Soft clay under embankment
Soft, compressible clay under new or widened embankment
Primary Reference: USACE EM 1110-1-1804, Geotechnical Investigations (January 2001); FHWA NHI-06-019 (superseded by GEC 13 Ground Modification Methods, FHWA-NHI-16-027 (2017)) "Ground Improvement Methods" (2006); Barron (1948); Priebe (1995); AREMA MRE Chapter 1 (Roadway and Ballast); Kirsch & Bell (2012) "Ground Improvement"; ASTM D698 (Standard Proctor); ASTM D1557 (Modified Proctor).
Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database
Compaction and consolidation values for ground improvement design. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Maximum dry unit weight | Gravel–sand, well graded, clean | GW | AASHTO T 99 | 127.3 | 132.1 | 136.9 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Gravel–sand, well graded, clean | GW | AASHTO T 99 | 8 | 9.5 | 11 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Gravel–sand, poorly graded, clean | GP | AASHTO T 99 | 117.8 | 122.5 | 127.3 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Gravel–sand, poorly graded, clean | GP | AASHTO T 99 | 11 | 12.5 | 14 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Gravel–sand, well graded, small silt content | GM | AASHTO T 99 | 121 | 128.9 | 136.9 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Gravel–sand, well graded, small silt content | GM | AASHTO T 99 | 8 | 10 | 12 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Gravel–sand, well graded, small clay content | GC | AASHTO T 99 | 117.8 | 122.5 | 127.3 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Gravel–sand, well graded, small clay content | GC | AASHTO T 99 | 9 | 11.5 | 14 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Sand, well graded, clean | SW | AASHTO T 99 | 111.4 | 122.5 | 133.7 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Sand, well graded, clean | SW | AASHTO T 99 | 9 | 12.5 | 16 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Sand, poorly graded, small silt content | SP | AASHTO T 99 | 101.9 | 111.5 | 121 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Sand, poorly graded, small silt content | SP | AASHTO T 99 | 12 | 16.5 | 21 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Sand, well graded, small silt content | SM | AASHTO T 99 | 111.4 | 119.3 | 127.3 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Sand, well graded, small silt content | SM | AASHTO T 99 | 11 | 13.5 | 16 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Sand, well graded, small clay content | SC | AASHTO T 99 | 108.2 | 117.8 | 127.3 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Sand, well graded, small clay content | SC | AASHTO T 99 | 11 | 15 | 19 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Silts, low plasticity | ML | AASHTO T 99 | 95.5 | 108.2 | 121 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Silts, low plasticity | ML | AASHTO T 99 | 12 | 18 | 24 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Clays, low plasticity | CL | AASHTO T 99 | 95.5 | 108.2 | 121 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Clays, low plasticity | CL | AASHTO T 99 | 12 | 18 | 24 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Organic silts, low plasticity | OL | AASHTO T 99 | 82.8 | 92.3 | 101.9 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Organic silts, low plasticity | OL | AASHTO T 99 | 21 | 26.5 | 32 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Silts, high plasticity | MH | AASHTO T 99 | 70 | 82.8 | 95.5 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Silts, high plasticity | MH | AASHTO T 99 | 24 | 32 | 40 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Clays, high plasticity | CH | AASHTO T 99 | 82.8 | 95.5 | 108.2 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Clays, high plasticity | CH | AASHTO T 99 | 19 | 27.5 | 36 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Organic silts/clays, high plasticity | OH | AASHTO T 99 | 66.8 | 84.3 | 101.9 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Organic silts/clays, high plasticity | OH | AASHTO T 99 | 21 | 33 | 45 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Well-graded gravel–sand mixtures | A-1 | AASHTO T 99 | 117.8 | 127.3 | 136.9 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Well-graded gravel–sand mixtures | A-1 | AASHTO T 99 | 5 | 10 | 15 | % | CB T3.3, p.81 |
| Maximum dry unit weight | Silty or clayey gravel and sand | A-2 | AASHTO T 99 | 111.4 | 124.2 | 136.9 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Silty or clayey gravel and sand | A-2 | AASHTO T 99 | 9 | 13.5 | 18 | % | CB T3.3, p.81 |
| Maximum dry unit weight | Poorly graded sands | A-3 | AASHTO T 99 | 101.9 | 111.5 | 121 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Poorly graded sands | A-3 | AASHTO T 99 | 5 | 8.5 | 12 | % | CB T3.3, p.81 |
| Maximum dry unit weight | Silty sands and gravels of low plasticity | A-4 | AASHTO T 99 | 95.5 | 111.4 | 127.3 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Silty sands and gravels of low plasticity | A-4 | AASHTO T 99 | 10 | 15 | 20 | % | CB T3.3, p.81 |
| Maximum dry unit weight | Elastic silts, diatomaceous or micaceous | A-5 | AASHTO T 99 | 85.9 | 93.9 | 101.9 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Elastic silts, diatomaceous or micaceous | A-5 | AASHTO T 99 | 20 | 27.5 | 35 | % | CB T3.3, p.81 |
| Maximum dry unit weight | Plastic clay, sandy clay | A-6 | AASHTO T 99 | 95.5 | 108.2 | 121 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Plastic clay, sandy clay | A-6 | AASHTO T 99 | 10 | 20 | 30 | % | CB T3.3, p.81 |
| Maximum dry unit weight | Highly plastic or elastic clay | A-7 | AASHTO T 99 | 82.8 | 100.3 | 117.8 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Highly plastic or elastic clay | A-7 | AASHTO T 99 | 15 | 25 | 35 | % | CB T3.3, p.81 |
| Maximum dry unit weight (ASTM D698) | Well graded clean gravels | GW | UFC 3-220-20 Table 3-1 | 125 | 130 | 135 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Well graded clean gravels | GW | UFC 3-220-20 Table 3-1 | 8 | 9.5 | 11 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Well graded clean gravels | GW | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁴ | 3.0×10⁻³ | 3.0×10⁻² | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Poorly graded clean gravels | GP | UFC 3-220-20 Table 3-1 | 115 | 120 | 125 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Poorly graded clean gravels | GP | UFC 3-220-20 Table 3-1 | 11 | 12.5 | 14 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Poorly graded clean gravels | GP | UFC 3-220-20 Table 3-1 | 3.0×10⁻³ | 3.0×10⁻² | 3.0×10⁻¹ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Silty gravels | GM | UFC 3-220-20 Table 3-1 | 120 | 127.5 | 135 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Silty gravels | GM | UFC 3-220-20 Table 3-1 | 8 | 10 | 12 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Silty gravels | GM | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁶ | 3.0×10⁻⁵ | 3.0×10⁻⁴ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Clayey gravels | GC | UFC 3-220-20 Table 3-1 | 115 | 122.5 | 130 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Clayey gravels | GC | UFC 3-220-20 Table 3-1 | 9 | 11.5 | 14 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Clayey gravels | GC | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁷ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Well graded clean sands | SW | UFC 3-220-20 Table 3-1 | 110 | 120 | 130 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Well graded clean sands | SW | UFC 3-220-20 Table 3-1 | 9 | 12.5 | 16 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Well graded clean sands | SW | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁴ | 3.0×10⁻³ | 3.0×10⁻² | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Poorly graded clean sands | SP | UFC 3-220-20 Table 3-1 | 100 | 110 | 120 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Poorly graded clean sands | SP | UFC 3-220-20 Table 3-1 | 12 | 16.5 | 21 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Poorly graded clean sands | SP | UFC 3-220-20 Table 3-1 | 3.0×10⁻³ | 3.0×10⁻² | 3.0×10⁻¹ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Silty sands | SM | UFC 3-220-20 Table 3-1 | 110 | 117.5 | 125 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Silty sands | SM | UFC 3-220-20 Table 3-1 | 11 | 13.5 | 16 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Silty sands | SM | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁶ | 3.0×10⁻⁵ | 3.0×10⁻⁴ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Sand-silt-clay, slightly plastic fines | SM-SC | UFC 3-220-20 Table 3-1 | 110 | 120 | 130 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Sand-silt-clay, slightly plastic fines | SM-SC | UFC 3-220-20 Table 3-1 | 11 | 13 | 15 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Sand-silt-clay, slightly plastic fines | SM-SC | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | 3.0×10⁻⁷ | 3.0×10⁻⁶ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Clayey sands | SC | UFC 3-220-20 Table 3-1 | 105 | 115 | 125 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Clayey sands | SC | UFC 3-220-20 Table 3-1 | 11 | 15 | 19 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Clayey sands | SC | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁷ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Inorganic silts and clayey silts | ML | UFC 3-220-20 Table 3-1 | 95 | 107.5 | 120 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Inorganic silts and clayey silts | ML | UFC 3-220-20 Table 3-1 | 12 | 18 | 24 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Inorganic silts and clayey silts | ML | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | 3.0×10⁻⁷ | 3.0×10⁻⁶ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Silt-clay mixture | CL-ML | UFC 3-220-20 Table 3-1 | 100 | 110 | 120 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Silt-clay mixture | CL-ML | UFC 3-220-20 Table 3-1 | 12 | 17 | 22 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Silt-clay mixture | CL-ML | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Lean clay | CL | UFC 3-220-20 Table 3-1 | 95 | 107.5 | 120 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Lean clay | CL | UFC 3-220-20 Table 3-1 | 12 | 18 | 24 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Lean clay | CL | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Organic silts, low plasticity | OL | UFC 3-220-20 Table 3-1 | 80 | 90 | 100 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Organic silts, low plasticity | OL | UFC 3-220-20 Table 3-1 | 21 | 27 | 33 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Organic silts, low plasticity | OL | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Elastic silts | MH | UFC 3-220-20 Table 3-1 | 70 | 82.5 | 95 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Elastic silts | MH | UFC 3-220-20 Table 3-1 | 24 | 32 | 40 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Elastic silts | MH | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁹ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Fat clay | CH | UFC 3-220-20 Table 3-1 | 75 | 90 | 105 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Fat clay | CH | UFC 3-220-20 Table 3-1 | 19 | 27.5 | 36 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Fat clay | CH | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁹ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Organic clays | OH | UFC 3-220-20 Table 3-1 | 65 | 82.5 | 100 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Organic clays | OH | UFC 3-220-20 Table 3-1 | 12 | 28.5 | 45 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Organic clays | OH | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁹ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum compacted layer thickness by roller type | Rock fill | Towed vibratory 6 t | 30 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Towed vibratory 6 t | 24 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Towed vibratory 6 t | 18 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Towed vibratory 6 t | 10 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Towed vibratory 6 t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement base | Towed vibratory 6 t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Rock fill | Towed vibratory 10 t | 59 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Towed vibratory 10 t | 39 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Towed vibratory 10 t | 28 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Towed vibratory 10 t | 14 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Towed vibratory 10 t | 24 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement base | Towed vibratory 10 t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Rock fill | Towed vibratory 15 t | 79 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Towed vibratory 15 t | 59 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Towed vibratory 15 t | 39 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Towed vibratory 15 t | 20 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Towed vibratory 15 t | 31 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Towed padfoot 6 t | 24 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Towed padfoot 6 t | 18 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Towed padfoot 6 t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Towed padfoot 6 t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Towed padfoot 10 t | 39 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Towed padfoot 10 t | 28 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Towed padfoot 10 t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Towed padfoot 10 t | 24 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Self-propelled vibratory 7 (3) t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled vibratory 7 (3) t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled vibratory 7 (3) t | 6 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Self-propelled vibratory 7 (3) t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement base | Self-propelled vibratory 7 (3) t | 10 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Rock fill | Self-propelled vibratory 10 (5) t | 30 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Self-propelled vibratory 10 (5) t | 20 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled vibratory 10 (5) t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled vibratory 10 (5) t | 8 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Self-propelled vibratory 10 (5) t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement base | Self-propelled vibratory 10 (5) t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Rock fill | Self-propelled vibratory 15 (10) t | 59 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Self-propelled vibratory 15 (10) t | 39 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled vibratory 15 (10) t | 28 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled vibratory 15 (10) t | 14 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Self-propelled vibratory 15 (10) t | 24 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement base | Self-propelled vibratory 15 (10) t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Self-propelled vibratory 8 (4) t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled vibratory 8 (4) t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled vibratory 8 (4) t | 8 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Self-propelled vibratory 8 (4) t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Self-propelled padfoot 11 (7) t | 24 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled padfoot 11 (7) t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled padfoot 11 (7) t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Self-propelled padfoot 11 (7) t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Self-propelled padfoot 15 (10) t | 39 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled padfoot 15 (10) t | 28 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled padfoot 15 (10) t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Self-propelled padfoot 15 (10) t | 24 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Vibratory tandem 2 t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Vibratory tandem 2 t | 8 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Vibratory tandem 2 t | 4 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Vibratory tandem 2 t | 8 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement base | Vibratory tandem 2 t | 6 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Vibratory tandem 7 t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Vibratory tandem 7 t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Vibratory tandem 7 t | 6 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Vibratory tandem 7 t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement base | Vibratory tandem 7 t | 10 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Vibratory tandem 10 t | 20 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Vibratory tandem 10 t | 14 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Vibratory tandem 10 t | 8 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Vibratory tandem 10 t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement base | Vibratory tandem 10 t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Vibratory tandem 13 t | 24 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Vibratory tandem 13 t | 18 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Vibratory tandem 13 t | 10 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Vibratory tandem 13 t | 18 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement base | Vibratory tandem 13 t | 14 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Sand and gravel | Padfoot tandem 18 t | 35 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Padfoot tandem 18 t | 28 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Padfoot tandem 18 t | 24 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Pavement subbase | Padfoot tandem 18 t | 24 | in | LOOK23 T7.8, p.223 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Coefficient of consolidation | Low plasticity clays | CL | 32.29 | 118.4 | 204.5 | ft²/yr | CB T5.3, p.114 | |
| Coefficient of consolidation | Low plasticity glacial lake clays | CL | 21.53 | 26.9 | 32.29 | ft²/yr | CB T5.3, p.114 | |
| Coefficient of consolidation | Low plasticity mud | CL | 6.46 | 9.7 | 12.92 | ft²/yr | CB T5.3, p.114 | |
| Coefficient of consolidation | Medium plasticity clays | CL-CH | 9.69 | ft²/yr | CB T5.3, p.114 | |||
| Coefficient of consolidation | Volcanic silt | MH | 3.23 | 4.305 | 5.38 | ft²/yr | CB T5.3, p.114 | |
| Coefficient of consolidation | Organic silt | OL | 6.46 | 19.4 | 32.29 | ft²/yr | CB T5.3, p.114 | |
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 30% | ML-CH | Undisturbed – virgin compression | 1,292 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 40% | ML-CH | Undisturbed – virgin compression | 538.2 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 50% | ML-CH | Undisturbed – virgin compression | 215.3 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 60% | ML-CH | Undisturbed – virgin compression | 107.6 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 70% | ML-CH | Undisturbed – virgin compression | 53.82 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 80% | ML-CH | Undisturbed – virgin compression | 32.29 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 90% | ML-CH | Undisturbed – virgin compression | 16.15 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 100% | ML-CH | Undisturbed – virgin compression | 10.76 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 110% | ML-CH | Undisturbed – virgin compression | 9.69 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 30% | ML-CH | Undisturbed – recompression | 215.3 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 40% | ML-CH | Undisturbed – recompression | 107.6 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 50% | ML-CH | Undisturbed – recompression | 53.82 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 60% | ML-CH | Undisturbed – recompression | 32.29 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 70% | ML-CH | Undisturbed – recompression | 21.53 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 80% | ML-CH | Undisturbed – recompression | 10.76 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 90% | ML-CH | Undisturbed – recompression | 8.61 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 100% | ML-CH | Undisturbed – recompression | 6.46 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 110% | ML-CH | Undisturbed – recompression | 5.38 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 30% | ML-CH | Remolded | 43.06 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 40% | ML-CH | Remolded | 21.53 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 50% | ML-CH | Remolded | 16.15 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 60% | ML-CH | Remolded | 10.76 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 70% | ML-CH | Remolded | 6.46 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 80% | ML-CH | Remolded | 4.31 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 90% | ML-CH | Remolded | 3.77 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 100% | ML-CH | Remolded | 3.23 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 110% | ML-CH | Remolded | 2.69 | ft²/yr | LOOK T8.14, p.122 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Cosmetic damage guide value, peak particle velocity | Reinforced or framed structures; industrial and heavy commercial | 4 Hz and above | 1.97 | in/s | FGE T20.3, p.307 | |||
| Cosmetic damage guide value, peak particle velocity | Unreinforced or light framed; residential and light commercial | 4 Hz rising to 15 Hz | 0.59 | 0.69 | 0.79 | in/s | FGE T20.3, p.307 | |
| Cosmetic damage guide value, peak particle velocity | Unreinforced or light framed; residential and light commercial | 15 Hz rising to 40 Hz and above | 0.79 | 1.38 | 1.97 | in/s | FGE T20.3, p.307 | |
| Maximum zero-to-peak displacement below 4 Hz | Unreinforced or light framed; residential and light commercial | Below 4 Hz | 0.024 | in | FGE T20.3, p.307 | |||
| Human perception threshold, peak particle velocity | People indoors | Blast or construction vibration | 0.02 | in/s | FGE text, p.529 | |||
| Damage potential threshold, peak particle velocity – transient sources | Extremely fragile historic buildings, ruins, ancient monuments | Blasting, drop balls | 0.12 | in/s | CALTRANS T19, p.27 | |||
| Damage potential threshold, peak particle velocity – continuous or frequent sources | Extremely fragile historic buildings, ruins, ancient monuments | Impact and vibratory pile driving, vibratory compaction | 0.08 | in/s | CALTRANS T19, p.27 | |||
| Damage potential threshold, peak particle velocity – transient sources | Fragile buildings | Blasting, drop balls | 0.2 | in/s | CALTRANS T19, p.27 | |||
| Damage potential threshold, peak particle velocity – continuous or frequent sources | Fragile buildings | Impact and vibratory pile driving, vibratory compaction | 0.1 | in/s | CALTRANS T19, p.27 | |||
| Damage potential threshold, peak particle velocity – transient sources | Historic and some old buildings | Blasting, drop balls | 0.5 | in/s | CALTRANS T19, p.27 | |||
| Damage potential threshold, peak particle velocity – continuous or frequent sources | Historic and some old buildings | Impact and vibratory pile driving, vibratory compaction | 0.25 | in/s | CALTRANS T19, p.27 | |||
| Damage potential threshold, peak particle velocity – transient sources | Older residential structures | Blasting, drop balls | 0.5 | in/s | CALTRANS T19, p.27 | |||
| Damage potential threshold, peak particle velocity – continuous or frequent sources | Older residential structures | Impact and vibratory pile driving, vibratory compaction | 0.3 | in/s | CALTRANS T19, p.27 | |||
| Damage potential threshold, peak particle velocity – transient sources | New residential structures | Blasting, drop balls | 1 | in/s | CALTRANS T19, p.27 | |||
| Damage potential threshold, peak particle velocity – continuous or frequent sources | New residential structures | Impact and vibratory pile driving, vibratory compaction | 0.5 | in/s | CALTRANS T19, p.27 | |||
| Damage potential threshold, peak particle velocity – transient sources | Modern industrial/commercial buildings | Blasting, drop balls | 2 | in/s | CALTRANS T19, p.27 | |||
| Damage potential threshold, peak particle velocity – continuous or frequent sources | Modern industrial/commercial buildings | Impact and vibratory pile driving, vibratory compaction | 0.5 | in/s | CALTRANS T19, p.27 | |||
| Human annoyance potential, peak particle velocity – transient sources | Barely perceptible | 0.04 | in/s | CALTRANS T20, p.27 | ||||
| Human annoyance potential, peak particle velocity – continuous or frequent sources | Barely perceptible | 0.01 | in/s | CALTRANS T20, p.27 | ||||
| Human annoyance potential, peak particle velocity – transient sources | Distinctly perceptible | 0.25 | in/s | CALTRANS T20, p.27 | ||||
| Human annoyance potential, peak particle velocity – continuous or frequent sources | Distinctly perceptible | 0.04 | in/s | CALTRANS T20, p.27 | ||||
| Human annoyance potential, peak particle velocity – transient sources | Strongly perceptible | 0.9 | in/s | CALTRANS T20, p.27 | ||||
| Human annoyance potential, peak particle velocity – continuous or frequent sources | Strongly perceptible | 0.1 | in/s | CALTRANS T20, p.27 | ||||
| Human annoyance potential, peak particle velocity – transient sources | Severe | 2 | in/s | CALTRANS T20, p.27 | ||||
| Human annoyance potential, peak particle velocity – continuous or frequent sources | Severe | 0.4 | in/s | CALTRANS T20, p.27 | ||||
| Vibration attenuation exponent n | Soil class I – Weak or soft soils (loose, peat, organic, topsoil) | Suggested value | 1.4 | – | CALTRANS T17, p.22 | |||
| Vibration attenuation exponent n | Soil class II – Competent soils (most sands, sandy and silty clays, gravel, weathered rock) | Suggested value | 1.3 | – | CALTRANS T17, p.22 | |||
| Vibration attenuation exponent n | Soil class III – Hard soils (dense compacted sand, glacial till, some rock) | Suggested value | 1.1 | – | CALTRANS T17, p.22 | |||
| Vibration attenuation exponent n | Soil class IV – Hard, competent rock | Suggested value | 1 | – | CALTRANS T17, p.22 | |||
| Blast vibration PPV threshold effect | Perceptible to humans | Blasting | 0.12 | 0.16 | 0.2 | in/s | WYLLIE T11.6, p.267 | |
| Blast vibration PPV threshold effect | Approximate limit for poorly constructed and historic buildings | Blasting | 0.39 | in/s | WYLLIE T11.6, p.267 | |||
| Blast vibration PPV threshold effect | Objectionable to humans | Blasting | 1.3 | 1.65 | 2 | in/s | WYLLIE T11.6, p.267 | |
| Blast vibration PPV threshold effect | Risk of structural damage very slight (< 5%) | Blasting | 2 | in/s | WYLLIE T11.6, p.267 | |||
| Blast vibration PPV threshold effect | Minor damage, plaster cracking, serious complaints | Blasting | 4.9 | in/s | WYLLIE T11.6, p.267 | |||
| Blast vibration PPV threshold effect | Cracks in concrete blocks | Blasting | 9.1 | in/s | WYLLIE T11.6, p.267 | |||
| Allowable PPV in fresh mass concrete vs age (× distance factor) | Mass concrete | 0–4 hours | 4 | in/s | WYLLIE T11.7, p.268 | |||
| Allowable PPV in fresh mass concrete vs age (× distance factor) | Mass concrete | 4 hours to 1 day | 6 | in/s | WYLLIE T11.7, p.268 | |||
| Allowable PPV in fresh mass concrete vs age (× distance factor) | Mass concrete | 1–3 days | 9 | in/s | WYLLIE T11.7, p.268 | |||
| Allowable PPV in fresh mass concrete vs age (× distance factor) | Mass concrete | 3–7 days | 12 | in/s | WYLLIE T11.7, p.268 | |||
| Allowable PPV in fresh mass concrete vs age (× distance factor) | Mass concrete | 7–10 days | 15 | in/s | WYLLIE T11.7, p.268 | |||
| Allowable PPV in fresh mass concrete vs age (× distance factor) | Mass concrete | More than 10 days | 20 | in/s | WYLLIE T11.7, p.268 | |||
| Blast attenuation constant k (PPV = k (R/√W)^β) | Average | R in ft, W in lb per delay; β ≈ −1.6 | 160 | in/s | WYLLIE Fig. 11.18, p.265 | |||
| Blast attenuation constant k (PPV = k (R/√W)^β) | Typical upper bound (90%) | R in ft, W in lb per delay; β ≈ −1.6 | 242 | in/s | WYLLIE Fig. 11.18, p.265 | |||
| Blast attenuation constant k (PPV = k (R/√W)^β) | High confinement, coupling and rock strength (99%) | R in ft, W in lb per delay; β ≈ −1.6 | 605 | in/s | WYLLIE Fig. 11.18, p.265 | |||
| Recommended minimum distance from vibrating roller to nearest building | Roller class I Small | < 1.25 t (maintenance) | 10 ft; not restricted on roads | ft | LOOK23 T7.7, p.222 | |||
| Recommended minimum distance from vibrating roller to nearest building | Roller class II Light | 1–2 t | 16 ft; not restricted on roads | ft | LOOK23 T7.7, p.222 | |||
| Recommended minimum distance from vibrating roller to nearest building | Roller class III Light–medium | 2–4 t | 16–33 ft | ft | LOOK23 T7.7, p.222 | |||
| Recommended minimum distance from vibrating roller to nearest building | Roller class IV Medium | 4–6 t | 33–66 ft; not advised on city and suburban streets | ft | LOOK23 T7.7, p.222 | |||
| Recommended minimum distance from vibrating roller to nearest building | Roller class V Heavy | 7–11 t | 66–130 ft; not advised in built-up areas | ft | LOOK23 T7.7, p.222 | |||
| Recommended minimum distance from vibrating roller to nearest building | Roller class VI Very heavy | > 12 t | Rural areas away from structures only | ft | LOOK23 T7.7, p.222 |
Full database · Laboratory tests · Download Excel · Library documents for this chapter · Calculators for this chapter
Ground improvement is a fundamental tool in the railroad geotechnical consultant's toolkit, employed when in-situ subgrade conditions cannot support track, structure, or facility loads without unacceptable settlement, slope instability, or bearing capacity failure. Railroad projects present a concentrated set of ground improvement challenges: soft coastal and alluvial clays crossed by Class I railroad mainlines, expansive Prairie clays along Class I railroad corridors, loose liquefiable sands requiring treatment for Class I railroad facilities, and organic deposits that underlie historic rail alignments across multiple clients.
This chapter presents methods for: (1) densification by compaction — mechanical, dynamic, and vibratory; (2) consolidation acceleration using prefabricated vertical drains (PVDs) with staged embankment loading; (3) stone column reinforcement with the Priebe method for composite stiffness; (4) deep soil mixing (DSM) for soft clay improvement and liquefaction mitigation; (5) grouting — permeation, compaction, and jet grouting; (6) lime and cement stabilization; and (7) geosynthetic reinforcement for embankment and subgrade applications. All equations are in English units.
The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.
| ID | Correlation | Gives |
|---|---|---|
| IS-14 | Undrained shear strength from CPT | Sᵤ |
| IS-17 | Preconsolidation stress / OCR from CPT | σ'ₚ, OCR |
| IS-20 | Hydraulic conductivity from CPT | k |
| IS-03 | Relative density of sand from SPT | Dᵣ |
| IS-16 | Relative density of sand from CPT | Dᵣ |
| IS-19 | Constrained modulus from CPT | M |
| IX-11 | Hazen hydraulic conductivity | k |
Railroad ground improvement projects carry constraints not present in highway or building construction:

