Chapter 7.3 — Pavement Subgrade Evaluation

Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
Authors: Daniel P. Colwell and Mario Ruel

Primary Reference: USACE EM 1110-1-1804, Geotechnical Investigations (January 2001); AASHTO Guide for Design of Pavement Structures (1993); AASHTO M 145-91; ASTM D1883 (CBR); ASTM D4318 (Atterberg Limits); NCHRP Project 1-37A (M_r); AREMA MRE Chapter 1 (Roadway and Ballast); FRA Track Safety Standards 49 CFR Part 213.

Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database

Subgrade, compaction and frost values for pavement subgrade evaluation. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.

Subgrade support (CBR and IBR) (35 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
California bearing ratio (soaked, design)Competent broken rock, gravel sizesGW, GPDrainage: All20%LOOK T13.9, p.183
California bearing ratio (soaked, design)Competent broken rock with some fines; gravels, sandsGM, GC, SW, SPDrainage: All15%LOOK T13.9, p.183
California bearing ratio (soaked, design)Sands, silty or clayeySM, SCDrainage: Good10%LOOK T13.9, p.183
California bearing ratio (soaked, design)Sands, silty or clayeySM, SCDrainage: Poor7%LOOK T13.9, p.183
California bearing ratio (soaked, design)Inorganic silts, low plasticityMLDrainage: Poor5%LOOK T13.9, p.183
California bearing ratio (soaked, design)Inorganic silts (high plasticity) and claysMH, CL, CHDrainage: Good3%LOOK T13.9, p.183
California bearing ratio (soaked, design)Inorganic silts (high plasticity) and claysMH, CL, CHDrainage: Poor3%LOOK T13.9, p.183
California bearing ratioHeavy clayPI = 70; water table >2 ft below formation2%CB T7.2, p.166
California bearing ratioHeavy clayPI = 70; water table <2 ft below formation1%CB T7.2, p.166
California bearing ratioHeavy clayPI = 60; water table >2 ft below formation2%CB T7.2, p.166
California bearing ratioHeavy clayPI = 60; water table <2 ft below formation1.5%CB T7.2, p.166
California bearing ratioHeavy clayPI = 50; water table >2 ft below formation2.5%CB T7.2, p.166
California bearing ratioHeavy clayPI = 50; water table <2 ft below formation2%CB T7.2, p.166
California bearing ratioHeavy clayPI = 40; water table >2 ft below formation3%CB T7.2, p.166
California bearing ratioHeavy clayPI = 40; water table <2 ft below formation2%CB T7.2, p.166
California bearing ratioSilty clayPI = 30; water table >2 ft below formation5%CB T7.2, p.166
California bearing ratioSilty clayPI = 30; water table <2 ft below formation3%CB T7.2, p.166
California bearing ratioSilty clayPI = 20; water table >2 ft below formation6%CB T7.2, p.166
California bearing ratioSilty clayPI = 20; water table <2 ft below formation4%CB T7.2, p.166
California bearing ratioSilty clayPI = 10; water table >2 ft below formation7%CB T7.2, p.166
California bearing ratioSilty clayPI = 10; water table <2 ft below formation5%CB T7.2, p.166
California bearing ratioSiltWater table >2 ft below formation2%CB T7.2, p.166
California bearing ratioSiltWater table <2 ft below formation1%CB T7.2, p.166
California bearing ratioSand, poorly gradedNon-plastic; water table >2 ft below formation20%CB T7.2, p.166
California bearing ratioSand, poorly gradedNon-plastic; water table <2 ft below formation10%CB T7.2, p.166
California bearing ratioSand, well gradedNon-plastic; water table >2 ft below formation40%CB T7.2, p.166
California bearing ratioSand, well gradedNon-plastic; water table <2 ft below formation15%CB T7.2, p.166
California bearing ratioSandy gravel, well gradedNon-plastic; water table >2 ft below formation60%CB T7.2, p.166
California bearing ratioSandy gravel, well gradedNon-plastic; water table <2 ft below formation20%CB T7.2, p.166
Illinois bearing ratioIllinois soilsA-11527.540%IDOT T5.5.16-1, p.184
Illinois bearing ratioIllinois soilsA-2-4, A-2-581420%IDOT T5.5.16-1, p.184
Illinois bearing ratioIllinois soilsA-2-6, A-2-761320%IDOT T5.5.16-1, p.184
Illinois bearing ratioIllinois soilsA-351015%IDOT T5.5.16-1, p.184
Illinois bearing ratioIllinois soilsA-4, A-5, A-62610%IDOT T5.5.16-1, p.184
Illinois bearing ratioIllinois soilsA-7-5, A-7-614.58%IDOT T5.5.16-1, p.184
Open this set in the database ↗
Compaction (168 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Maximum dry unit weightGravel–sand, well graded, cleanGWAASHTO T 99127.3132.1136.9pcfCB T3.2, p.80
Optimum moisture contentGravel–sand, well graded, cleanGWAASHTO T 9989.511%CB T3.2, p.80
Maximum dry unit weightGravel–sand, poorly graded, cleanGPAASHTO T 99117.8122.5127.3pcfCB T3.2, p.80
Optimum moisture contentGravel–sand, poorly graded, cleanGPAASHTO T 991112.514%CB T3.2, p.80
Maximum dry unit weightGravel–sand, well graded, small silt contentGMAASHTO T 99121128.9136.9pcfCB T3.2, p.80
Optimum moisture contentGravel–sand, well graded, small silt contentGMAASHTO T 9981012%CB T3.2, p.80
Maximum dry unit weightGravel–sand, well graded, small clay contentGCAASHTO T 99117.8122.5127.3pcfCB T3.2, p.80
Optimum moisture contentGravel–sand, well graded, small clay contentGCAASHTO T 99911.514%CB T3.2, p.80
Maximum dry unit weightSand, well graded, cleanSWAASHTO T 99111.4122.5133.7pcfCB T3.2, p.80
Optimum moisture contentSand, well graded, cleanSWAASHTO T 99912.516%CB T3.2, p.80
Maximum dry unit weightSand, poorly graded, small silt contentSPAASHTO T 99101.9111.5121pcfCB T3.2, p.80
Optimum moisture contentSand, poorly graded, small silt contentSPAASHTO T 991216.521%CB T3.2, p.80
Maximum dry unit weightSand, well graded, small silt contentSMAASHTO T 99111.4119.3127.3pcfCB T3.2, p.80
Optimum moisture contentSand, well graded, small silt contentSMAASHTO T 991113.516%CB T3.2, p.80
