N = normal load; S = shear force. ASTM D3080: for clays, shear slowly enough for drainage.
A 2-in. square specimen of uniform sand at e = 0.596 was sheared under a normal load of 56 lb (Das, Tables 15-1 and 15-2).
| Variable | Value | Description |
|---|---|---|
| Box | 2 in. × 2 in. | A = 4.0 in.² |
| N | 56 lb | σ = 14 psi |
| Ring factor | 0.31 lb/div | |
| Readings | Dial 45 to 129 to 105 div over 0.12 in. | Vertical +0.001 to +0.010 in. |
The sand has a peak friction angle of 35.5°, softening to about 30° at large displacement.
For slopes and walls where the sand may already have moved (old slides, reworked fill), use the lower, ultimate value. Run at least three normal stresses spanning the field range before relying on the envelope; one test assumes c = 0.
Open the direct shear calculator →
Raw proving-ring readings for any number of tests reduced to stress-displacement curves, peak and ultimate stress and dilation, and the peak and ultimate envelopes.
Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.
Shales, mudstones and claystones that look sound when cut can break down within months of exposure to wetting and drying. In railroad cuts this produces raveling, undercutting of harder beds and rockfall onto the track; as fill or riprap such rock turns to clay. The slake durability test measures that resistance by tumbling oven-dried lumps in a mesh drum half immersed in water; the second-cycle index, Id2, is the standard reporting value.
Equation 5.2-14. Slake durability index
A = drum + oven-dry sample before the test; B, C = drum + oven-dry retained material after the first and second 10-minute cycles; D = empty drum. ASTM D4644 (withdrawn 2025); ISRM suggested method.
| First cycle Id1 (Franklin and Chandra, 1972) | Class | Second cycle Id2 (Gamble, 1971) | Class |
|---|---|---|---|
| 0–25% | Very low | 0–30% | Very low |
| 25–50% | Low | 30–60% | Low |
| 50–75% | Medium | 60–85% | Medium |
| 75–90% | High | 85–95% | Medium high |
| 90–95% | Very high | 95–98% | High |
| 95–100% | Extremely high | 98–100% | Very high |
Nagaraj (1993, Table 9.7) reprints the first-cycle classes with “high” and “very high” interchanged; the order above follows the original. Morgenstern and Eigenbrod (1974) also classify the amount of slaking by the liquid limit of the slaked material: very low below 20%, low 20 to 50%, medium 50 to 90%, high 90 to 140%, very high above 140%.
Ten lumps of gray shale from a cut on a Class I railroad located in Pennsylvania were tested to decide whether the face needs protection. The masses are illustrative of a typical laboratory result.
| Variable | Value | Description |
|---|---|---|
| D | 1,220.0 g | Empty drum |
| A | 1,715.0 g | Drum + oven-dry sample |
| B | 1,652.0 g | After cycle 1 |
| C | 1,571.0 g | After cycle 2 |
| LL | 38% | Slaked fines |
The shale has medium durability (Id2 = 71%): it will weather noticeably once exposed.
In the cut, expect the shale to ravel back and undercut any harder sandstone beds above it; plan for a catchment ditch sized for that debris (rock fall hazard rating, Section 3.8.29), consider shotcrete or drapery on the shale band, and do not use the excavated shale as riprap or rockfill.
Open the slake durability calculator →
First- and second-cycle slake durability indices with the Franklin and Chandra and Gamble classes, the fragment type and the slaking class by liquid limit.
Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.
Railroad projects need soil chemistry results mainly to judge corrosion of buried steel and concrete (soldier piles, H-piles, corrugated metal culverts, anchors, soil nails), sulfate attack and sulfate heave in treated soil (Chapter 2.12; Section 7.2.7), and contamination (Chapter 5.4). Chemistry results depend on how the test is run and on what happened to the sample between the hole and the laboratory far more than most geotechnical index tests do (Conklin 2014).
| Test | How it is measured | What to watch |
|---|---|---|
| pH | pH meter in a soil–water mix, commonly 1:1 by weight (for example 10 g soil and 10 mL distilled water) after standing about 10 minutes | Tests in a salt solution (KCl or CaCl2) release exchangeable acidity and read lower (more acidic) than water tests. Corrosivity criteria assume the method in the governing standard, so the report must state the method and ratio. Do not let the laboratory substitute its own procedure. |
| Redox potential (Eh) | Platinum and reference electrodes on a pH meter, reported in mV | Low Eh means reducing (oxygen-free) conditions, typical of saturated and organic soil; these favor sulfate-reducing bacteria and microbially influenced corrosion. Eh depends on pH, so report both. Exposure to air changes Eh quickly: measure in the field or on sealed, promptly tested samples. |
| Electrical conductivity (EC) | Conductivity cell on a saturated-paste extract or on a soil–water extract, in dS/m | EC rises with dissolved salts. Soils with pH below 8.5 and EC above 4 dS/m are saline; high sodium makes soils sodic, which disperses clay. Extract EC (1 dS/m corresponds to about 1,000 ohm-cm in the extract) is not the same as soil-box resistivity of the saturated soil, so do not interchange them. |
| Sulfate and chloride | Water extraction, then ion analysis | The extraction ratio and the drying temperature both change the result (see below). |
| Moisture state | Air-dry soil still holds about 1–2% water, more in organic soil | Results reported on an air-dry basis should state the residual water content. |
FHWA guidance for buried steel reinforcement and soil nails treats ground as aggressive when any of the following applies: pH below 5 or above 10; resistivity below 3,000 ohm-cm; chloride above 100 ppm; sulfate above 200 ppm; or organic content above 1%. Use the same screen for soldier piles, H-piles, culvert pipe and anchors, and apply the railroad’s own criteria where they are stricter. Sulfate also governs concrete exposure class and the risk of sulfate heave in lime- or cement-treated soil.
For railroad work: Take corrosivity samples from the borings at the depths of buried steel and below the water table, not only from the surface, and specify the test standards (for example, AASHTO T 288, T 289, T 290 and T 291, or ASTM G51 and G187) in the laboratory request. Seal and cool the samples, and ask for pH and redox to be run first. In saturated organic ground, cinders, or old fills beneath yards, measure redox and look for sulfides, because reducing conditions can make steel corrode quickly even when pH and resistivity look acceptable. Report the method, the extraction ratio and the drying temperature with every result so that later tests can be compared.
Source: Conklin (2014), Chapters 5–9; screening limits from FHWA corrosion guidance for MSE walls and soil nails. Full reference under Supplemental References.
Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
File locations for these documents are listed under Supplemental References.
Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S7 for railroad clients; tables are condensed from the book and its figures are not reproduced. The Case Studies section summarizes case studies from item S8 by Burt G. Look; its figures are reproduced from the book for internal reference use, and the closing “For railroad work” note in each case study is added by the authors of this manual.