| Railroad | Preferred Methods | Prohibited/Restricted Methods | Governing Standard |
|---|---|---|---|
| AREMA | All methods per site conditions | Per owner approval | AREMA MRE Chapter 1 |
Owner railroads may set different values. Confirm them against the owner railroad's current standards when the work is scoped.
Many old lines were built without a formation layer. When speed or axle load is raised, the simplest fix is to thicken the track bed during maintenance, but clearance limits or stress targets often rule that out, and the formation layer itself must be improved or installed. The UIC methods compiled by Profillidis differ mainly in possession time, excavation depth and output:
| Method | Excavation below top of rail | Speed on improved track (mph) | Track removed? | Output (ft/h) |
|---|---|---|---|---|
| Earthmoving machinery, short sections (< 330 ft) | 4 ft | 25–50 | Yes | 500 |
| Earthmoving machinery, longer sections (> 330 ft) | 4 ft | 43–62 | Yes | 500 |
| Track-laying machinery | 4 ft | 43–62 | No (yes with geotextile) | 66–130 |
| Ballast screening machine | 33 in. | 25–37 | No | 295 |
| PUSCAL II formation-improvement machine | 4.6 ft | 31–50 | Yes | 59 |
| PM 200 formation-improvement machine | 3.6 ft | 43 | No | 115–150 |
| Thermal insulation sheets laid by ballast screener SPX | 33 in. | 25 | No | 330 |

Excavating deeper than 4 ft makes the stability of the adjacent track critical. Full table, with possession hours and man-hours, in Figure 7.2-11.

Formation rehabilitation machines insert a new sand–gravel formation layer at the top of the subgrade without removing the track. They are the substructure equivalent of ballast cleaning, for sites where subgrade bearing capacity, not ballast condition, is the problem.
After Profillidis (2014), §9.7.2, §16.8, Table 9.4; after UIC Code 722R. Full reference under Supplemental References.
Subgrade stabilization follows the same logic as slope work. Rehabilitate drainage first, then reinforce the substructure below the ballast and the track structure above it, and improve the ground itself where the problem runs deep.
| Category | Examples | Indicative cost (2016 $) |
|---|---|---|
| Improve structure above track | Eliminate joints, heavier rail, swamp ties | Swamp ties ~$670,000/mile [2012: ~$600,000] |
| Improve substructure below ballast | Undercutting / ballast replacement, geogrid, HMA underlayment | Undercutting ~$280,000/mile [2012: ~$250,000] |
| Improve subgrade strength | Shear key, cross trench, cement or grout injection, remove and replace | Site-specific |
| Underpinning | Micropiles, screw piles | Site-specific |
| (Reference) new construction | ~$6,700,000/mile [2012: ~$6,000,000] |
Cost basis: The course figures were in 2012 dollars. They are escalated here to 2016 dollars with the ENR Construction Cost Index (20-city annual average): 10,338 (2016) ÷ 9,308 (2012) = 1.111, an increase of about 11%. Values are rounded; 2012 values are shown in brackets. To move to another year, multiply the 2012 value by CCIyear ÷ 9,308. Railroad work (track time, work trains, flagging, remote access) can vary by far more than the index change, so treat these as order-of-magnitude figures.
After Geotechnology for Railroaders Program, Module 6.2; §01. Full reference under Supplemental References.
Selig and Waters group the options for existing track into four families:
Notes on the in-place methods.
After Selig & Waters (1994), ch. 11. Full reference under Supplemental References.
Sears et al. separate two decisions that are often blurred together: how the project is delivered and how the contractor is paid.
Delivery methods.
Pricing bases.
Selection. The authors also describe best-value selection, which scores price together with qualifications, as increasingly accepted.
For railroad work: Ground improvement is where these choices matter most, because the quantity of ground treated is uncertain and the result is a performance outcome rather than a quantity. Practical pairings to consider:
Whatever the method, the GSPs and the geotechnical report should state which party carries quantity risk and which carries performance risk.
Source: Sears, S. K., Sears, G. A., Clough, R. H., Rounds, J. L., and Segner, R. O., Jr. (2015). Construction Project Management: A Practical Guide to Field Construction Management, 6th ed. Hoboken, NJ: John Wiley & Sons, pp. 6–13. Summarized and paraphrased. Full reference under Supplemental References.
The relationship between dry unit weight and moisture content is defined by the Proctor test. The maximum dry unit weight γ_d,max and optimum moisture content w_opt are the design targets for compaction control (Chapter 5.3).