Maximum dry unit weightSand, well graded, small clay contentSCAASHTO T 99108.2117.8127.3pcfCB T3.2, p.80
Optimum moisture contentSand, well graded, small clay contentSCAASHTO T 99111519%CB T3.2, p.80
Maximum dry unit weightSilts, low plasticityMLAASHTO T 9995.5108.2121pcfCB T3.2, p.80
Optimum moisture contentSilts, low plasticityMLAASHTO T 99121824%CB T3.2, p.80
Maximum dry unit weightClays, low plasticityCLAASHTO T 9995.5108.2121pcfCB T3.2, p.80
Optimum moisture contentClays, low plasticityCLAASHTO T 99121824%CB T3.2, p.80
Maximum dry unit weightOrganic silts, low plasticityOLAASHTO T 9982.892.3101.9pcfCB T3.2, p.80
Optimum moisture contentOrganic silts, low plasticityOLAASHTO T 992126.532%CB T3.2, p.80
Maximum dry unit weightSilts, high plasticityMHAASHTO T 997082.895.5pcfCB T3.2, p.80
Optimum moisture contentSilts, high plasticityMHAASHTO T 99243240%CB T3.2, p.80
Maximum dry unit weightClays, high plasticityCHAASHTO T 9982.895.5108.2pcfCB T3.2, p.80
Optimum moisture contentClays, high plasticityCHAASHTO T 991927.536%CB T3.2, p.80
Maximum dry unit weightOrganic silts/clays, high plasticityOHAASHTO T 9966.884.3101.9pcfCB T3.2, p.80
Optimum moisture contentOrganic silts/clays, high plasticityOHAASHTO T 99213345%CB T3.2, p.80
Maximum dry unit weightWell-graded gravel–sand mixturesA-1AASHTO T 99117.8127.3136.9pcfCB T3.3, p.81
Optimum moisture contentWell-graded gravel–sand mixturesA-1AASHTO T 9951015%CB T3.3, p.81
Maximum dry unit weightSilty or clayey gravel and sandA-2AASHTO T 99111.4124.2136.9pcfCB T3.3, p.81
Optimum moisture contentSilty or clayey gravel and sandA-2AASHTO T 99913.518%CB T3.3, p.81
Maximum dry unit weightPoorly graded sandsA-3AASHTO T 99101.9111.5121pcfCB T3.3, p.81
Optimum moisture contentPoorly graded sandsA-3AASHTO T 9958.512%CB T3.3, p.81
Maximum dry unit weightSilty sands and gravels of low plasticityA-4AASHTO T 9995.5111.4127.3pcfCB T3.3, p.81
Optimum moisture contentSilty sands and gravels of low plasticityA-4AASHTO T 99101520%CB T3.3, p.81
Maximum dry unit weightElastic silts, diatomaceous or micaceousA-5AASHTO T 9985.993.9101.9pcfCB T3.3, p.81
Optimum moisture contentElastic silts, diatomaceous or micaceousA-5AASHTO T 992027.535%CB T3.3, p.81
Maximum dry unit weightPlastic clay, sandy clayA-6AASHTO T 9995.5108.2121pcfCB T3.3, p.81
Optimum moisture contentPlastic clay, sandy clayA-6AASHTO T 99102030%CB T3.3, p.81
Maximum dry unit weightHighly plastic or elastic clayA-7AASHTO T 9982.8100.3117.8pcfCB T3.3, p.81
Optimum moisture contentHighly plastic or elastic clayA-7AASHTO T 99152535%CB T3.3, p.81
Maximum dry unit weight (ASTM D698)Well graded clean gravelsGWUFC 3-220-20 Table 3-1125130135pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Well graded clean gravelsGWUFC 3-220-20 Table 3-189.511%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilWell graded clean gravelsGWUFC 3-220-20 Table 3-13.0×10⁻⁴3.0×10⁻³3.0×10⁻²cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Poorly graded clean gravelsGPUFC 3-220-20 Table 3-1115120125pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Poorly graded clean gravelsGPUFC 3-220-20 Table 3-11112.514%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilPoorly graded clean gravelsGPUFC 3-220-20 Table 3-13.0×10⁻³3.0×10⁻²3.0×10⁻¹cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Silty gravelsGMUFC 3-220-20 Table 3-1120127.5135pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Silty gravelsGMUFC 3-220-20 Table 3-181012%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilSilty gravelsGMUFC 3-220-20 Table 3-13.0×10⁻⁶3.0×10⁻⁵3.0×10⁻⁴cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Clayey gravelsGCUFC 3-220-20 Table 3-1115122.5130pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Clayey gravelsGCUFC 3-220-20 Table 3-1911.514%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilClayey gravelsGCUFC 3-220-20 Table 3-13.0×10⁻⁷cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Well graded clean sandsSWUFC 3-220-20 Table 3-1110120130pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Well graded clean sandsSWUFC 3-220-20 Table 3-1912.516%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilWell graded clean sandsSWUFC 3-220-20 Table 3-13.0×10⁻⁴3.0×10⁻³3.0×10⁻²cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Poorly graded clean sandsSPUFC 3-220-20 Table 3-1100110120pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Poorly graded clean sandsSPUFC 3-220-20 Table 3-11216.521%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilPoorly graded clean sandsSPUFC 3-220-20 Table 3-13.0×10⁻³3.0×10⁻²3.0×10⁻¹cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Silty sandsSMUFC 3-220-20 Table 3-1110117.5125pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Silty sandsSMUFC 3-220-20 Table 3-11113.516%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilSilty sandsSMUFC 3-220-20 Table 3-13.0×10⁻⁶3.0×10⁻⁵3.0×10⁻⁴cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Sand-silt-clay, slightly plastic finesSM-SCUFC 3-220-20 Table 3-1110120130pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Sand-silt-clay, slightly plastic finesSM-SCUFC 3-220-20 Table 3-1111315%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilSand-silt-clay, slightly plastic finesSM-SCUFC 3-220-20 Table 3-13.0×10⁻⁸3.0×10⁻⁷3.0×10⁻⁶cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Clayey sandsSCUFC 3-220-20 Table 3-1105115125pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Clayey sandsSCUFC 3-220-20 Table 3-1111519%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilClayey sandsSCUFC 3-220-20 Table 3-13.0×10⁻⁷cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Inorganic silts and clayey siltsMLUFC 3-220-20 Table 3-195107.5120pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Inorganic silts and clayey siltsMLUFC 3-220-20 Table 3-1121824%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilInorganic silts and clayey siltsMLUFC 3-220-20 Table 3-13.0×10⁻⁸3.0×10⁻⁷3.0×10⁻⁶cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Silt-clay mixtureCL-MLUFC 3-220-20 Table 3-1100110120pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Silt-clay mixtureCL-MLUFC 3-220-20 Table 3-1121722%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilSilt-clay mixtureCL-MLUFC 3-220-20 Table 3-13.0×10⁻⁸cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Lean clayCLUFC 3-220-20 Table 3-195107.5120pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Lean clayCLUFC 3-220-20 Table 3-1121824%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilLean clayCLUFC 3-220-20 Table 3-13.0×10⁻⁸cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Organic silts, low plasticityOLUFC 3-220-20 Table 3-18090100pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Organic silts, low plasticityOLUFC 3-220-20 Table 3-1212733%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilOrganic silts, low plasticityOLUFC 3-220-20 Table 3-13.0×10⁻⁸cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Elastic siltsMHUFC 3-220-20 Table 3-17082.595pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Elastic siltsMHUFC 3-220-20 Table 3-1243240%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilElastic siltsMHUFC 3-220-20 Table 3-13.0×10⁻⁹cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Fat clayCHUFC 3-220-20 Table 3-17590105pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Fat clayCHUFC 3-220-20 Table 3-11927.536%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilFat clayCHUFC 3-220-20 Table 3-13.0×10⁻⁹cm/sUFC322020 T3-1, p.120
Maximum dry unit weight (ASTM D698)Organic claysOHUFC 3-220-20 Table 3-16582.5100pcfUFC322020 T3-1, p.120
Optimum moisture content (ASTM D698)Organic claysOHUFC 3-220-20 Table 3-11228.545%UFC322020 T3-1, p.120
Hydraulic conductivity of compacted soilOrganic claysOHUFC 3-220-20 Table 3-13.0×10⁻⁹cm/sUFC322020 T3-1, p.120
Maximum compacted layer thickness by roller typeRock fillTowed vibratory 6 t30inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelTowed vibratory 6 t24inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltTowed vibratory 6 t18inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClayTowed vibratory 6 t10inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseTowed vibratory 6 t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement baseTowed vibratory 6 t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeRock fillTowed vibratory 10 t59inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelTowed vibratory 10 t39inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltTowed vibratory 10 t28inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClayTowed vibratory 10 t14inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseTowed vibratory 10 t24inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement baseTowed vibratory 10 t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeRock fillTowed vibratory 15 t79inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelTowed vibratory 15 t59inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltTowed vibratory 15 t39inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClayTowed vibratory 15 t20inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseTowed vibratory 15 t31inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelTowed padfoot 6 t24inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltTowed padfoot 6 t18inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClayTowed padfoot 6 t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseTowed padfoot 6 t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelTowed padfoot 10 t39inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltTowed padfoot 10 t28inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClayTowed padfoot 10 t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseTowed padfoot 10 t24inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelSelf-propelled vibratory 7 (3) t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltSelf-propelled vibratory 7 (3) t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClaySelf-propelled vibratory 7 (3) t6inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseSelf-propelled vibratory 7 (3) t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement baseSelf-propelled vibratory 7 (3) t10inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeRock fillSelf-propelled vibratory 10 (5) t30inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelSelf-propelled vibratory 10 (5) t20inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltSelf-propelled vibratory 10 (5) t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClaySelf-propelled vibratory 10 (5) t8inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseSelf-propelled vibratory 10 (5) t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement baseSelf-propelled vibratory 10 (5) t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeRock fillSelf-propelled vibratory 15 (10) t59inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelSelf-propelled vibratory 15 (10) t39inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltSelf-propelled vibratory 15 (10) t28inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClaySelf-propelled vibratory 15 (10) t14inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseSelf-propelled vibratory 15 (10) t24inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement baseSelf-propelled vibratory 15 (10) t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelSelf-propelled vibratory 8 (4) t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltSelf-propelled vibratory 8 (4) t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClaySelf-propelled vibratory 8 (4) t8inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseSelf-propelled vibratory 8 (4) t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelSelf-propelled padfoot 11 (7) t24inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltSelf-propelled padfoot 11 (7) t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClaySelf-propelled padfoot 11 (7) t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseSelf-propelled padfoot 11 (7) t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelSelf-propelled padfoot 15 (10) t39inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltSelf-propelled padfoot 15 (10) t28inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClaySelf-propelled padfoot 15 (10) t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseSelf-propelled padfoot 15 (10) t24inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelVibratory tandem 2 t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltVibratory tandem 2 t8inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClayVibratory tandem 2 t4inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseVibratory tandem 2 t8inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement baseVibratory tandem 2 t6inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelVibratory tandem 7 t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltVibratory tandem 7 t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClayVibratory tandem 7 t6inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseVibratory tandem 7 t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement baseVibratory tandem 7 t10inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelVibratory tandem 10 t20inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltVibratory tandem 10 t14inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClayVibratory tandem 10 t8inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseVibratory tandem 10 t16inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement baseVibratory tandem 10 t12inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelVibratory tandem 13 t24inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltVibratory tandem 13 t18inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClayVibratory tandem 13 t10inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbaseVibratory tandem 13 t18inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement baseVibratory tandem 13 t14inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSand and gravelPadfoot tandem 18 t35inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeSiltPadfoot tandem 18 t28inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typeClayPadfoot tandem 18 t24inLOOK23 T7.8, p.223
Maximum compacted layer thickness by roller typePavement subbasePadfoot tandem 18 t24inLOOK23 T7.8, p.223
Open this set in the database ↗
Frost susceptibility (5 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Frost susceptibility groupAll soils with less than 3% finer than 0.02 mmNFSNFSCB T9.2, p.197
Frost susceptibility groupGravelly soils: 3–20% finer than 0.02 mmF1F1CB T9.2, p.197
Frost susceptibility groupSands: 3–15% finer than 0.02 mmF2F2CB T9.2, p.197
Frost susceptibility groupGravelly soils with >20% finer than 0.02 mm; sands (except silty fine sands) with >15% finer; clays with PI > 12; varved clays with uniform conditionsF3F3CB T9.2, p.197
Frost susceptibility groupSilts, including sandy silts; fine silty sands with >15% finer than 0.02 mm; lean clays with PI < 12; varved clays with non-uniform conditionsF4F4CB T9.2, p.197
Open this set in the database ↗
Coefficient of subgrade reaction (8 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Coefficient of subgrade reaction (1-ft plate)Loose sand18.438.658.9pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Medium dense sand36.8165.8294.7pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Dense sand221340.8460.5pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Clayey sand110.5202.6294.7pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Silty sand73.7128.9184.2pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Clayey soil, su < 1,044 psf (50 kPa)36.855.273.7pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Clayey soil, su 1,044–2,089 psf (50–100 kPa)73.7128.9184.2pciROB T9, p.84
Coefficient of subgrade reaction (1-ft plate)Clayey soil, su > 2,089 psf (100 kPa)184.2pciROB T9, p.84
Open this set in the database ↗
References (6)
  1. CB – Carter, M. & Bentley, S.P. (2016). Soil Properties and their Correlations, 2nd ed. Wiley.
  2. IDOT – Illinois DOT (2015). Geotechnical Manual.
  3. LOOK – Look, B.G. (2007). Handbook of Geotechnical Investigation and Design Tables. Taylor & Francis.
  4. LOOK23 – Look, B.G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press / Taylor & Francis.
  5. ROB – Robertson, P.K. & Cabal, K.L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing.
  6. UFC322020 – U.S. Department of Defense (2025). UFC 3-220-20, Foundations and Earth Structures (NAVFAC DM-7.2), 16 January 2025.