Zero Air Voids (ZAV) line:
Where G_s = specific gravity (≈ 2.70 for most soils); γ_w = 62.4 pcf; w = water content (decimal).
Relative compaction (RC):
Standard Proctor (ASTM D698): 12,400 ft·lb/ft³ compactive effort; appropriate for light to moderate railroad facility construction. Modified Proctor (ASTM D1557): 56,000 ft·lb/ft³ compactive effort; commonly specified for intermodal yards, bridge approach fills and railroad embankments.

| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Gs | specific gravity (≈ 2.70 for most soils) | Lab test | Specific gravity of solids (ASTM D854). 2.65–2.70 is usually adequate for mineral soils when untested. | 2.64–2.80 mineral; lower if organic · by USCS group |
| w | water content (decimal). | Lab test | Oven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938). | gravels/sands 3–25%, clays 15–70% · by USCS group |
Vibratory compaction (smooth drum, padfoot) densifies granular fills and coarse-grained subgrades. Compaction effectiveness is described by the influence depth Z_eff:

Where W = drum weight (lb); A_f = drum contact area (ft²); k = empirical constant (0.08–0.12 for granular materials).
Lift thickness limits by soil type:
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| W | drum weight (lb) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| Af | drum contact area (ft²) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| k | empirical constant (0.08–0.12 for granular materials). | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
Dynamic compaction densifies loose fills and granular soils by repeated high-energy drops of a heavy pounder (10,000–30,000 lb) from heights of 30–90 ft.


Influence depth (Menard & Broise 1975):
Where (metric, as published; multiply D by 3.28 for feet):
Energy per unit area:
For railroad applications, dynamic compaction is restricted to areas beyond client setback from active track (Table 7.2-1). Vibration monitoring (Chapter 5.3) with a peak particle velocity (PPV) threshold of 0.5 in./s at the nearest track is commonly required.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Wh | weight of pounder (tons) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| H | drop height (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| n | empirical efficiency factor (0.35–0.65 | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
Table 17-S2. Upper-bound test values after deep dynamic compaction (GEC 13, Table 4-2, from FHWA 1986)
| Soil type | SPT N (blows/ft) | CPT qc (tsf) | PMT limit pressure (tsf) |
|---|---|---|---|
| Pervious coarse-grained: sands and gravel | 30–50 | 200–300 | 20–25 |
| Semipervious: sandy silts | 25–35 | 135–177 | 14.6–20 |
| Semipervious: silts and clayey silts | 20–35 | 104–135 | 10.4–14.6 |
| Partially saturated impervious: clay fill, mine spoil | 20–40* | N/A | 14.6–20 |
| Landfills | 15–40* | N/A | 5.2–10.4 |
* Higher values may reflect large particles. These are maxima for estimating what is possible; verify actual improvement by testing while the equipment is still on site, and allow for delayed improvement as pore pressures dissipate.
Rapid impact compaction (RIC) is a smaller-footprint alternative where the setbacks in Table 7.2-1 rule out a crane and pounder. A 5–9 ton weight on an excavator drops about 4 ft onto a 5-ft-diameter tamper at 40–60 blows/min. It densifies granular fills, ash and building waste to about 10–20+ ft and covers about 9,000–30,000 ft2 per shift. Groundwater should be at least 3 ft below the surface. It is not recommended for weak, low-permeability, clayey or high-fines soils. Energy and set per blow are recorded for QC, with SPT or CPT before and after for QA. Recorded peak noise was about 88 dBA. The depth of compaction cannot be controlled precisely.





Jet grouting diameters reported by SHRP2 range from about 3 to 15 ft (larger than the 1.5–5 ft in Section 7.2.6.3, which reflects smaller systems). Depths are generally under 100 ft but exceed 160 ft in some cases. Soilcrete strength reflects the soil (higher in sands and gravels). Highly plastic clays and fibrous peat erode poorly and are not recommended. Spoil must be removed continuously, and surface or lateral movement must be watched — an important check beneath or next to track.
Source: Schaefer, V. R. et al. (2017). Ground Modification Methods Reference Manual, Vol. I. Geotechnical Engineering Circular No. 13, FHWA-NHI-16-027 · SHRP2 R02 / GeoTechTools (2012). Rapid Impact Compaction and Jet Grouting fact sheets
Technology sheets for this method · see 7.2.16 Technology Library





Case study: 7.2.17.1 Measuring roller force with pile-driving monitors (Look 2023), in §17.17 Case Studies.










UK earthworks specifications control compaction in two ways. A method specification fixes the plant, layer thickness and number of passes for each material class, with daily records of what was done. An end-product specification sets a minimum compacted state that is tested in place; a layer should not be covered until it has been shown to comply (Dumelow, 2012, Section 75.5, pp. 1119–1133). AREMA and most railroad specifications are end-product (percent of maximum dry density at a moisture range), so the testing frequency and the hold on covering a layer are what make them work.
| Test | Time | Typical acceptable limit | Constraint |
|---|---|---|---|
| Moisture Condition Value (MCV) | About 15 min | 8 to 16 | Must be correlated with fundamental tests for each material; weak for granular or very silty or sandy soils |
| Hand shear vane | About 1 min | Over about 1,460 psf (70 kPa) | Not suitable for clay with much sand or gravel |
Dumelow (2012), p. 1133. Shear strength converted from kPa.
Bender-element tests on a clayey soil treated with 3% lime and compacted to a dry density of about 100 pcf (1.60 Mg/m³) found (Tang, Vu and Cui, 2011, pp. 35–44):
For lime-treated subgrade and fill, specify pulverisation (Section 7.2.7), prepare laboratory mixes at the field clod size, and protect the treated layer from drying out before it is covered.
Paraphrased from the published sources below; values are converted to English units. Individual railroads, clients and projects are not named.
A building pad in mountainous terrain sat on 6.5 to 26 ft of weathered rock and soil that had been end-dumped without compaction two years earlier. Most particles were 0.2 to 8 in., with some over 20 in., and the fill carried only about 1,500 to 2,100 psf. Treatment used two high-energy passes of about 2,200 kip-ft per drop, followed by two lighter ironing passes of about 1,100 and 740 kip-ft.
For railroad work: Old side-cast and end-dumped fills of rock and soil are common along mountain grades and at abandoned yards. The case shows that coarse, boulder-bearing fill can be brought to a reliable bearing surface by dynamic compaction where vibration limits allow it, and that GPR is a practical way to confirm the depth of improvement. Keep the vibration limits of Section 7.2.2.3 for any work near live track, signals and structures.
Source: Lu, Filz and Han (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Explosives are best known in ground improvement for densifying loose saturated sand (see the blasting densification sheet in Section 7.2.16). This paper describes a different use: explosive replacement. Crushed stone is stockpiled beside the area to be treated, charges are set in the soft clay in a planned pattern, and the blast opens cavities into which the stockpile slides. Charge weight and spacing were set from blast-cavity equations.
For railroad work: Explosive replacement is a remote-site option for building a new alignment across a shallow soft clay or organic deposit where excavation and replacement would be slow. It is not suited near operating track or structures. Expect incomplete replacement at the base of the deposit and verify with borings and GPR.
Source: Yan, Dong and Chu (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Dynamic replacement uses heavy tamping to drive large pillars of imported granular material into soft saturated soil. The craters are filled with stone or sand and pounded again, forming columns that both reinforce the soil and drain it. The soil between the pillars is compressed, and the excess pore pressure this creates takes hours to dissipate, so passes are spaced in time. Rotational dynamic compaction drops a tamper that also rotates as it falls; in comparative trials it penetrated about twice as far as a conventional tamper and gave higher cone resistance, increasing the depth of improvement in granular soils.
For railroad work: Both methods produce strong ground vibration and crater heave, so the setback from active track (Table 7.2-1) and the vibration limits for dynamic compaction in Section 7.2.2 apply. Dynamic replacement suits yard and access road areas on soft ground away from operating track, where its columns also speed consolidation.
Source: Singh and Hymavathi (n.d.). Full reference under Supplemental References.
Two explosive ground improvement methods appear in this chapter. Blast densification of loose saturated sand is described in the technology sheet in Section 7.2.16. Explosive replacement of soft clay is described in the box above. Both deliberately cause strong vibration and, for blast densification, temporary liquefaction of the treated layer.
For railroad work: Treat either method as blasting, not as ground improvement vibration. The same controls apply as for rock excavation blasting:
(1) the scaled-distance or monitored-PPV limits of Section 5.3.27;
(2) a seismograph at the nearest track, structure and signal equipment;
(3) the 0.5 in./s at-rail threshold in this section.
Liquefaction of the treated layer can spread to untreated loose ground beyond the treatment area, so keep these methods well clear of operating track. Use them for new alignments and yards on greenfield ground, and confirm the result by CPT several weeks after treatment, when strength gain has occurred.
Source: 30 CFR 816.61–816.68. Full reference under S23.
PVDs accelerate consolidation by reducing the drainage path from the full layer thickness H_dr (vertical flow) to the horizontal spacing s_r between drains (radial flow). The average degree of consolidation from radial drainage U_r is:
Where T_r is the radial time factor:
And:
Where:





For preliminary design, the simplified Hansbo (1981) formula is commonly used (omitting well resistance and smear):
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Ur | 1 - exp[ -8 T_r μ ] | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| Tr | intermediate value computed on this page | Another equation | Computed: T_r = c_h ⋅ t d_e^2 | project-specific |
| ch | horizontal coefficient of consolidation (ft²/day) | Lab test (or field) | Consolidation test (ASTM D2435 or D4186), log-time or root-time fit at the design stress range. ch from CPTu dissipation tests. | CL 0.05–1, CH 0.005–0.2 ft²/day · by USCS group |
| t | elapsed time (days) | Time | Elapsed test time (recorded) or the analysis time chosen for design. | project-specific |
| de | equivalent diameter of influence zone (ft) | Another equation | Computed: d_e = 1.13 × s for square grid; 1.05 × s for triangular grid | project-specific |
| s | drain spacing (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| μ | drain spacing/smear/resistance factor: | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| dw | equivalent drain diameter (ft) | Product data | Manufacturer's data sheet for the specified product, confirmed by project QA testing. | project-specific |
| ds | smear zone diameter (ft) | Another equation | Computed: d_s = 2–3 × d_mandrel (typically 0.5 ft for standard mandrel) | typically 0.5 ft for standard mandrel |
| kh/ks | horizontal to smear zone permeability ratio (typically 3–5) | Field or lab test | Field: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only. | clean sand 1–100, clay < 0.001 ft/day · by USCS group |
| qw | drain discharge capacity (ft³/day) | Product data | Manufacturer's data sheet for the specified product, confirmed by project QA testing. | typically about 10–80 ft³/day (100–800 m³/yr) for standard PVDs |
| L | drain length (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| z | depth (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
The total degree of consolidation U_total combines radial and vertical drainage:
Where U_v is from the Terzaghi vertical consolidation equation (Chapter 6.2, Section 6.2.7).
Where subgrade shear strength s_u is insufficient for the full embankment load, construction proceeds in stages with PVDs to gain strength before next stage:
Strength gain from consolidation (Ladd 1991 SHANSEP):
Where S = 0.22–0.25 (normalized undrained strength ratio for soft clay); m = 0.88 (for CK₀U triaxial compression). For each stage: place fill to height H_i; wait for U_r ≥ 80% before next stage; verify FS_slope ≥ 1.3 (EOC) before next placement.
| Project | Railroad | Soft Layer (ft) | c_h (ft²/day) | c_v (ft²/day) | Drain Spacing (ft) | Grid | Target Utotal | Time to Utarget |
|---|---|---|---|---|---|---|---|---|
| Coastal Georgia Mainline | Class I | 35 | 0.012 | 0.006 | 5.0 | Triangle | 90% | 120 days |
| Manitoba Prairie Fill | Class I | 28 | 0.018 | 0.009 | 4.5 | Square | 85% | 90 days |
| Louisiana Yard Expansion | Class I | 42 | 0.015 | 0.008 | 5.0 | Triangle | 90% | 150 days |
| Quebec Mainline Soft Clay | Class I | 50 | 0.010 | 0.005 | 4.0 | Triangle | 90% | 180 days |
| Passenger corridor Embankment Widening | Passenger | 20 | 0.022 | 0.011 | 4.0 | Square | 95% | 75 days |
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| S | 0.22–0.25 (normalized undrained strength ratio for soft clay) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| m | 0.88 (for CK₀U triaxial compression) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| su | undrained shear strength | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
| OCR | preconsolidation stress / OCR | Lab test (or correlation) | Preconsolidation stress from the consolidation curve (Casagrande or work method, ASTM D2435). CPT screening: σ'p ≈ 0.33(qt − σv). OCR = σ'p/σ'v0. | OCR 1 (NC) to > 4 (heavily OC) · by USCS group |
| σ'v | vertical stress / pore pressure | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
Wick drains give trapped pore water a short vertical path out, accelerating consolidation of soft saturated ground that would otherwise take years to drain. Several mandrels can work a large site at once.
After Geotechnology for Railroaders Program, Module 6.2; §02. Full reference under Supplemental References.
Technology sheets for this method · see 7.2.16 Technology Library
Case study: 7.2.17.2 Wick-drain rigs on dredged sand over 104 psf clay: four ways to size the platform (Look 2023), in §17.17 Case Studies.

A new track or siding on soft clay can settle for years. Prefabricated vertical (wick) drains shorten the drainage path from half the clay thickness to half the drain spacing, so most of the primary settlement can be taken out under a preload before the track goes down. Craig's Soil Mechanics and Das's Advanced Soil Mechanics give the theory. Barron's equal-strain solution covers radial flow to the drain. Barron's smear-zone extension (Das Eq. 8.177) accounts for the clay remolded by the mandrel. Carrillo's rule combines radial and vertical drainage. Craig stresses that ch controls the design and matters more than refinements to the theory. Drains do nothing to secondary compression, and they may help little in overconsolidated clay that stays below its preconsolidation pressure.
Equation 7.2-1. Radial and combined consolidation
Ur = 1 − exp(−8Tr/F), Tr = cht/de²
F = n²/(n² − S²) ln(n/S) − 3/4 + S²/(4n²) + (kh/ks)(n² − S²)/n² ln S
U = 1 − (1 − Uv)(1 − Ur)
With no smear (S = 1) F reduces to Barron's F(n) = n²/(n² − 1) ln n − (3n² − 1)/4n². The calculator reproduces Das's Example 8.11: 6 m of clay drained both ways, 0.45 m drains at 3 m effective diameter, and U = 0.871 at one year against the published 0.870 (217.5 mm of the 250 mm). It also reproduces Craig's Example 7.8, where 400 mm sand drains in a square pattern must reach 85% in six months under 10 m of single-drained clay. The calculator's spacing is 10.34 ft (3.15 m), against Craig's 3.2 m read from Barron's chart.
A siding embankment over 30 ft of double-drained soft clay (cv = 0.15, ch = 0.30 ft²/day) will settle 18 in. Without drains only 39.1% of that occurs in six months. Band drains (4 × 0.15 in.) at 5 ft on a triangular grid, with a smear zone twice the drain diameter, reach 99.6% in 180 days and 90% in 72 days. The widest spacing that still reaches 90% in six months is 7.80 ft, which lowers the drain footage.
Open the wick drain calculator →
Barron equal-strain radial consolidation with a smear zone, combined with vertical drainage, settlement with and without drains, the spacing needed to reach a target degree of consolidation, and the time to reach it.
| Type | Typical size | Notes |
|---|---|---|
| Sand drain (bored or driven, sand backfill) | 8 to 16 in. diameter, to depths over 100 ft | Careful backfilling needed to avoid necking; a large drain can act as a weak pile and carry part of the load |
| Sandwick (filter sock filled with sand) | About 2.5 in. diameter | Flexible, so lateral soil movement rarely breaks continuity |
| Band (wick) drain: plastic core in filter fabric | About 4 × 0.16 in. | Installed with a mandrel and anchor plate; equivalent diameter = perimeter/π; the usual choice today |
Smear around the drain can be modeled by a reduced ch or a reduced drain diameter. The calculator instead uses Barron's smear-zone solution as given by Das.
| n = de/dw | F(n) | Tr at Ur = 50%: Das / equation | Tr at Ur = 80%: Das / equation |
|---|---|---|---|
| 5 | 0.936 | 0.0811 / 0.0811 | 0.1884 / 0.1884 |
| 10 | 1.578 | 0.1368 / 0.1368 | 0.3175 / 0.3175 |
| 15 | 1.971 | 0.1708 / 0.1708 | 0.3966 / 0.3966 |
| 20 | 2.254 | 0.1953 / 0.1953 | 0.4534 / 0.4534 |
| 25 | 2.474 | 0.2144 / 0.2144 | 0.4978 / 0.4978 |
The worked example was rerun to show how drain spacing and smear affect the schedule. The time to 90% consolidation rises roughly with the square of the spacing: about 45 days at 4 ft against 285 days at 10 ft. Smear matters less but is not negligible. Going from no smear to a smear zone four times the drain diameter adds about half again to the time. Because the smear zone grows with mandrel size, use the smallest mandrel that can install the drain.
| Spacing (ft) | Days to 90% | Smear ratio ds/dw (5 ft spacing, kh/ks = 2) | Days to 90% |
|---|---|---|---|
| 4 | 45 | 1 (no smear) | 57 |
| 5 | 72 | 2 | 72 |
| 6 | 106 | 3 | 81 |
| 7 | 145 | 4 | 86 |
| 8 | 189 | ||
| 9 | 236 | ||
| 10 | 285 |
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.
Vacuum preloading lowers the pore water pressure in the soil instead of raising the total stress with fill. The effective stress rises by the same amount in both cases, but under vacuum the soil is pulled inward rather than pushed outward, so there is no risk of a stability failure during loading. Where more load is needed than the vacuum can supply, fill surcharge is added on top of the sealed membrane.
For railroad work: Vacuum, alone or combined with fill, suits new yard tracks and embankments on very soft clay where the fill needed for an equivalent surcharge would itself be unstable. It removes the staged-loading waiting periods that fill surcharge needs. The vacuum sheet in Section 7.2.16 covers design and specification.
Source: Yan, Feng and Chu (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Removing thick soft river deposits and replacing them with compacted fill added a third or more to the cost of the earth dams studied. The authors show that 65- to 100-ft-high dams can instead be built directly on fine-grained soft deposits by staged construction, with stage height, rate and waiting time set by undrained strength gain analysis.
For railroad work: The same principles govern tall railroad embankments and bridge approach fills on soft ground. The transition at an abutment is the counterpart of the dam-to-abutment transition: plan settlement monitoring and stage limits there with the most care (Chapter 6.2, Section 6.2.6).
Source: Edil and Berilgen (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Stone columns (vibro-replacement) improve soft cohesive subgrades by inserting dense granular columns (typically 24–36 in. diameter) on a regular grid. The Priebe (1995) method computes an improvement factor n₀ based on area replacement ratio A_c/A:



Area replacement ratio:
Where D_c = column diameter (ft); s_col = column spacing (ft).
Basic improvement factor (Priebe 1995):
For ν_s = 1/3, with column friction angle φ'_col = 40° and K_ac = tan²(45° − 20°) = 0.217, this reduces to:
Composite settlement reduction:
Composite modulus:
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| as | intermediate value computed on this page | Another equation | Computed: a_s = A_c A = π D_c^2 / 4 s_col^2 (square grid) | project-specific |
| Dc | column diameter (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| scol | column spacing (ft). | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| n0 | intermediate value computed on this page | Another equation | Computed: n_0 = 1 + a_s [ 1 a_s K_a ⋅ (1 - a_s)(1 - 2ν_s) 1 - ν_s - 1]^-1 | project-specific |
| Ecomposite | soil elastic modulus = E_soil S_improved/S_untreated = n_0 ⋅ E_soil | Field test, lab test or correlation | Pressuremeter (ASTM D4719), DMT (D6635), plate load (D1196), triaxial secant modulus, or correlation with N60 or qc. | loose sand 200–500, dense sand 1,000–1,700 ksf · by USCS group |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |

The bearing capacity of the composite improved ground beneath a loaded area is:

Where q_ult,col = bearing capacity of stone column material (typically 8–15 tsf); q_ult,soil = undrained bearing capacity of surrounding clay (N_c × s_u; typically 1–3 tsf).
| Application | D_c (in.) | Spacing (ft) | a_s | n₀ (Priebe) | Settlement Reduction | φ'_col (°) |
|---|---|---|---|---|---|---|
| Track subgrade support | 24 | 7.5 | 0.057 | 1.6–1.8 | 44–56% | 38–42 |
| Intermodal yard (light) | 30 | 8.0 | 0.077 | 1.8–2.2 | 45–55% | 40 |
| Bridge abutment | 36 | 6.0 | 0.196 | 2.5–3.5 | 60–71% | 40–42 |
| Crane runway (RTG) | 36 | 5.0 | 0.283 | 3.0–4.0 | 67–75% | 42 |
| Surcharge preload zone | 24 | 9.0 | 0.040 | 1.4–1.6 | 38–44% | 38 |
Stone columns and rammed aggregate piers installed on a triangular grid through a shallow-to-medium failure plane create a composite of native soil and dense columns that carries load and resists shear better than either alone.










After Geotechnology for Railroaders Program, Module 6.1; §07. Full reference under Supplemental References.
Technology sheets for this method · see 7.2.16 Technology Library
Side-by-side test areas compared vibro stone columns installed with and without prefabricated vertical drains in silty sands and sandy silts.
For railroad work: For liquefaction mitigation under bridge approaches and embankments in silty ground, specify wick drains between the stone columns, screen each layer for clay-size content before selecting the method, and schedule acceptance SPTs or CPTs a few weeks after installation. Where clay-size content reaches 15%, consider deep soil mixing or a column-supported embankment instead (Chapter 6.5).
Source: Rollins, Quimby, Johnson and Price (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
The authors link cyclic resistance to shear wave velocity and shear wave velocity to void ratio for sandy soils. For a given earthquake magnitude, the velocity needed to resist liquefaction sets a target void ratio, which can then be converted into stone column diameter and spacing for square or triangular patterns. On a vibro stone column project, surface-wave (SASW) testing before and after treatment agreed well with SPT-based evaluations.
For railroad work: A velocity target suits long corridor treatments because surface-wave and MASW testing can cover the treated length quickly between borings (Chapter 5.1, Sections 5.1.6 and 5.1.0). Use it alongside SPT or CPT acceptance, not instead of it, and test after any time-dependent strength gain.
Source: Zhou, Chen and Chen (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
A large commercial building site combined two methods: vibro stone columns to densify and drain loose sand layers that would liquefy in the design earthquake, and deep soil mixing columns to carry heavy building column loads past soft clay. CPTs before and after treatment confirmed the liquefaction mitigation. Numerical (FLAC) analysis set the soil-mix column depth, and full-scale load tests on column groups matched the prediction. The facility performed without distress for more than seven years.
For railroad work: Mixed treatments work well where one problem is liquefaction and another is settlement under concentrated loads, such as intermodal crane runways or heavy equipment pads in seismic areas. Size each method for the problem it solves, and prove the column groups with load tests before production.
Source: Shao (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
DSM mechanically blends in-situ soil with cementitious binder (Portland cement, lime, or blends) using hollow-stem augers with injection ports. The resulting soil-cement mass (referred to as a "treated mass" or "column") achieves unconfined compressive strengths of 50–300 psi depending on binder content and soil type. DSM is used for:



Design unconfined compressive strength:
Where f_lab = field-to-laboratory strength ratio, commonly 0.2–0.5; use 0.25 for conservative preliminary design. Laboratory mix design targets q_u,lab ≥ 100 psi for soft clay treatment.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| qu | intermediate value computed on this page | Another equation | Computed: q_u = f_lab × q_u,field | project-specific |
| flab | 0.20–0.33 (field-to-laboratory strength ratio | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
Treated mass elastic modulus:
For q_u,field = 50–300 psi this gives about 7,500–150,000 psi. For settlement reduction using composite modulus approach:
Where a_DSM = area replacement ratio of DSM columns within the treated zone (typically 0.15–0.35 for track subgrade improvement).
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| EDSM | intermediate value computed on this page | Another equation | Computed: E_DSM = 150 ⋅ q_u,field to 500 ⋅ q_u,field (psi) | project-specific |
| Ecomposite | soil elastic modulus = a_DSM ⋅ E_DSM + (1 - a_DSM) ⋅ E_soil | Field test, lab test or correlation | Pressuremeter (ASTM D4719), DMT (D6635), plate load (D1196), triaxial secant modulus, or correlation with N60 or qc. | loose sand 200–500, dense sand 1,000–1,700 ksf · by USCS group |
| aDSM | area replacement ratio of DSM columns within the treated zone (typically 0.15–0.35 for track subgrade improvement). | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | typically 0.15–0.35 for track subgrade improvement |
| Railroad | q_u,field minimum (psi) | Test Method | Curing Period (days) | Notes |
|---|---|---|---|---|
| Typical | 50 | ASTM D2166 | 28 | Common practice; confirm with owner |
Owner railroads may set different values. Confirm them against the owner railroad's current standards when the work is scoped.
When there is no time to preload, columns of almost any type — aggregate piers, vibro-concrete columns, DSM columns, augered or driven piles — can carry the embankment to a firm layer. SHRP2 R02 notes that the method is most economical for 15–70 ft of soft clay, peat or organic soil, and cites the Rancocas Creek Railroad Bridge approach in New Jersey (Figure 17-S3). Key points of the recommended design procedure (there is no approved FHWA method):

Table 17-S3. Typical allowable column capacities (SHRP2, adapted from Elias et al., 2006)
| Column type | Allowable capacity (kip) | Typical length (ft) | Diameter/width (in.) |
|---|---|---|---|
| Stone columns | 20–110 | 10–35 | 18–47 |
| Geotextile-encased columns | 65–135 | 10–35 | 30–60 |
| Rammed aggregate piers | 50–150 | 10–35 | 24–36 |
| Augered piles | 75–250 | 15–80 | 12–24 |
| Vibro-concrete columns | 100–250 | 10–35 | 18–24 |
| Deep mixing columns | 90–270 | 30–100 | 24–120 |
| Precast concrete piles | 90–225 | 30–50 | up to 24 |
| Steel H / pipe piles | 90–450 / 180–550 | 15–100 / 30–130 | 6–12 / 8–48 |



Source: SHRP2 R02 / GeoTechTools (2012). Column-Supported Embankments — fact sheet, design guidance and photographs

Technology sheets for this method · see 7.2.16 Technology Library







Deep soil mixing is usually specified for strength and settlement. This study used it to stop seasonal heave and shrinkage of an expansive clay of moderate depth beneath pavements and earth structures.
For railroad work: Expansive clay subgrades cause recurring track surface and cross-level defects in dry and wet seasons (Chapter 2.5). Where the active zone is too deep for lime treatment of the top lifts (Section 7.2.7), soil-mix columns are an option for short critical lengths such as turnouts, crossings and bridge approaches.
Source: Madhyannapu, Puppala, Bhadriraju and Nazarian (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Strength tests alone do not show whether binder is evenly distributed through a column. The authors measured the electrical resistivity of cores, and the parameters derived from it (formation factor, shape factor and anisotropy factor), and found them direct indicators of mixing uniformity. The results agreed with SPTs on the columns and unconfined compression tests on the cores. Double-slurry mixing produced markedly more uniform columns than single-slurry mixing.
For railroad work: Add a uniformity check to deep-mixing QA for railroad work: resistivity of cores, or geophysical testing of whole columns, alongside core recovery and strength. Ask the contractor which mixing process will be used, because the process affects uniformity as much as the binder content does.
Source: Liu, Zhang and Zhu (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Column-type elements behave in three ways: granular columns (sand and stone), soil-cement columns (deep-mixed, lime and jet-grouted) and rigid piles (concrete and steel). Composite columns combine them by placing a small-diameter plain concrete, reinforced concrete or steel core in the center of a granular or soil-cement column.
For railroad work: Composite columns fit bridge approach embankments and high fills where ordinary soil-cement columns would be too weak in bending under the side slopes (see Section 7.2.8 on lateral behavior of embankment columns), but a full pile foundation is more than the job needs.
Source: Zheng, Liu and Chen (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Compaction grouting injects a stiff grout (slump < 2 in.) that does not penetrate soil pores but instead forms a grout bulb, displacing and densifying surrounding soils. Used for:






Grout volume per bulb:
Where D_bulb = target bulb diameter (ft); typically 1.5–2.5 ft. Injection spacing = 4–8 ft on grid; primary and secondary passes used to achieve uniform densification.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Dbulb | target bulb diameter (ft) | Design criterion | Set by the owner railroad's standards, AREMA, AASHTO, USACE or the project specification. | typically 1.5–2.5 ft. Injection spacing = 4–8 ft on grid |
Low-viscosity grout (sodium silicate, acrylamide, or ultrafine cement) is injected under low pressure to penetrate pore spaces without disturbing soil fabric. Used in granular soils (D₁₅ > 0.025 in.) to reduce permeability or improve strength.

Groutability ratio (GR):
After Selig & Waters (1994), ch. 11. Full reference under Supplemental References.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| GR | D_15,soil D_85,grout ≥ 24 (for successful permeation) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
High-pressure jetting (3,000–7,000 psi) simultaneously erodes and mixes in-situ soil with cement grout, creating cylindrical treated columns. Single-fluid, double-fluid, and triple-fluid systems produce column diameters of 1.5–5.0 ft. Used by a passenger railroad for underpinning passenger corridor structures and by a Class I railroad for liquefaction mitigation under existing embankments.
Column diameter depends on the soil, the jet system and the jetting parameters (pressure, flow, lift and rotation rates), so confirm it with test columns before production.
The grouting methods above are general. The method developed specifically for railroad subgrades is slurry pressure injection from hi-rail equipment, which can clear for trains between injections. Soft fine-grained subgrade and repeated resurfacing drive ballast down into ballast pockets that trap water, cause squeezes and keep the soil weak. Injection works in two ways:

Table 17-S1. Typical injection parameters (FRA handbook, 1977, and Pengelly)
| Parameter | Typical value |
|---|---|
| Rods | Three, 5 ft apart: one on track centerline, one each side (Figure 17-S2) |
| Depth | Lime: 10–16 ft historically; most programs ≥ 20 ft; modern units 30–40 ft |
| Longitudinal spacing | About 5 ft (every second or third crib; never more than 4 crib spaces); every crib, staged, in severe distress |
| Stage interval | 18–24 in., injecting downstage (top down) to refusal or target take |
| Pump pressure | 50–250 psi (150 psi common); keep low to maximize take |
| Lime slurry | 2.5–3 lb lime per gallon of water (never > 4); SG about 1.15–1.17 |
| Quantity | 30–50 gal per track ft for a 10–16 ft lime injection (FRA); 200–250 lb dry solids per track ft typical, 150 mild to 1,000 severe (Pengelly) |
| Staging | Second or third pass 48 hr or more later into skipped cribs, e.g., deep lime pass then shallow void-filling pass |

Investigation and testing. The FRA handbook suggests about 2 + L/250 borings for L up to 1,000 ft of problem track, 6 + (L − 1,000)/300 for 1,000–4,000 ft, and 16 + (L − 4,000)/400 for 4,000–10,000 ft, with continuous Shelby tubes for 5 ft just below the ballast and borings at least 5 ft below the deepest planned injection. Lab “lime-inoculated” specimens (1% lime by dry weight, representing 5-ft centers) are compared with untreated controls in swell, consolidation and strength tests. CPT before and after injection locates ballast pockets, sets the target take and verifies improvement. Contractor case histories (a line in Iowa, every other crib, 14–40 ft; a line in Missouri, every crib to 20 ft after CPT found weak soil to 18–20 ft) used this approach. The FRA handbook itself cautions that results cannot yet be predicted reliably from lab tests and recommends a field test section before a program.