Full database  ·  Laboratory tests  ·  Download Excel  ·  Library documents for this chapter  ·  Calculators for this chapter

Further reading — ICE Manual of Geotechnical Engineering
The chapters below cover the same ground in more depth. They are cited, not reproduced; see Appendix G for the full cross-reference and edition notes.
7.3.0 Executive Summary

Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way — intermodal container yards, locomotive servicing facilities, maintenance-of-way (MOW) vehicle access roads, classification yard roadways, and fueling pads; and (2) the granular track substructure system — ballast, subballast, and subgrade — which functions as an engineered pavement system for track loading. Both domains require rigorous characterization of subgrade support capacity, compressibility, moisture sensitivity, and frost behavior.

Airport pavement engineering
Airport pavement engineering

This chapter provides methods for characterizing subgrade strength (CBR, M_r, k modulus), designing flexible and rigid pavement structural numbers using AASHTO 1993 methodology, evaluating frost penetration and heave potential for Class I railroad northern operations, and developing subgrade improvement recommendations for intermodal yard heavy container crane trackage. All equations are presented in English units. Railroad-client-specific pavement standards are integrated throughout.

Flexible Pavement
Flexible Pavement
Mechanics of Flexible Pavement Design
Mechanics of Flexible Pavement Design
Empirical Equations — Use and Limitations

The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.

IDCorrelationGives
RK-10UCS from point load indexσ꜀
IX-10Undrained strength from liquidity indexSᵤ (remolded)
IS-21Soil unit weight from CPTγ
7.3.1 Background and Railroad Context

Railroad pavement subgrade evaluation differs from highway pavement design in several important respects:

TxDOT Soil Classes C1–C4 for Embankment and Subgrade
TxDOT Soil Classes C1–C4 for Embankment and Subgrade

Loading regime: Intermodal yards subject paved areas to heavy rubber-tired container handlers (reach stackers up to 180,000 lb gross weight; loaded highway tractors at 80,000 lb GVW), overhead gantry crane rail loads (250–500 kip axle loads on crane rail foundations), and stacked container loads (4-high stacking of 45,000-lb gross containers = 180,000 lb per stack pad). These loads are far more severe than typical highway loadings and require higher subgrade strength criteria.

Crane rail foundations: Container cranes at intermodal yards ride on embedded crane rails set in reinforced concrete beams spanning pile caps. The geotechnical input — differential settlement between crane rail beams — governs structural crane serviceability more than pavement structural number alone.

Frost sensitivity: Owner railroads may operate intermodal terminals and MOW facilities in areas subject to frost depths of 4–8 ft (Prairie provinces, Manitoba, Ontario, Quebec, British Columbia interior). Subgrade frost heave of even 1–2 in. creates unacceptable differential movement in crane rails and reach stacker lanes.

Heavy industrial use: Unlike highway pavements rated by equivalent single axle loads (ESALs) over a 20-year design life, railroad intermodal pavement is often designed for 15-million-ESAL equivalents to reflect 24/7 terminal operations with heavy handling equipment.

Client-specific standards table:

Table 7.3-1: Pavement Design Standards
RailroadApplicable StandardDesign Life (yr)Target ESALCBR MinimumM_r Minimum (psi)Pavement Type PreferredNotes
AREMAAREMA MRE Chapter 120Per design53,000Per owner preferenceMinimum baseline

Owner railroads may set different values. Confirm them against the owner railroad's current standards when the work is scoped.

JPCP = Jointed Plain Concrete Pavement; HMA = Hot-Mix Asphalt; ESAL = Equivalent Single Axle Load.

7.3.2 Subgrade Strength Testing
7.3.2.1 California Bearing Ratio (CBR)

The CBR test (ASTM D1883 — laboratory; ASTM D4429, withdrawn 2018 — field) measures resistance of a compacted soil to penetration by a standard cylindrical piston at a rate of 0.05 in./min. The CBR value is expressed as a percentage of the standard force required to penetrate a standard aggregate:

CBR Test of Soil
CBR Test of Soil
CBR = FmeasuredFstandard × 100%

Where:

  • F_measured = load required to produce 0.1-in. penetration (lb/in.²)
  • F_standard = 1,000 psi at 0.1-in. penetration (standard aggregate value)

Soaked CBR (4-day immersion) is used for pavement design to simulate worst-case seasonal saturation. Unsoaked CBR may be used for check only.

Table 7.3-2: Typical CBR Values by USCS Soil Classification
USCS SymbolSoil DescriptionTypical CBR Range (%)AASHTO ClassSuitability
GW, GPClean gravels40–80A-1-aExcellent
GM, GCSilty/clayey gravels20–60A-1-bGood–Excellent
SW, SPClean sands10–40A-1-b, A-3Good
SMSilty sands5–20A-2-4, A-2-6Fair–Good
SCClayey sands4–12A-2-6, A-2-7Fair
MLSilt, sandy silt3–8A-4Poor–Fair
CLLow-plasticity clay2–6A-6Poor
OLOrganic silt/clay1–4A-4, A-5Very Poor
MHElastic silt2–6A-5Poor
CHHigh-plasticity clay1–4A-7-5, A-7-6Very Poor
OH, PtOrganic clay/peat< 2A-8Unsuitable
Inputs for the equations in this section (3)
SymbolWhat it isComes fromHow to get itTypical range
CBRCalifornia Bearing Ratio = F_measured F_standard × 100%Lab or field testLab CBR (ASTM D1883, soaked) on compacted samples; field CBR (D4429); or from DCP (ASTM D6951) correlation.CL/CH ≤ 15; sands 10–40; gravels 20–80 · by USCS group
Fmeasuredload required to produce 0.1-inField or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific
Fstandard1,000 psi at 0.1-inConstantPhysical constant or standard value.project-specific
California Bearing Ratio (CBR) Test
California Bearing Ratio (CBR) Test
Supplemental reference · Carter & Bentley (2016), Ch. 7

Estimating CBR Before the Test: Index Properties, Shear Strength and Plate Modulus

CBR is cheap to estimate and slow to measure. Early in a project, the boring logs and index tests are often all there is, and a defensible estimate of CBR sets the first pavement or trackbed section and decides how many CBR tests to schedule. Every correlation below is a screening tool: each was fitted to a particular soil population and test procedure, and none replaces a soaked CBR on the actual subgrade.