Material caution: Pengelly attributes past poor results partly to substandard fly ash and recommends only ash that reliably sets (Class C in his experience). Test every ash source for compatibility. Note that his description of the coal sources is reversed relative to ASTM C618, where Class F comes from bituminous or anthracite coal and Class C from sub-bituminous or lignite.
How the method developed. Railroads began pumping slurry into subgrades in the 1930s, when maintenance engineers drove pipes into soft roadbed and pumped blends of sand, cement and emulsified asphalt 6 to 12 ft deep to fill ballast pockets. By the 1940s dozens of railroads used the method; one Class I railroad treated more than 1,000 miles of track between 1942 and 1955. Lime slurry, intended to react with the clay rather than fill voids, was first injected under track in 1959. Hi-rail injection units and a federal handbook (Blacklock and Lawson, 1977) made lime injection a routine yearly maintenance contract by the late 1970s. Fly ash was added from about 1978, partly because lime had become expensive and partly because lime and fly ash together set. In the early 1990s finely ground railroad cements took the practice back to void filling. Use declined after railroad consolidation, as the staff who ran injection programs moved on and maintenance budgets turned to other parts of the track. Pengelly attributes much of the doubt about the method to programs that were run without before-and-after test data, and to substandard materials, rather than to the method itself.
Choosing the slurry. Choose the material from the goal of the program.
Under pressure the slurry follows the paths of least resistance: the shear planes, slickensides and disturbed zones of a failing subgrade, which are the zones that most need treatment. Interval timing and staging spread it further.
Injecting downstage. The rods are pushed hydraulically, and slurry is pumped through four 1/4-in. nozzles set 90° apart on the tip at intervals of about 18 in. from the top down. Each interval is pumped to the target take, or for a minimum time, or until slurry refuses through earlier holes or out of the embankment side. If slurry runs up the rod, push the rod deeper to make a seal before pumping. Keep the pressure as low as the ground allows: high pressure brings early refusal and a smaller take. Most soft subgrades accept slurry well below the pump’s upper range, and the pressure is raised only to fracture tight soil. Typical equipment is a hi-rail unit with a mast that reaches 40 ft and three rods 5 ft apart; a piston or progressive-cavity pump of about 90 gal/min at 50 to 200 psi; and an agitated slurry tank of 17,000 to 22,000 gal on a flat car in tow, which can clear for trains between holes. The operator records depth, take and time at every hole. Compare the daily totals with the target, and adjust spacing, staging or depth while the crew is still on site.
Checking the result. Repeat the CPT soundings after treatment. Where railroad cement has filled the pockets the cone may not push through, so use borings to measure moisture content and in-place strength instead. Lime results can take 6 to 9 months to appear, so schedule the after-soundings accordingly.
| Area | Dry density (pcf) | Percent of ASTM D698 maximum | Moisture content (%) | Field CBR at 0.1 in. penetration | Field CBR at 0.2 in. penetration | LL / PI |
|---|---|---|---|---|---|---|
| Untreated brown and tan clay (4 tests) | 84.1 | 87.6 | 34.8 | 0.9 to 1.8 | 1.2 to 2.3 | 71 / 39 |
| Lime/fly ash injected tan and brown clayey silt (3 tests) | 95.3 | 104.2 | 23.4 | 24 to 29 | 22 to 34 | 63 / 25 |
Read Table 17-S2 as an indication of what injection can do to moisture and bearing, not as a design value for track. The test area was an airfield taxiway, and the treated and untreated soils were logged differently, so part of the difference may be the soil itself. The improvement is consistent with the mechanism: hydration of the injected material takes up water, the moisture content drops by about 11 points, and the bearing rises with it.
Running a program. Injection is used in two ways.
Worked example. Example 7.2-4 in Section 7.2.9 works through the slurry quantity needed to fill the ballast pockets in a section of track, from a CPT sounding.
Source: Blacklock, J. R. and Lawson, C. H. (1977). Handbook for Railroad Track Stabilization Using Lime Slurry Pressure Injection. FRA/ORD-77/30, Federal Railroad Administration · Pengelly, A. D. Injection for Railroad Subgrades. Hayward Baker, Inc. (scanned; text recovered by OCR) · Hayward Baker, Inc. Railroad Subgrade Stabilization (brochure)
Cement-slurry injection and compaction grouting pump material into the ground under pressure, densifying loose soil or filling voids without excavating the track. Where poor material is shallow, remove-and-replace with engineered granular fill over a separator geotextile is still the most direct fix. Admixture stabilization, usually with Portland cement, treats soil in place, and is faster and cheaper when the soil responds well.





After Geotechnology for Railroaders Program, Module 6.2; §04–05. Full reference under Supplemental References.
Technology sheets for this method · see 7.2.16 Technology Library
To grout beneath an existing foundation, the grout pipe is often inclined from outside the loaded area. The authors estimate the heave at the ground surface above an inclined compaction grout column from elastic theory, with influence factors for the column length, the depth of injection and the inclination.
For railroad work: Compaction grouting under track is normally done with inclined holes from the shoulder or between tracks. Estimate the heave beneath the rails before grouting and set track geometry limits and monitoring intervals for the work, so that the track is not lifted out of tolerance (Chapter 5.3).
Source: Basu, Madhav and Prezzi (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Double-erosion jet grouting (a rotary-jet variant) cuts the soil twice and forms very large columns. In a deep excavation in a soft coastal deposit, columns reached about 164 ft deep.
For railroad work: Column diameter and quality depend heavily on soil type, so specify trial columns in each soil layer and check diameter and uniformity before production. Jet-grouted cutoffs and bottom seals are relevant to deep excavations for underpasses and pump stations beside track.
Source: Shen, Luo, Xiao and Wang (2009); Wang, Wang and Wang (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Compensation grouting injects grout under high pressure through sleeve pipes (tubes-à-manchette) to fracture the soil deliberately. The grout fills the fractures, which open in the direction of least principal stress, and the added volume makes up for ground loss. It is used to prevent or reverse settlement of structures above tunnels and excavations, and in repeated passes can lift settled structures in a controlled way.
For railroad work: Compensation grouting can protect track over a tunnel or jacked crossing, or relevel track and structures that have settled. It needs real-time monitoring of the track and the ground during injection, with stop criteria, because grout fractures can heave the track unevenly or reach drains and culverts. Agree the target lift and allowable rates with the railroad before work starts.
Source: Singh and Hymavathi (n.d.). Full reference under Supplemental References.
Hydrated lime (Ca(OH)₂) added to fine-grained soil produces immediate PI reduction through cation exchange and flocculation, and long-term pozzolanic strength gain.
PI reduction rule of thumb:
Where L_p = lime percentage (by dry soil weight, %). Target: PI_final < 12 for use as subgrade; PI_final < 20 for use as embankment fill. Minimum lime content: 3%; maximum practical: 8%.
Strength gain timeline:
| Curing Time | q_u (psi) — Typical CL/CH Clay | q_u (psi) — ML/MH Silt |
|---|---|---|
| 1 day | 15–30 | 10–20 |
| 7 days | 30–80 | 20–50 |
| 28 days | 50–150 | 35–90 |
| 1 year | 100–300 | 70–200 |
Sulfate precaution: Soluble sulfate above about 3,000 ppm can cause ettringite heave with lime, cement or fly ash alike. Test sulfate (ASTM D4327 or equivalent) and follow the National Lime Association guidance below.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Lp | lime percentage (by dry soil weight, %) | Design criterion | Set by the owner railroad's standards, AREMA, AASHTO, USACE or the project specification. | project-specific |
Portland cement (ASTM C150, Type I/II) or fly ash (ASTM C618, Class C or F) stabilizes both granular and fine-grained soils through cementation. Design target: q_u ≥ 200–300 psi at 7 days (ASTM D1633, withdrawn 2026) for pavement base applications (Chapter 7.3).
Mix design proportioning:
Determined from laboratory trial mixes at cement contents of 4%, 6%, 8%, 10% by dry weight. Minimum cement content for railroad fill: commonly 4%; confirm with the owner railroad's specification.
The sulfate problem is not specific to lime. Sulfates react with calcium and clay alumina to form expansive ettringite and thaumasite with any calcium-based additive — lime, portland cement or fly ash. Switching to cement or fly ash therefore does not avoid it. NLA guidance:
| Soluble sulfate | Guidance |
|---|---|
| < 3,000 ppm (0.3%) | Unlikely to cause problems |
| 3,000–5,000 ppm | Readily stabilized with good practice: plenty of water, ample mellowing between mixings |
| > 5,000 ppm | Often two lime applications: first before mixing, second after a multi-day mellowing at about 5% over optimum moisture so that ettringite forms before compaction (research cited suggests a single application at +2% moisture up to 7,000 ppm) |
Sulfates occur in isolated seams and pockets (commonly naturally occurring gypsum in the western U.S., or industrial and synthetic-gypsum contamination), so sample more densely than for other index tests. Other NLA criteria: good candidates have at least 25% passing No. 200 and PI > 10; organics > about 1% need extra lime or special procedures; subgrade stabilization typically uses 3–6% lime. Construction sequence: scarify and pulverize, spread lime, preliminary mix and water, mellow 1–7 days, final mix until 100% of non-stone material passes 1 in. and at least 60% passes No. 4, compact, then moist- or membrane-cure. For embankment repairs, treat borrow in a stockpile at 1–3% over optimum so mellowing happens off the critical path.
Source: National Lime Association (2004). Lime-Treated Soil Construction Manual: Lime Stabilization & Lime Modification, Bulletin 326
In seasonal-frost areas, use lime or cement stabilized subgrade under track with caution. Use it only after a laboratory program on the treated soil that includes a frost-susceptibility test and a freeze–thaw durability test. UFC 4-860-01FA refers to TM 5-822-14 for the design and construction of soil-stabilized subgrades.


After UFC 4-860-01FA (2004), ch. 6, §8e. Full reference under Supplemental References.
| Admixture | Suitable soils | Avoid / notes |
|---|---|---|
| Cement | Broadly graded sand–gravel; < 35% passing No. 200 and PI < ~30 | Highly organic, high-salt or high-sulfate soils; coarse gravel (high cement demand); CH clay (hard to mix). Use lime instead where the fines or PI limits are exceeded. |
| Lime | Clay fraction (< 2 µm) ≥ 7% and PI > 10; typically 3–7% lime by weight | Lab reactivity test required. Lowers maximum dry density and raises optimum moisture, which helps wet clay. Strength gains slowly, giving a flexible working time, but it is not for a rapid strength need. |
| Bitumen | GW, GP, SW, SP, GM, SM | Poor in wet soils. Too much bitumen lowers strength. A sprayed emulsion film works only where the water table will not be trapped beneath it. |
Cracking risk. A cement-stabilized layer over softer soil develops tension at its base under each axle. Unlike a granular layer, it cannot build up residual compression, so it may crack and lose its benefit. Lime-treated soil cracks less than soil-cement. Cement also raises wet–dry and freeze–thaw resistance and lowers swell. It reduces permeability in granular soils but can increase it in clay.
After Selig & Waters (1994), ch. 11. Full reference under Supplemental References.
Technology sheets for this method · see 7.2.16 Technology Library
Case study: 7.2.17.3 Lime-treated local soil in a reinforced slope: choosing by total internalised cost (Look 2023), in §17.17 Case Studies.
In Bull’s volume, Praticò, Saride and Puppala (Chapter 2.1) build a life-cycle cost model for choosing among three ways of treating a weak subgrade:

Each alternative has an expected life that comes from its mechanical properties. Its present value sums three kinds of cost:
Over an infinite horizon, where the first rehabilitation falls at year E and repeats every O years, the agency present value is:
PV = C + CRE × (1+i)−E / [1 − (1+i)−O]
The “gain” of one alternative over another is simply the difference in their present values.
The authors tested the model on two low-volume roads at a 4% discount rate. In the Italian case, a lime-treated CL subgrade was given a 20-year life against 15 years untreated. Stabilization beat substitution when stabilization was cheap. User costs were only about 1/50 of agency costs at those traffic levels. User gains turned negative once the treated alternative’s work zone lasted about 1.5 times as long as the untreated case. Stabilization paid at higher traffic. At very low traffic, remove-and-replace cost more than doing nothing. In the Texas case, lime–cement treatment turned a CH soil with 6.3% free swell into a non-swelling CL. Its unconfined strength rose from about 13 to 250 psi, and its resilient modulus from about 6 to 35 ksi.

For railroad work: the same three choices come up at most chronic subgrade sites:
The perpetual-cycle factor shows how much each added year of life is worth. At 4%, (1.04)−15/[1 − (1.04)−15] = 1.25, while the same factor at 20 years is 0.84. So a treatment that stretches the maintenance cycle from 15 to 20 years cuts the present value of all future rehabilitation by about a third. Replace the highway user costs with train-delay and slow-order costs. Count the haul trips, quarried aggregate and disposed spoil or fouled ballast as externalities. Then test how the ranking changes with treatment cost and traffic (MGT), as the authors do.
Source: Bull, J. W. (ed.) (2015). Life Cycle Costing for the Analysis, Management and Maintenance of Civil Engineering Infrastructure. Dunbeath, Scotland: Whittles Publishing, pp. 66–77. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.
Lime slurry pressure injection (LSPI) treats unstable fine-grained roadbed in place without removing the track. A hi-rail injector truck drives hollow rods, normally three (one on the track centerline and one about 5 ft to each side), down through the ballast and pumps a thin slurry of hydrated lime and water into the soil in stages to the full treatment depth. The slurry follows seams and fractures. In heavy clays it forms thin sheets of lime that react with the adjacent soil and act as moisture barriers, so expansive clays are best treated near their driest time of year. In weaker silty and sandy clays it disperses through the soil and gains strength by cation exchange and pozzolanic reaction; very wet soils of this kind may need drainage first. The method is suited to repeated ballast pockets, soft spots and swelling clay under track.
| Parameter | Typical value |
|---|---|
| Rod layout | 3 rods: centerline and about 5 ft each side |
| Longitudinal spacing | Every second or third tie (about 5 ft gives overlapping seams) |
| Vertical stage interval | 18 to 24 in. (12 to 18 in. in early literature) |
| Treatment depth | Commonly 10 to 16 ft below top of tie |
| Slurry quantity | 30 to 50 gal per track foot for 10 to 16 ft depth |
| Lime-water ratio | About 2 to 3 lb hydrated lime per gallon of water |
| Pump pressure | 50 to 250 psi (150 psi common) |
| Equipment | 1,500 to 2,000 gal tank; pumping 1,500 to 2,000 gal per hour of track time; 20-ton lime storage |
Injection is normally continued at each stage to refusal (slurry running freely at the surface or from earlier holes). Because refusal depends on the operator and on the soil, the handbook recommends that the plan state which layers are to be treated and how much slurry goes into each, that slurry density be checked to within about 10%, and that test sections be used to set spacing and quantities. Where one pass does not place enough lime, staged or double injection (re-injecting between the first holes after about 48 hours) is used.
| Result | Value |
|---|---|
| Injection holes | 924 |
| Injection stages | 6,468 |
| Slurry | 40,000 gal |
| Hydrated lime | 44.2 tons |
| Track time for pumping | 26.7 hr |
Slurry-to-water conversion assumes a lime specific gravity of 2.3; confirm with the supplier.
About 44 tons of lime and roughly 27 hours of pumping means several work windows. Track time, not material, usually controls the cost, which is one reason to target the injection to the problem layers identified in the investigation.
Open the lime injection calculator →
Injection holes and stages, slurry, water and hydrated lime quantities, tank loads and track time for a treated length.
These documents are in the reference library. The method summaries above are paraphrased; equations are standard or published forms.
Water treatment plants produce large volumes of lime sludge, which is chemically similar to commercial hydrated lime. Soil treated with it gained stiffness, lost plasticity and was more durable under freeze–thaw cycles.
For railroad work: Lime sludge may be a low-cost alternative to hydrated lime for treating embankment fill and subgrade near a water plant. Use a strength-based mix design and check freeze–thaw durability; do not use the pH method in Section 7.2.7.1 for sludge.
Source: Yu, Zhang, Lang and Yu (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Organosilanes bond chemically to silica-based soil particles and leave a near-permanent water-repellent surface, unlike ion-exchange treatments. In laboratory and field tests the treatment changed strength and swell only modestly, but cut infiltration dramatically: the near-saturated hydraulic conductivity fell from about 0.8 ft/day to effectively zero. On a 2H:1V slope, soil loss to erosion fell by a factor of nearly 50.
For railroad work: This is an emerging option for erosion control and for reducing infiltration into cut slopes, shoulders and ditch lines, where surface water drives shallow slides and washouts (Chapter 3.8). Treat it as experimental: specify trial sections and monitor them before wider use.
Source: Daniels and Hourani (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Residue from an alkali (soda) plant was tested in the laboratory and field as fill. It performed as a usable engineering soil for filling low ground and could be placed like ordinary plain soil, with environmental effects evaluated on specific projects.
For railroad work: Industrial by-products can sometimes serve as fill for yards and access roads, but check leachate chemistry, corrosivity to buried steel and concrete, and any permit conditions before accepting them on railroad property (Chapter 5.4).
Source: Li, Tian, Zhao and Wang (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Lime columns are formed by mixing quicklime into soft clay with a special auger. Quicklime (CaO) takes up water from the surrounding clay and slakes to Ca(OH)2, giving off heat and swelling, which consolidates and dries the soil around the column without added load. Calcium ions then exchange onto the clay particles and pozzolanic reactions develop strength over time, and lime diffuses beyond the column. The short-term gain comes mainly from the dewatering effect. Strength measured on columns in the field was much higher than on laboratory-cured samples, because the field soil is confined by overburden.
For railroad work: Lime columns are an alternative to cement deep mixing for soft clay under embankments and widenings (Section 7.2.5). Quicklime is caustic and reacts with heat on contact with water, so storage, handling and personal protection near the track need planning. The swelling columns push the ground outward, so check movement of the existing embankment and track during installation (Chapter 6.2, Section 6.2.18).
Source: Singh and Hymavathi (n.d.). Full reference under Supplemental References.
Geotextiles placed at subgrade/subballast and subgrade/subbase interfaces prevent fines migration (filtration) and maintain aggregate performance (separation). Key design criteria:
Apparent Opening Size (AOS) criterion:
Permeability criterion:
AASHTO M 288 sets a minimum permittivity of 0.02 s⁻¹ for separation geotextiles. Check the owner railroad's specification (AREMA MRE Chapter 1) for track applications.
Use a geotextile for what it can do.
Requirements.
Nonwovens fine enough for silt, and especially clay, may not exist.
Placement.
Durability record.
“Undercut and add fabric” repairs often fail because the mud was not coming from the subgrade, or because the subgrade fines were too fine for the fabric. The book’s process is: diagnose the cause in the field and lab; compare geotextile and non-geotextile options; do an economic analysis; run a field trial; monitor and document. Only a properly graded, durable granular layer gives permanent separation and filtration (Chapter 2.3, §3.5.4).
Geomembranes. Uses:

Hazards: water trapped beneath the membrane creates a slip surface, and holes or leaky seams concentrate flow and erode soil, which is worse than having no membrane. Most leaks are at seams, so require seam testing. A bitumen emulsion sprayed into a sand or subballast layer, which can be done behind an undercutter, is a cheaper alternative with the same trapped-water risk.
After Selig & Waters (1994), ch. 12. Full reference under Supplemental References.
Biaxial geogrids (ASTM D6637) placed at subgrade/subbase interface improve load distribution and reduce differential settlement. The Giroud-Han (2004) method for granular layer thickness over weak subgrade:

The method gives the required base thickness h from the wheel load P, the tire contact radius r, the subgrade CBR, the number of axle passes N, the allowable rut depth, the base-to-subgrade modulus ratio and, for geogrids, the aperture stability modulus J. Its bearing capacity factor N_c is 3.14 without reinforcement, 5.14 with a geotextile and 5.71 with a geogrid, so the reinforcement benefit is largest on weak subgrade. Use the published equation or a calculator that implements it; for an intermodal reach stacker take the actual tire load and contact area.
For preliminary design, the simplified California chart method (USACE TM 5-818-8) is also acceptable when subgrade CBR and geogrid type are known.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| h | intermediate value computed on this page | Another equation | Computed: h = P / (A_p ⋅ p_s) - 1 K_R ⋅ (1 + ε ⋅ h/√ A_p ) (iterative; ft) | project-specific |
| P | wheel load per wheel (lb) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| Ap | contact area per wheel (in.²) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | ≈ 100 in.² |
| ps | allowable subgrade stress = 3.2 × s_u for non-reinforced | Design criterion | Set by the owner railroad's standards, AREMA, AASHTO, USACE or the project specification. | project-specific |
| TBR | traffic benefit ratio (1.5–3.0 for biaxial geogrid) | Product data | Manufacturer's data sheet for the specified product, confirmed by project QA testing. | project-specific |
| KR | load distribution factor (depends on h, A_p, and layer modular ratio) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| su | undrained shear strength | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
Over piled foundations or column-supported embankments (stone columns, rigid inclusions), a Geosynthetic-Reinforced Load Transfer Platform (GRLT) distributes track loads to column heads. GRLT design follows BS 8006:2010 or FHWA-HRT-17-097 (Giroud-Han approach):

Membrane tension in geosynthetic over column caps:

Where W_T = net soil weight transferred to geosynthetic (psf); s = clear span between column caps (ft); δ_allow = allowable sag (ft); typically δ ≤ s/30 for railroad applications.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| WT | net soil weight transferred to geosynthetic (psf) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| s | clear span between column caps (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| δallow | allowable deflection (in.) | Design criterion | Set by the owner railroad's standards, AREMA, AASHTO, USACE or the project specification. | typically δ ≤ s/30 for railroad applications |






After Profillidis (2014), §9.15, Fig. 9.20. Full reference under Supplemental References.
Geogrid can be placed before laying track or during out-of-face work with an undercutting chain. A hot-mix asphalt layer between 12 in. of ballast and 6 in. of compacted sub ballast spreads load and sheds water to the sides.






After Geotechnology for Railroaders Program, Module 6.2; §03–05. Full reference under Supplemental References.
Inspection checks are in Chapter 5.3, Table 15-S1.
After UFC 4-860-01FA (2004), ch. 9, §4b. Full reference under Supplemental References.
Technology sheets for this method · see 7.2.16 Technology Library
Case study: 7.2.17.4 Working platform at the edge of a creek, designed for slope stability (Look 2023), in §17.17 Case Studies.
Field measurements on an instrumented column-supported embankment confirmed soil arching in the fill and allowed four design approaches to be compared.
For railroad work: Keep the embankment above the full-arching height everywhere, including at the low ends of bridge approaches. If the columns do not reach a firm layer, compute the settlement of the soil beneath the column tips explicitly. Check the load share with more than one method; the design procedure in the column-supported embankment sheet (Section 7.2.16) is the starting point.
Source: Chen, Chen, Wang and Xu (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Three kinds of numerical analysis of the geosynthetic layer over column caps all showed that strain peaks at the corners of square caps and at the edges of round caps.
For railroad work: Where a load transfer platform (Section 7.2.8.3) carries track, specify round caps where practical, or orient biaxial reinforcement diagonally to square caps, to reduce peak strain and long-term creep of the reinforcement.
Source: Filz and Plaut (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Most studies of geosynthetic-reinforced, column-supported embankments use static loads, but railroad embankments carry repeated loads. A discrete element model of the fill over pile caps was loaded cyclically.
For railroad work: Static design methods do not capture the growth of reinforcement tension and fill deformation under train loading. For column-supported track, keep the load transfer platform well above the full-arching height, allow for reinforcement tension growth with load cycles, and monitor track settlement through the first months of traffic (Chapter 3.8, Section 3.8.9).
Source: Han and Bhandari (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Three-dimensional analyses of piled embankments loaded to failure divided the ground under and beside the embankment into three zones:
For columns without steel reinforcement, bending failure is more critical than shear failure. Stability analyses that credit the full shear strength of every column therefore overstate the factor of safety.
For railroad work: For embankment widenings and approach fills on columns, check the columns under the side slope for bending, consider reinforced or composite columns in the outer rows, and do not credit unreinforced column shear strength in the slope stability analysis without checking bending (Chapter 6.3).
Source: Zheng and Liu (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Cast-in-place concrete pipe piles. A thin-walled concrete pipe about 3.3 ft in outside diameter with a 4-in. wall is cast in place between vibro-driven casings. Field trials for a highway embankment found:
Controlled modulus columns. Model tests showed that the share of load carried by the columns is sensitive to the stiffness of the load plate above them, so the stiffness of the cushion or load transfer layer can be used to control total and differential settlement.
For railroad work: Both are alternatives to driven piles for bridge approach embankments. Whatever the column type, the stiffness of the cushion or load transfer platform is a design variable, not just a working surface.
Source: Liu, Chen and Liu (2009); Miao, Wang, Zhang and Zhang (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
For railroad work: For long approach embankments, a layout that varies column length with fill height and with depth to firm soil can save cost over a uniform grid. Check differential settlement where the layout changes (Chapter 6.2).
Source: Huang and Li (2009); Liu, Xie, Shi and Zhu (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
Pullout tests on biaxial geogrid in sand separated the two parts of pullout resistance: friction along the longitudinal ribs and passive (bearing) resistance against the transverse ribs.
For railroad work: Pullout capacity of geogrid in reinforced platforms and walls depends on intact transverse ribs and good fill around them. Use the manufacturer’s tested interaction coefficients for the actual fill (Chapter 7.1), and protect the grid from installation damage that would cut the cross ribs.
Source: Liao, Ye and Xu (2009), in Han, J. et al. (eds.) (2009), Advances in Ground Improvement, ASCE GSP 188. Full reference under Supplemental References.
A main line embankment widening on a Class I railroad located in coastal Georgia sits on 30 ft of soft fat clay. The next fill stage can go on only after 90% consolidation, and the schedule allows 120 days. Vertical drainage alone is hopeless at this thickness, so the question is how close the wick drains must be.
| Variable | Value | Description |
|---|---|---|
| H | 30 ft, two-way; Hdr = 15 ft | Soft CH |
| cv, ch | 0.006 and 0.012 ft²/day | |
| dw | 0.196 ft | Equivalent drain diameter |
| Target | U ≥ 90% in 120 days |
Wick drains at 1.5-ft triangular spacing reach 90% in about 77 days, inside the 120-day window.
The margin covers part of the effect of smear and well resistance, which are ignored here; check the spacing with the full μ before final design. Install with a static-push mandrel to limit disturbance, and place piezometers at three depths: the next stage goes on when they show 90%, not when the calendar does.
A container laydown area on a Class I railroad located in Port Arthur, Texas, sits on 18 ft of soft fat clay. Four-high stacks would settle about 18 in. Stone columns stiffen the ground; Priebe’s improvement factor says how much, and the column size and spacing are adjusted until the settlement meets the 6-in. target.
| Variable | Value | Description |
|---|---|---|
| Clay | H = 18 ft; Cc = 0.45; e0 = 1.20; σ′0 = 1,100 psf; su = 450 psf | |
| Δσ | 1,800 psf | Four-high container stack |
| φ′c | 40° (Kac = 0.217) | Column stone |
| Target | S ≤ 6 in. |
Untreated settlement is about 18.6 in. Stone columns 36 in. in diameter at 4.5-ft square spacing (n0 = 3.52) bring it to about 5.3 in.
Carry the columns through the full 18 ft of clay, with angular 3/4- to 3-in. stone (φ′ ≥ 40°). Load test production columns (ASTM D1143) at about one per 100, minimum five, and place settlement plates in each quadrant of the stacking area to confirm the performance.
An access road subgrade on a Class I railroad located near Moose Jaw, Saskatchewan, is fat clay with a PI of 46. Lime lowers the plasticity and builds strength. The first estimate of the lime content uses the PI reduction rule; the design content is then confirmed in the laboratory.
| Variable | Value | Description |
|---|---|---|
| Soil | CH; LL 66, PL 20, PI 46 | |
| Sulfate | 850 ppm | Below the NLA review level of about 3,000 ppm |
| Proctor | γd,max = 93 pcf; wopt = 22% | Untreated |
| Target | PI < 12; qu,28 ≥ 50 psi (assumed) |
Use 7% hydrated lime (ASTM C977) mixed 12 in. deep, mellowed 24 to 48 hours and compacted to 98% of the treated Proctor.
Test the sulfate content of every borrow lot of about 500 yd³. If any lot exceeds about 3,000 ppm, stop and review the treatment under the NLA guidance (Section 7.2.7.1); switching to cement does not avoid sulfate heave. QC: phenolphthalein checks of distribution, PI at 1 and 7 days, and qu at 7 and 28 days (ASTM D2166).
A main line on a Class I railroad located in central Kansas has been surfaced again and again over a soft clay cut. A CPT sounding at the worst low spot shows ballast from about 2 ft to 6 ft below the top of tie. The roadmaster plans railroad-cement injection over 600 ft of track and asks how much slurry and how much dry cement to order, and how many tank loads that is.
| Variable | Value | Description |
|---|---|---|
| w, t | 8 ft, 4 ft | Width and thickness of the ballast pocket zone from the CPT sounding (2 to 6 ft below top of tie) |
| n | 20% | Void space in the pocket zone that slurry replaces (water and voids) |
| — | 7.48 gal/ft³ | Unit conversion |
| c | 5 lb/gal | Dry solids per gallon of railroad-cement slurry (specific gravity about 1.4, above the 1.25 minimum) |
| L | 600 ft | Length of track to treat |
| — | 20,000 gal | Slurry tank on the flat car |
Plan on about 48 gal of slurry and 240 lb of dry cement per track foot: 28,800 gal and 72 tons for the 600 ft, mixed in two tank loads.
The 20% void ratio is the weakest number in the calculation. It is assumed from the track geometry and maintenance history, not measured, so order some margin and use 48 gal per track ft as the target in the operator’s daily log. If the takes run well short, tighten the crib spacing or add a staged second pass into the skipped cribs. If they run well over, the pockets are larger than the sounding suggested. Because the cone will not push through set cement, check the result with borings for moisture and strength rather than a repeat CPT.
| Project | Railroad | Soft Soil | Method | Spacing/Grid | Improvement Factor | Pre-Treat S_c (in.) | Post-Treat S_c (in.) | Performance Met? |
|---|---|---|---|---|---|---|---|---|
| Coastal GA Embankment | Class I | CH clay, 35 ft | PVDs @ 1.5-ft tri | 1.5 ft | U_total = 90% | N/A (time) | 120 days | Yes |
| Port Arthur Yard | Class I | CH clay, 18 ft | Stone col., 36 in.@5 ft | Square 5 ft | n₀ = 3.2 | 18.6 | 5.8 | Yes |
| Moose Jaw Road | Class I | CH clay, PI=46 | 7% lime, 12-in. depth | N/A | PI: 46→11 | N/A | PI=11 | Yes |
| Winnipeg Terminal | Class I | Varved clay, 25 ft | DSM col., 24-in.@5 ft | Hex 5 ft | n₀ = 2.8 | 14.2 | 5.1 | Yes |
| Willamette Bridge | Class I | Loose sand, liq. | DSM panels + cols | 3 ft grid | FS_L: 0.67→1.35 | — | — | Yes |
| Passenger corridor Embankment | Passenger | Soft clay, 20 ft | PVDs @ 1.25-ft tri | 1.25 ft | U_total = 95% | — | 75 days | Yes |
| Atlanta Yard CL | Class I | CL clay, PI=22 | 5% lime, 12-in. depth | N/A | PI: 22→10 | N/A | PI=10 | Yes |




Miller describes the precedence diagramming method (PDM), in which boxes are activities and arrows are relationships. PDM allows four link types: finish-to-start (F-S), start-to-start (S-S), finish-to-finish (F-F) and start-to-finish (S-F). He considers F-S sufficient for almost every real situation and warns that the other three are seldom needed. A lag is a delay placed on a link. It is appropriate only for a true waiting period that uses no resources and is outside the manager’s control, such as shipping time. It should not be used to hide work, and because most software does not draw lags on the network, they show up only in the dates.
Two further points apply to duration estimates. First, the most common network flaw is building logic around limited resources; logic should assume unlimited resources, with resource conflicts resolved later during scheduling. Second, subject-matter experts usually estimate workload (hours of effort for an average performer), not duration. Duration is workload divided by the effective workday, the hours per day actually available to the activity: 48 hours ÷ 6 hours per day = 8 days. Where an estimate is uncertain, Miller uses a PERT weighted average, (optimistic + 4 × most likely + pessimistic) ÷ 6; with 6, 10 and 20 days the result is about 11 days.
For railroad work:
Source: Miller, D. P. (2009). Building a Project Work Breakdown Structure: Visualizing Objectives, Deliverables, Activities, and Schedules. ESI International Project Management Series. Boca Raton, FL: Auerbach Publications (CRC Press, Taylor & Francis Group), pp. 72–75, 105–109. Summarized and paraphrased. Full reference under Supplemental References.
Kelly, Male and Graham recommend weighting and scoring when several technically feasible options compete and none is clearly best. The first step is to agree on the criteria. Correlated criteria should be avoided because they count the same attribute twice; their example is that ease of cleaning and cost of cleaning should not both be used. Weights then come from a paired comparison. Each criterion is compared with every other, the more important of each pair is recorded, and each criterion’s number of “wins” becomes its weight. Each option is scored 1–5 against each criterion. Score is multiplied by weight and the products are summed. Sensitivity checks, made by changing a few weights and scores, show whether the ranking is robust.

Their worked example compares internal partitions for a building that is reorganized every two to six years. Eight criteria (demountability, noise attenuation, finish, support of fittings, concealing services, capital cost, maintenance cost and reliability of supply) received weights of 4, 6, 3, 0, 5, 3, 4 and 3. Stud-and-board partitions totaled 109 and plastered blockwork 104, while the proprietary systems scored 76–91, mainly because noise attenuation carried the highest weight. The authors say the result should prompt a second look rather than be accepted mechanically. Any preferred option must still be technically feasible, economically viable, functionally suitable and acceptable to the client.
For railroad work: The method suits ground improvement and subgrade remediation choices, such as undercut-and-replace versus geogrid-reinforced subballast versus lime or cement stabilization versus deep soil mixing. Typical criteria are track outage required, ability to work from the track or the right-of-way, settlement performance under the design traffic in MGT, construction risk in the expected soils, capital cost, maintenance demand and supply-chain or contractor availability. Derive the weights with the railroad’s engineering and operations staff in the room, because operations typically values outage time very differently from engineering. Keep capital cost as one weighted criterion, or compare it separately on a whole-life basis, and show the sensitivity run in the report so the choice can be audited.
Source: Kelly, J., Male, S. and Graham, D. (2004). Value Management of Construction Projects. Oxford: Blackwell Science, pp. 75–77, 308–310. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.
The ASCE Committee on Specifications defines two basic types of specification.
A performance specification has three requirements:
The guide compares the two types as follows:
Prescriptive specifications fit where the end result cannot be fully defined or where loss of design control is unacceptable. Performance specifications fit where end-result specification is normal practice, or where the contractor’s ingenuity is wanted. The two can be combined, as with concrete specified by both strength and mix limits, but they must not conflict on the same product or activity.
For “or equal” clauses, list the salient characteristics that will be used to judge equality. Read every reference standard before citing it, because standards contain options and may conflict with one another. Do not over-specify. Each tighter quality level or tolerance adds cost.
For railroad work: Ground improvement suits a performance or hybrid approach, because specialty contractors own the equipment and know-how. A deep soil mixing or grouting GSP for an embankment or subgrade might specify:
Avoid also fixing the binder dosage and mixing energy unless the railroad accepts responsibility for the result. Stone columns and PVDs are often specified prescriptively (spacing, length, material). In that case acceptance should be based on installation records, and settlement performance should not be made a separate contractual guarantee unless the design responsibility is transferred clearly.
Source: ASCE Construction Institute Committee on Specifications (L. Eckersley, Chair) (2013). Preparation of Construction Specifications for Civil Projects. Reston, VA: American Society of Civil Engineers, pp. 14–22. Summarized and paraphrased. Full reference under Supplemental References.
Sullivan et al. use breakeven analysis when the choice between two alternatives turns mainly on one uncertain factor. Write the equivalent worth (PW or annual worth) of each alternative as a function of that factor, set the two expressions equal, and solve for the factor. If the best estimate of the factor lies above the breakeven value, one alternative wins; if below, the other does. The method works the same way for a single project: set its equivalent worth to zero and solve for the factor.
Factors commonly tested this way are annual expenses, interest rate, service life, and hours of use. In their examples, a hybrid car beats a conventional car only above a fuel price of $3.64/gal. Three motors trade places at 1,694 and 4,389 operating hours per year. In each case the analysis gives the decision-maker one number to argue about instead of a whole cash-flow table.
For railroad work: the classic case is ground improvement or undercutting compared with continued spot maintenance at a chronic soft subgrade or mud spot. The uncertain factor is how many maintenance interventions a year the location really needs. Each intervention includes surfacing, ballast, flagging, and the train-delay cost of the slow order that follows. As an illustration only, with inputs chosen for the example:
If track inspection records show the spot being surfaced six times a year, the fix is justified. If it is surfaced twice a year, it is not, unless safety risk or capacity value changes the picture. Two other breakeven tests are useful: the service life the improvement must achieve, and the first cost at which it stops paying. Present these breakeven values to the client rather than a single net present worth, because they show plainly which input the decision depends on. They also show which records to check, such as maintenance-of-way work orders and slow-order logs.
Source: Sullivan, W. G., Wicks, E. M. and Koelling, C. P. (2015). Engineering Economy, 16th ed. Upper Saddle River, NJ: Pearson, pp. 476–482. Summarized and paraphrased. Full reference under Supplemental References.
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
Checklist · Part VII · Stabilization Methods
Levy (2007) describes how a contractor builds a formal Construction Quality Control Plan (CQCP). A qualified CQCP manager owns the plan in the same way a safety director owns the safety program. The plan should include, at a minimum, an organization chart locating the CQCP manager, proposed personnel, designated authorities and their duties, operating procedures for inspections, tests and documentation, a subcontractor and vendor rating system, help in selecting quality-oriented subcontractors, training for field staff, and field inspection report forms.
The core tool is the inspection checklist: a short, numbered list of the quality points for one work type, signed and dated by the inspector. Levy’s concrete placement checklist, for example, runs from approved shop drawings on site and the correct strength ordered, through form and rebar approval, testing requirements (slump, number of cylinders, temperature), vibration, curing, and hot- or cold-weather protection. Similar lists can be prepared for every trade with help from an engineer or a qualified subcontractor. Checklists serve as a guide for less experienced supervisors and also signal that quality matters; copies can be given to the subcontractor to document compliance or deficiencies.
His inspection tips: check quality on every walkthrough and at least weekly; notify the subcontractor promptly of unacceptable work and set a date for correction, then verify it; if poor work continues, bring the subcontractor’s owner or the manufacturer’s representative to the site and confirm the meeting in writing; and walk the work for a punch list before a subcontractor demobilizes.
For railroad work: Ground improvement under or beside track lends itself to this method because acceptance depends on records produced as the work is done. A checklist for each technique (stone columns, jet grouting, compaction grouting, deep soil mixing, PVDs, geosynthetic placement) might cover approved submittal and mix design on site, layout against track stationing and clearance envelopes, installation parameters logged per element (depth, pressure, volume, time), spoil and heave observations, track surface monitoring during work near live track, sampling and testing frequency, and nonconformance actions. Signed checklists, combined with the element logs, give the railroad a defensible basis for accepting work that cannot be seen once it is installed.
Source: Levy, S. M. (2007). Project Management in Construction, 5th ed. New York: McGraw-Hill, pp. 220–227. Summarized and paraphrased. Full reference under Supplemental References.
Investigation Phase (Pre-Design)
Design Phase
Construction Phase
Deliverable Phase
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
A railroad bridge approach embankment is to be built over 40 ft of soft clay, and wick drains are planned at the spacing shown to speed consolidation. The railroad wants to lay track 90 days after the fill is placed. The engineer must compute the degree of radial consolidation at 90 days and comment on the drain spacing.
| Variable | Value | Description |
|---|---|---|
| ch | 0.015 ft²/day | |
| s | 1.5 ft triangular; de = 1.575 ft | |
| dw | 0.196 ft | |
| t | 90 days |
Ur ≈ 96% at 90 days.
The 1.5-ft spacing is more than needed: 1.7 ft gives about 90% with 22% fewer drains (1.75 ft gives only 88%). Check with smear before opening the spacing.
A new railroad yard embankment is predicted to settle 15 in. on untreated soft ground, but the railroad wants no more than 6 in. Stone columns of the diameter and friction angle shown are proposed at a trial square spacing of 6.0 ft. The engineer must find the improvement factor and settlement and adjust the spacing to meet the target.
The method of Example 7.2-2.
| Variable | Value | Description |
|---|---|---|
| Columns | 30 in. diameter (Ac = 4.909 ft²) | |
| Trial spacing | 6.0 ft square | |
| φ′c | 40° | |
| Sc | 15 in. | Untreated |
| Target | 6 in. |
At 6.0 ft the settlement is about 8.6 in.; 30-in. columns at 4.5-ft square spacing bring it to 6.0 in.
The improvement factor depends almost entirely on the area ratio, so spacing is the main design lever; larger columns at the same spacing do the same job.
A railroad yard lead is to be built on a fat clay subgrade with the plasticity index shown, and lime treatment is proposed to bring the PI down to 12. A soil test found 1,200 ppm sulfate. The engineer must estimate the lime content and decide whether the sulfate level is a concern for heave.
The method of Example 7.2-3.
| Variable | Value | Description |
|---|---|---|
| PI | 52 | CH clay |
| Target PI | 12 | |
| Sulfate | 1,200 ppm |
About 8.0% hydrated lime (ASTM C977). Sulfate at 1,200 ppm is acceptable.
Retest each lot of about 500 yd³ during construction; sulfate varies within a deposit. If any sample exceeds about 3,000 ppm, review the treatment; cement is subject to sulfate heave too.
A lean clay fill is being placed for a new railroad embankment. A field density test on the latest lift gave the density and moisture shown, and the railroad’s specification requires 95% of Modified Proctor within 2% of optimum moisture. The inspector must decide whether the lift is accepted.
| Variable | Value | Description |
|---|---|---|
| γd,max, wopt | 105 pcf; 16% | |
| γd,field, w | 99.5 pcf; 18% | |
| Spec | 95% Modified Proctor; w within ±2% of optimum |
Not acceptable: RC = 94.8%, below 95%, and the moisture is at the wet limit.
Scarify, dry back toward optimum, recompact and retest. Wet-side CL loses strength and settles more, so dry-back is usually more effective than extra passes.
Deep soil mixing is proposed under a new high-speed passenger track built over soft clay, with the field strength, area replacement ratio and moduli shown. The engineer must set the laboratory strength the mix design must reach and estimate the composite modulus and the reduction in track settlement.
| Variable | Value | Description |
|---|---|---|
| qu,field | 75 psi | Target |
| flab | 0.25 | Field-to-laboratory strength ratio |
| aDSM | 0.25 | Area replacement ratio |
| Esoil | 500 psi | Soft clay |
| EDSM | 300 qu,field | Midpoint of 150 to 500 |
Specify 300 psi in the laboratory; the composite modulus is about 6,000 psi, twelve times the untreated clay.
A 3-in. untreated settlement would fall to about 0.25 in., within the 0.375-in. Class 7 limit (Table 6.2-1). Verify the field-to-laboratory ratio with wet-grab or core samples early in production; it is the least certain number here.
A Class I railroad located in Ohio needs a box culvert jacked under two main tracks through saturated silty sand below the water table. Dewatering is ruled out because it would settle the track, so the contractor proposes freezing a block of ground around the culvert path with liquid nitrogen for a six-week drive. The railroad’s engineer must estimate the frozen volume, the heat to be removed, the nitrogen needed, and the possible heave of the track (Section 7.2.19).
| Variable | Value | Description |
|---|---|---|
| Frozen block | 20 ft wide × 14 ft high × 60 ft long | Around the culvert path, below both tracks |
| γd, w | 105 pcf and 0.20 | Saturated silty sand |
| LN2 use | 1,350 lb/yd³ initial; the same quantity again every 2 to 3 weeks | Preliminary values (Table 7.2-20) |
| Duration | 6 weeks | Jacking period after initial freeze |
| Expansion | 9% | Water to ice by volume |
(a) About 622 yd³. (b) About 51 million Btu of latent heat. (c) About 840,000 lb initially and 2.5 to 3.4 million lb in total. (d) Up to about 5 in. of heave, possibly more in silt.
Several inches of heave under two main tracks is not acceptable without control. Ask the contractor to keep the frozen zone below the track structure, freeze in stages, monitor track geometry continuously with action levels and slow orders, and plan for thaw settlement afterward. The nitrogen quantity, roughly 60 to 80 tanker loads, shows why brine freezing is usually cheaper for jobs lasting several weeks, with nitrogen kept for fast freezing or emergencies. These quantities are preliminary; the freezing contractor designs the system.
| Topic | Refer To |
|---|---|
| Laboratory consolidation parameters (c_v, C_c, e₀) | Chapter 5.2, Sections 5.2.8–5.2.9 |
| Settlement analysis — untreated and surcharge | Chapter 6.2, Sections 6.2.4–6.2.8 |
| Slope stability — staged embankment loading | Chapter 6.3, Section 6.3.6 |
| Seismic liquefaction — DSM and stone column mitigation | Chapter 6.5, Section 6.5.7 |
| Bearing capacity of improved ground | Chapter 6.1, Sections 6.1.3–6.1.4 |
| Subgrade improvement for pavement | Chapter 7.3, Sections 7.3.6–7.3.7 |
| Compaction testing — nuclear gauge, sand cone | Chapter 5.3, Sections 5.3.1–5.3.2 |
| Geotechnical Special Provisions — ground improvement | Appendix C |
| Monitoring instrumentation — settlement plates, piezometers | Chapter 5.3, Section 5.3.5 |

End of Chapter 7.2 — Ground Improvement Methods
Sections 7.2.2 through 7.2.8 describe how each family of ground improvement works and how it is designed for railway loading. This library carries the supporting technology sheets: 45 techniques, numbered 7.2.16.1–7.2.16.45 in alphabetical order and grouped below by category. Each sheet opens with a how-it-works schematic and key figures, followed by its fact sheet, design guidance, QC/QA, specifications, cost information and case histories. Use the Previous / Next buttons at the bottom of each sheet to step through the library in order.



The sheets most relevant to each method are also linked at the end of Sections 7.2.2–7.2.8. Soil nailing, MSE walls and deep foundation sheets support Chapter 7.1 — Retaining Structures and Chapter 6.1 — Bearing Capacity.
Section 7.2.16 · Selection guide
Find the problem on the cross-section, read the section that explains the method, then open the technology sheets to compare options.
Soft, compressible clay under new or widened embankment
Loose sand or silty sand — settlement or liquefaction
Weak or pumping subgrade under track, yard or access road
Voids, sinkholes, abandoned mines or culvert backfill loss
Foundations near live track / limited headroom
Click a number on the cross-section to jump to its card. Some technologies, such as aggregate columns, jet grouting, and excavation and replacement, serve more than one problem. Technology sheets open on dirtbert.com.
Open the selection guide on its own page (for printing) →
Technology sheets compiled from FHWA, SHRP2 GeoTechTools and manufacturer literature; each sheet lists its own sources.
Field case studies by Burt G. Look, from Earthworks: Theory to Practice – Design and Construction (CRC Press/Balkema, 2023), chosen for this chapter’s topics. Each is summarized from the book with its key figures and a closing note on railroad application added by the authors of this manual. Credit for the case material belongs to Look; see item S12 under Supplemental References.
Related section: 7.2.2 Compaction Methods
Three trial embankments were built from extremely to slightly weathered rock taken from site cuttings: sandstone, basalt, and interbedded siltstone/sandstone. All of it broke down to meet “soil” specifications during placement and rolling (Look and Lacey, 2017). A 20.6-ton vibrating padfoot and a 19-ton smooth drum roller compacted each fill at field and targeted moisture.
Pile-driving monitors (PDM), which normally record set and energy for each hammer blow, tracked reflectors on the rollers. They measured each pass’s set, vibration frequency, amplitude, peak velocity and acceleration, and so the peak compaction force, which is not the same as static weight. Findings:
Table 17-LK1. Padfoot roller, manufacturer’s values against PDM measurements (after Look 2023, Table 7.13)
| Parameter | Manufacturer | Measured with PDM, three fills |
|---|---|---|
| Vibration frequency | 29 Hz high amp., 31 Hz low | 27.2–30.9 Hz (range) |
| Roller speed | 0–7 mph | median 2.8 mph |
| Amplitude | 0.071 in. high, 0.047 in. low | medians 0.055–0.087 in. |
| Force | 71 kips high amp., 52 kips low | medians 53–83 kips |
For railroad work: a pass-count specification without a check of the roller’s actual output can over-work weathered-rock fill. A trial embankment with measured rebound is a sound way to set the pass count for a large rail embankment.


Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §7.10, pp. 232–236. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.
Related section: 7.2.3 Prefabricated Vertical Drains (PVDs) with Staged Loading
At the Port of Brisbane reclamation, wick-drain rigs had to work for nine months on 31 acres of dredged sand, about 8.2 ft thick, over Holocene clay with a design undrained strength of 104 psf in the top 20 ft (Look and Honeyfield, 2016). Mud waves during filling left the sand thickness uncertain. BR470 is outside its range here, both for clay under 420 psf and for platform thickness to load width (D/W) above 1.5; it was used for the preliminary design for want of anything better.
Loads. The heaviest rig did not exert the highest pressure: the 50-ton CAT on narrower tracks produced 3,500 psf against 2,030 psf for the 89-ton machine. Check every rig.
Parameters. 27 LFWD tests, 8 DCPs and 4 borehole shear tests gave the sand properties. Two proof-roll passes raised the LFWD modulus by about 20% and reduced its scatter (10th percentile 4,400 psi rolled against 3,260 psi unrolled). Groundwater was found at 6.2–10 ft, not the 20 in. assumed. Clay directly under the sand measured 42–380 psf.
Four answers.
Proof rolling as the check. A loaded proof truck will bog rather than topple, while an eccentrically loaded rig can topple, so the truck is the safer test. Proof rolling only means something with a defined vehicle and an acceptance deflection. A rock-filled truck loaded more evenly than a water truck (whose load sloshes) and was preferred. Mean ruts were 3.7 in. after one pass and 5.2 in. after two, and 4.7 in was adopted as the acceptance criterion.
Table 17-LK2. Wick-drain rigs and track pressures (after Look 2023, Table 12.20)
| Rig | Weight (tons) | Track width (ft) | Critical track pressure |
|---|---|---|---|
| Komatsu excavator | 65 | 3 | 2,700 psf |
| CAT excavator | 50 | 3 | 3,500 psf |
| Komatsu excavator | 89 | 4.3 | 2,030 psf |
For railroad work: ground improvement under new embankments on soft soil, such as wick drains for a yard expansion or a new grade across a marsh, puts the rigs on exactly this kind of platform. Size it by more than one method and calibrate the proof roll before the rigs move on.


Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §12.7, pp. 432–446. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.
Related section: 7.2.7 Lime and Cement Stabilization
Prolonged rain in 2010/11 triggered a 656 ft landslide under a Sunshine Coast hinterland road, in colluvium up to 20 ft thick below a steep escarpment (Look 2012; Chew et al. 2012; Boyer et al. 2013). Five remediation options were compared on total internalised cost: construction cost plus embodied energy, greenhouse-gas emissions from fuel, transport and materials, and the cost of damage to local roads from heavy trucks hauling material. Environmental costs ranged from 2% to 23% of construction cost.
Options 3 and 4 had the lowest totals. Option 3 was chosen because the road authority wanted the fewest heavy trucks on local roads, and lime treatment let the high-plasticity “unsuitable” colluvium be screened of boulders and reused. With 4% hydrated lime cured seven days, shear box cohesion rose from about 420 psf to 1,250–2,200 psf at a similar friction angle; the design still used a softened cohesion of 104 psf.
The work was done in five stages with soil-nailed temporary slopes, drainage slots and regular inclinometer and survey monitoring. When inclinometer 2 showed excessive movement, inspection found a tree at the crown destabilized by the excavation. Once it was felled, the movement stopped.
Table 17-LK3. Remediation options, 2011 AU$ (after Look 2023, Table 12.23, from Chew et al. 2012)
| Option | Construction | Environmental | Total internalised |
|---|---|---|---|
| 1. Cast-in-place pile wall with ground anchors* | 3,300,000 | 67,000 | 3,367,000 |
| 2. Rockfill buttress | 3,800,000 | 628,000 | 4,428,000 |
| 3. Reinforced fill slope, lime-treated local soil | 2,400,000 | 278,000 | 2,678,000 |
| 4. Reinforced fill slope, imported granular fill | 2,000,000 | 452,000 | 2,452,000 |
| 5. Earth fill embankment with rock toe | 3,200,000 | 444,000 | 3,644,000 |
| * Greatest technical uncertainty. | |||
For railroad work: slide repairs on remote lines face the same haul-cost and community questions. Reusing treated local soil cuts truck traffic on rural roads, and staged excavation with inclinometers is the standard of care on an active slide.


Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §12.8, pp. 446–448. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.
Related section: 7.2.8 Geosynthetic Reinforcement
A bridge pier at the edge of a creek, with the next pier 8 ft into it, needed a platform for a BG28 piling rig for a day and an outrigger crane for beam lifting. The temporary-works designer rightly declined to design it with the standard method, since slope stability over soft clay governed. Sheet piling would have cost almost five times the roughly AU$100,000 (2015) platform. Moving the pier about 10 ft would have removed the problem, which shows why constructability belongs in design.
A deep rock-fill replacement moved the critical slip surface deeper, with high-strength geogrids within the rock fill. Stability was checked separately for standing (uniform 3,800 psf, FS 1.5, above the 1.3 usually accepted for temporary works), penetrating (uniform and trapezoidal, FS 1.3) and extracting. The extracting case was the most critical (FS 1.2) even though its 5,500 psf design pressure is lower than penetration’s 6,400 psf, because of where the load sits. Large plate load tests were run but cannot test a deep slip surface, so an excavator was walked along the edge first. The work went without incident, though rig depressions had to be repaired before the outrigger came on.
Table 17-LK4. Design pressures for the BG28 piling rig (after Look 2023, Table 12.19)
| Operation | Design pressure | Factor of safety adopted |
|---|---|---|
| Handling / transporting / standing | 3,780 psf | 1.5 |
| Penetration | 6,390 psf | 1.3 |
| Extracting | 5,470 psf | 1.2 (critical, trapezoidal) |
For railroad work: bridge replacement platforms beside streams and next to embankment slopes need a global stability check for each rig operation, not only a bearing check. The extract phase and the outrigger reactions are often the governing cases.

Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §12.6, pp. 430–432. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.
This section collects findings from the proceedings of a United States–China workshop on ground improvement technologies (ASCE Geotechnical Special Publication 188, 2009) that add to the methods in this chapter. Thirty-three papers cover column-supported embankments, column technologies, deep mixing, jet grouting, accelerated consolidation and new materials. The findings that change how a method is designed, specified or checked are placed in orange supplemental boxes in the sections they apply to; this section summarizes them, adds the remaining items, and lists every paper used.
Most of the field cases are highway, building and dam projects. They transfer to railroad work with one important difference: track loading is repeated, and track tolerates much less differential movement than a pavement does. Treat the findings on repeated loading, differential settlement and transitions as the most important for railroad use.
| Topic | Finding | Railroad use | Section |
|---|---|---|---|
| Column-supported embankments | Arching is complete when fill height is at least 1.1–1.5 × clear cap spacing; Nordic guideline best matched field data; floating columns leave 50–60% of settlement below the tips | Approach fills, new track on soft ground | 7.2.8 |
| Column-supported embankments under repeated load | Geogrid cut permanent deformation about 25%; geogrid tension keeps growing with cycles | Any column-supported track | 7.2.8 |
| Columns under side slopes | Unreinforced columns in the shear zone fail in bending; full shear credit overstates stability | Widenings, approach fills | 7.2.8, Ch. 6.3 |
| Geosynthetic over caps | Round caps and diagonal strand orientation lower peak strain | Load transfer platforms | 7.2.8.3 |
| Stone columns in silty sand | Add wick drains; gains fall from ~114% to ~70% as fines rise 30% to 43%; little effect at ≥15% clay-size | Liquefaction under approaches | 7.2.4, Ch. 6.5 |
| Acceptance by shear wave velocity | Velocity target from earthquake magnitude, converted to void ratio and column spacing | Corridor-length liquefaction treatment | 7.2.4, Ch. 5.1 |
| Deep soil mixing in expansive clay | 25:75 lime:cement, about 337 lb/yd³, water-to-binder 1.0; reduced swell and shrink over two years | Turnouts, crossings, approaches on expansive clay | 7.2.5 |
| Deep-mixing uniformity | Core resistivity measures mixing; double-slurry mixing more uniform | Deep-mixing QA | 7.2.5 |
| Composite columns | Concrete or steel core in a soil-cement column; capacity can exceed a bored pile of the same size | High fills, approach embankments | 7.2.5 |
| Inclined compaction grouting | Heave grows with inclination; little change beyond ~70°; depth beyond ~5 diameters adds little at 10–30° | Grouting under track from the shoulder | 7.2.6 |
| Large-diameter jet grouting | Columns 2.6–10.8 ft; poor mixing in sand below water; small columns in stiff clay | Excavation support and cutoffs beside track | 7.2.6 |
| Vacuum preloading | No stability risk during loading; settlement >3 ft and vane strength doubled in case study | Yards and embankments on very soft clay | 7.2.3 |
| Staged construction of tall fills | PVDs cut stage time from ~15 to ~2 years; transitions to abutments need most care | Tall fills, bridge approaches | 7.2.3, Ch. 6.2 |
| Dynamic compaction of dumped fill | Improved rock-and-soil fill to ≥20 ft; bearing above 9,000 psf; depth confirmed by GPR | Old end-dumped fills on mountain grades | 7.2.2 |
| Explosive replacement | Blast-driven replacement of soft clay with stone; dense in top 16–20 ft | Remote new alignments only | 7.2.2 |
| Lime sludge; organosilane; alkaline slag | Sludge acts like lime (use strength, not pH, to set content); organosilane cut erosion ~50×; slag usable as fill | Fill treatment, slope erosion control, yard fill | 7.2.7 |
| Geogrid pullout | Bearing on transverse ribs is the main resistance | Platforms and walls | 7.2.8, Ch. 7.1 |
Papers in Han, J., Zheng, G., Schaefer, V. R. and Huang, M. (eds.) (2009), Advances in Ground Improvement: Research to Practice in the United States and China, ASCE Geotechnical Special Publication 188, Reston, VA. Summaries are paraphrased and values converted to English units.
Thermal methods change the ground by removing or adding heat. Artificial ground freezing turns pore water into ice, giving the soil very high temporary strength and making it nearly watertight within hours to weeks. Heat treatment bakes clay at several hundred degrees and changes it permanently. Freezing is a specialist but established method; heat treatment is mostly of historical interest because of its fuel use (Hausmann 1990).
Freezing works in almost any soil or rock with enough pore water, which sets it apart from grouting. It fails where groundwater flows fast enough to carry heat in faster than the pipes remove it, so seepage velocity must be checked (pumping tests, Chapter 2.8) before freezing is chosen.
Frozen soil is a four-phase material: solids, ice, unfrozen water and air. Some water stays unfrozen well below 32°F, especially in clay and in salty pore water, and this unfrozen water explains why frozen-soil strength and stiffness depend so strongly on temperature. Artificial freezing runs much colder (−4°F to −256°F) than natural frost, and the ice lenses form parallel to the freeze pipes rather than to the ground surface.
| Material | qu (psi) | qu (tsf) |
|---|---|---|
| Pure ice | 220 | 16 |
| Frozen sand | 1,450 | 104 |
| Frozen silt | 580 | 42 |
| Frozen clay | 290 | 21 |
Water expands about 9% when it freezes. Saturated fine-grained soils under low confining stress can heave much more than that, because water migrates to the freezing front and builds ice lenses. When the ground thaws, the ice lenses melt and the soil consolidates, so settlement can follow. Thaw also returns the soil to, or below, its original strength: freezing is a temporary support, not a permanent improvement.
| Circulating brine | Liquid nitrogen (LN2) | |
|---|---|---|
| Coolant | Calcium chloride brine in a closed loop; lowest theoretical temperature −67°F | Liquid nitrogen vented to the air after passing through the pipes, or injected into porous soil; −321°F |
| Time to freeze | Days to weeks, depending on soil, water content, brine temperature and pipe spacing (typically about 2 to 4.5 ft) | Hours; suited to emergencies and active seepage |
| Quantity | Refrigeration plant runs continuously | About 1,000 to 3,200 lb of LN2 per yd³ of soil for initial freezing (about 1,350 lb/yd³ for preliminary estimates); the same quantity again maintains the frozen state for about 2 to 3 weeks |
| Other | Lower cost for long jobs. A pipe leak releases brine that can thaw the frozen zone and contaminate groundwater | Higher frozen strength allows thinner walls and less ice-lens heave; requires closer control and monitoring; the gas is not toxic but displaces oxygen in confined spaces |
Heat to remove. The latent heat of the pore water dominates: L = 144 γd w Btu/ft³ (Eq. 7.2-1), where γd is the dry unit weight (pcf), w the water content (decimal) and 144 Btu/lb the heat of fusion of water. A soil with γd = 100 pcf and w = 0.25 needs about 3,600 Btu/ft³ of latent heat alone, plus the sensible heat to cool it.
Freeze wall for a circular shaft. The simplest (elastic, Lamé) estimate of the thickness of a frozen ring around an opening of radius a under lateral earth and water pressure p0 is d = a [ (qu / (qu − 2 p0))0.5 − 1 ] (Eq. 7.2-2), with qu chosen for the design temperature, strain and duration. More advanced elastic-plastic and creep formulas exist; a specialty contractor normally designs the freeze.
Monitoring. Thermocouples or temperature probes in the frozen zone and on the coolant lines; survey and inclinometers for heave and creep movement. Ultrasonic measurements can sometimes confirm frozen thickness.
Heating clay above about 750°F (400°C) causes permanent mineral changes: the clay loses lattice water, plasticity drops and strength and durability rise. Past methods used moving surface furnaces for roads and burners in boreholes to stabilize embankments and waste deposits; each borehole treated a zone about 3 ft in radius. Fuel use is high, about 10 to 20 gallons of fuel oil per cubic yard of soil, so the method is rarely economical today except where the ground already contains fuel or waste.
For railroad work: Freezing is most likely on a railroad project as support for a jacked, bored or mined crossing under the track through running sand or silt below the water table, or to cut off seepage in a deep excavation beside the track where dewatering would cause settlement (Section 7.1.17). The frozen zone heaves as it forms and settles as it thaws, and both move the track: keep the frozen zone below the track structure where possible, set track geometry and settlement monitoring with action levels and slow orders for both the freezing and the thaw periods, and plan for thaw consolidation after the crossing is complete. Brine leaks under the track can thaw the wall locally, so ask how leaks are detected and isolated. Confirm the groundwater velocity before relying on freezing, and coordinate with utilities in the right-of-way, which can be damaged by frost heave or act as heat sources.
Source: Hausmann (1990), Chapter 15. Full reference under Supplemental References.
Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
File locations for these documents are listed under Supplemental References.
Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After UFC 4-860-01FA (2004)” draw on item S10 and are rewritten for railroad clients. Blocks marked “After Selig & Waters (1994)” summarize item S11 for railroad clients; tables are condensed from the book and its figures are not reproduced. The Case Studies section summarizes case studies from item S12 by Burt G. Look; its figures are reproduced from the book for internal reference use, and the closing “For railroad work” note in each case study is added by the authors of this manual. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.
The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.