Why measured CBR values differ. The same soil can give very different CBR values depending on how the test was run. Before comparing a laboratory result with a correlation, or with another laboratory’s result, check the items in Table 7.3-12.

Table 7.3-12. Test variables that change the CBR value (after Carter & Bentley 2016, Table 7.1)
VariableWhat to check
DensityCBR is reported at an assumed in-place density, typically 90, 95 or 100% of maximum dry density from the standard (5.5-lb rammer, AASHTO T 99) or modified (10-lb rammer, AASHTO T 180) test. State which.
MoistureThe specimen should represent the worst likely subgrade condition: compacted at optimum or at the expected worst field moisture, then tested at once or after a 4-day soak, depending on the design method.
Surcharge weightsWeights on the specimen represent the overlying pavement or track section. The number used varies, and the effect is largest in granular soils.
Face testedUS practice tests the bottom face, because soaking softens the top. Practice that averages the top and bottom faces gives lower values.
Compaction methodAASHTO requires dynamic (rammer) compaction. Static or vibrating-hammer compaction, allowed elsewhere, gives different specimens.
In-place testsField tests on finished subgrade lack the mould’s confinement, and a dried surface reads high.

CBR from plasticity. In cohesive soils CBR depends on plasticity, density and, above all, moisture. A widely used chart (Black 1962) gives saturated CBR from the plasticity index and the consistency index, CI = (LL − w)/PI. At a given PI, CBR rises steeply as CI rises, that is, as the soil gets drier relative to its liquid limit. For a partly saturated soil the chart value is multiplied by a correction factor K, where unsaturated CBR = K × saturated CBR at the same moisture content (Table 7.3-14). K is less than 1, because at the same moisture content a partly saturated soil is less dense. Regression equations from other soil populations are summarized in Table 7.3-13.

Table 7.3-13. Published correlations for estimating CBR (after Carter & Bentley 2016, §7.1, §7.3, §7.4)
CorrelationSoils and conditionsUse and limits
CBR = 21 − 16 log(OMC) + 0.07 LL48 fine-grained soils, all CBR < 9; OMC and LL in %Standard deviation 1.8 CBR points. Preliminary identification only (Agarwal and Ghanekar 1970).
CBR = 6.54 − 0.077 OMC − 0.1 PIFine-grained soils, 4-day soak; OMC and PI in %Screening (Shirur and Hiremath 2014). The same study’s equations in MDD give implausible values for typical inputs as printed and are not reproduced.
Suitability index S = A / (LL · log PI); soaked CBR ≈ 34.3 S − 7.15, with more than 90% of values within ±16Lateritic gravels compacted to maximum dry density with a 10-lb rammer; A = % passing the 2.4-mm sieve (about the No. 8)Granular fill and borrow with fines only (de Graft-Johnson and Bhatia 1969). Wide scatter.
CBR ≈ 0.62 su (su in psi)Cohesive soils; the CBR plunger treated as a small circular footing, qu = 1.2 × 5.14 su = 6.2 su, divided by the 1,000-psi standardClose to field CBR. Laboratory values run a little higher because of the mould. Equal to CBR ≈ 0.09 su with su in kPa, or about 0.1 su as a rule of thumb.
CBR = 0.099 su1.7 (su in psi)Well-graded cohesive fill (Jenkins and Kerr 1998; 0.0037 su1.7 with su in kPa)Non-linear: about 0.076 su at 11 psi, 0.12 su at 22 psi and 0.20 su at 44 psi in the kPa form. Lower than the linear rule below about 2,000 psf (14 psi), higher above it.
Ev = 51 log(CBR) MPa (× 145 for psi)Silty and clayey sands and cohesive subgradePlate-bearing modulus from CBR (UK airfield guidance, Defence Estates 2006; curve fit by Carter & Bentley). For comparing with plate-load or light-weight deflectometer results.
Ev = 3.6 CBR − 0.088 CBR1.73 + 3 MPaCoarse-grained non-plastic subgradeAs above. The book labels the axis in MN/m²/m; the modulus from a plate test (DIN 18134) is in MN/m² (MPa), which is how it is used here.
Table 7.3-14. Correction factor K for partial saturation (read from Carter & Bentley 2016, Fig. 7.2, after Black 1962)
Effective degree of saturation (%)10090807060about 53
K = unsaturated CBR / saturated CBR at the same moisture content1.0about 0.75about 0.6about 0.43about 0.3about 0.2

Values read from the published curve, fitted to London clay, brick earth and two Kenyan clays; read to about ±0.05.

Classification charts relating CBR to USCS and AASHTO groups (Carter & Bentley Figs. 7.6 and 7.7) agree broadly with Table 7.3-2 and are not repeated here.

For railroad work: Use these correlations to plan, not to design. Estimate CBR from the index tests and any shear strength measured in the borings, then schedule soaked CBR tests where the estimate is near a design threshold or where the estimates disagree. For clay subgrade under yard pavements and track, the strength-based estimate is often the most useful, because a hand vane or pocket penetrometer reading can be taken at every test pit and at proof-roll locations. Use the linear and non-linear strength relations together: where they straddle the design CBR, test before accepting the subgrade (Example 7.3-5). The plate-modulus relations let a light-weight deflectometer or plate-load test be checked against a CBR-based design; use one set of units throughout.

Source: Carter, M. and Bentley, S. P. (2016). Soil Properties and their Correlations, 2nd ed., Ch. 7, Table 7.1, Eqs. 7.2–7.10, Figs. 7.1–7.3, 7.8. Summarized and paraphrased; equations converted to US units where noted; K values read from the figure. Full reference under Supplemental References.

Example 7.3-5: CBR of a Clay Yard Subgrade From Hand-Vane Strength

An intermodal yard expansion for a Class I railroad located in Ohio has a lean clay (CL) subgrade. The reach-stacker pavement was designed for a subgrade CBR of 5. Soaked CBR results will take two weeks, but the grading contractor wants to know now whether the exposed subgrade is acceptable. Hand-vane readings at the proof-roll stations average an undrained shear strength of 1,250 psf. The engineer must estimate the CBR from the strength, find the plate modulus that the light-weight deflectometer should show, and decide whether the subgrade can be accepted before the CBR results arrive.

lean clay (CL) subgrade, exposed for proof-roll Hand vanesu = 1,250 psf CBR plungerqu = 6.2 suCBR = ? Givensu = 1,250 psf (hand vane)Design subgrade CBR = 5Lean clay (CL)Table 7.3-13 correlations RequiredCBR, linear and non-linearPlate modulus Ev for the LWD checksu needed for CBR 5Accept now, or wait? Black = given; red = required
Given and required for Example 7.3-5.

Given

VariableValueDescription
su1,250 psf = 8.68 psiAverage hand-vane undrained shear strength at the proof-roll stations
CBRdesign5Subgrade CBR assumed in the pavement design
SoilLean clay (CL)Cohesive subgrade

Required

  • (a) CBR from the linear bearing-capacity relation
  • (b) CBR from the non-linear relation
  • (c) Plate modulus Ev corresponding to each estimate
  • (d) Undrained strength needed for CBR 5 by each relation
  • (e) Whether to accept the subgrade before the soaked CBR results

Equations

  1. Eq. 1: CBR ≈ 0.62 su — su in psi; from qu = 6.2 su over the 1,000-psi standard
  2. Eq. 2: CBR = 0.099 su1.7 — su in psi (Jenkins and Kerr)
  3. Eq. 3: Ev = 51 log(CBR) — MPa, cohesive subgrade; × 145 for psi

Steps

Step 1 · Convert the strength
1,250 / 144
su = 8.68 psi
↓
Step 2 · (a) Linear estimate (Eq. 1)
0.62 × 8.68
CBR ≈ 5.4
Spot check: in kPa, 8.68 × 6.895 = 59.9 kPa; 0.09 × 59.9 = 5.4.
↓
Step 3 · (b) Non-linear estimate (Eq. 2)
0.099 × 8.681.7 = 0.099 × 39.4
CBR ≈ 3.9
Spot check: kPa form, 0.0037 × 59.91.7 = 0.0037 × 1,054 = 3.9.
↓
Step 4 · (c) Plate modulus (Eq. 3)
51 log 5.4 = 37 MPa; 51 log 3.9 = 30 MPa
Ev ≈ 5,400 psi (linear) or 4,400 psi (non-linear)
↓
Step 5 · (d) Strength needed for CBR 5
Eq. 1: 5 / 0.62 = 8.06 psi; Eq. 2: (5 / 0.099)1/1.7 = 10.0 psi
su ≥ 1,160 psf (linear) or 1,450 psf (non-linear)
↓
Step 6 · (e) Decision
The two estimates straddle the design CBR of 5
Do not accept on strength alone; confirm with LWD and soaked CBR
↓
Solution
CBR 3.9 to 5.4; Ev about 4,400 to 5,400 psi; borderline.

Solution

(a) CBR ≈ 5.4. (b) CBR ≈ 3.9. (c) Ev ≈ 37 MPa (5,400 psi) or 30 MPa (4,400 psi). (d) CBR 5 needs su of about 1,160 psf by the linear relation or 1,450 psf by the non-linear one. (e) The subgrade is borderline and should not be accepted on hand-vane strength alone.

Below about 2,000 psf the non-linear relation gives the lower CBR, and here it falls below the design value while the linear rule just passes. The practical answer is to run light-weight deflectometer tests at the proof-roll stations now, accept areas that reach about 5,400 psi, and hold the rest for the soaked CBR results. Hand-vane strength on a freshly exposed surface is also an upper bound: a wet spell before paving will lower it, and soaked CBR represents that worst case. If the soaked results come in below 5, the options are to redesign for the measured value, or to add a stabilized or granular layer (Section 7.3.6.2). Plate-modulus targets from other sources, such as the desiccated-clay case study in Section 7.3.6 that pairs CBR about 5 with 7,200 psi, use different correlations; agree one correlation with the contractor before testing starts.

7.3.2.2 Resilient Modulus (M_r)

The resilient modulus is the fundamental subgrade input for AASHTO 1993 pavement design and NCHRP 1-37A (Mechanistic-Empirical Pavement Design):

Mr = σdεr    (psi)

Where:

  • σ_d = applied deviator stress (psi)
  • ε_r = recoverable (resilient) axial strain (in./in.)

AASHTO T 307 laboratory testing applies a sequence of conditioning and test cycles at varying confining and deviator stresses. For preliminary design, M_r is estimated from CBR:

Mr (psi) = 1,500 × CBR    (for CBR ≤ 10, Heukelom & Klomp 1962)
Mr (psi) = 2,555 × CBR0.64    (NCHRP 1-37A (MEPDG), for CBR > 10)

From Atterberg Limits (rough screening relation, not a standard; confirm by AASHTO T 307 testing):

Mr (psi) = 3,000 - 63.4 × PI    (approximate, for PI > 5)

Moisture sensitivity of subgrade resilient modulus

Fine-grained resilient modulus depends on stress state, soil type and structure (compaction method), moisture and dry density. Selig and Waters give two relations for the modulus wet of optimum, with Δw = w − wopt in percentage points:

  • Constant dry density: Er/Er,opt = 0.98 − 0.28 Δw + 0.029 Δw2.
  • Constant compactive effort: Er/Er,opt = 0.96 − 0.18 Δw + 0.0067 Δw2.

At 2 points wet of optimum these give about 0.54 and 0.63 (authors' evaluation). That is roughly a 40–45% loss of stiffness. Use a wet-season moisture when selecting design Mr for track and yard subgrade.

After Selig & Waters (1994), ch. 10. Full reference under Supplemental References.

Inputs for the equations in this section (7)
SymbolWhat it isComes fromHow to get itTypical range
Mrresilient modulus = σ_d ε_r    (psi)Lab test (or correlation)Repeated-load triaxial (AASHTO T 307), or Mr ≈ 2,555·CBR0.64 (MEPDG).fine-grained 3,000–14,000 psi · by USCS group
σdapplied deviator stress (psi)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
εrrecoverable (resilient) axial strain (in./in.)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Mr (psi)resilient modulus = 1,500 × CBR    (for CBR ≤ 10, Heukelom & Klomp 1962)Lab test (or correlation)Repeated-load triaxial (AASHTO T 307), or Mr ≈ 2,555·CBR0.64 (MEPDG).fine-grained 3,000–14,000 psi · by USCS group
PIplasticity indexLab testPI = LL − PL from Atterberg limits (ASTM D4318).CL 7–30, CH 25–80 · by USCS group
wwater contentLab testOven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938).gravels/sands 3–25%, clays 15–70% · by USCS group
CBRCalifornia Bearing RatioLab or field testLab CBR (ASTM D1883, soaked) on compacted samples; field CBR (D4429); or from DCP (ASTM D6951) correlation.CL/CH ≤ 15; sands 10–40; gravels 20–80 · by USCS group
7.3.2.3 Modulus of Subgrade Reaction (k)

For rigid pavement (Portland cement concrete) design, the Westergaard modulus of subgrade reaction k (pci — lb/in.³) characterizes the support provided by the subgrade beneath the slab:

Plate load test (ASTM D1196): Apply load via 30-in. diameter bearing plate; record settlement at 0.05-in. increments:

Plate Load Test (PLT)
Plate Load Test (PLT)
Understanding the Plate Load Test
Understanding the Plate Load Test
k = pδ    (pci)

Where p = applied pressure (psi) and δ = plate settlement (in.) at 0.05 in. of settlement (30-in. plate).

Approximate correlation from CBR (used for Table 7.3-3; not a PCA equation, and lower than k = M_r/19.4):

k (pci) = CBR0.075    (approximate for design purposes)

Correlation from M_r:

k (pci) ≈ Mr19.4    (Ioannides et al. 1990)
Table 7.3-3: Typical k Values by Soil Type
Soil TypeUSCSCBR (%)k (pci)M_r (psi)Pavement Suitability
Gravel/gravel-sandGW, GP40–80535–1,07015,000–30,000Excellent
Sandy gravelGM, GC20–50267–6678,000–20,000Good
Sand, gravelly sandSW, SP10–40133–5355,000–15,000Fair–Good
Silty sandSM5–2067–2673,500–8,000Fair
Clayey sandSC4–1253–1603,000–5,500Fair
Silt, sandy siltML3–840–1072,500–4,500Poor–Fair
Low-plasticity clayCL2–627–801,500–3,500Poor
High-plasticity clayCH1–413–531,000–2,500Very Poor
Inputs for the equations in this section (2)
SymbolWhat it isComes fromHow to get itTypical range
papplied pressure (psi) and δ = plate settlement (in.) at 0.1-inLoading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
k (pci)CBR 0.075    (approximate for design purposes)Field test (or correlation)Plate load test (ASTM D1196 / AASHTO T 222), or correlation with CBR or Mr.clays 50–200, gravels 250–500 pci · by USCS group
Supplemental reference

Free DoD tools for heavy-vehicle yards: PCASE

The USACE PCASE desktop implements the Unified Facilities Criteria for pavements, including UFC 3-250-01 (roads, streets, walks and open storage areas) and UFC 3-250-09 (aggregate-surfaced roads). It is useful for container yards and laydown areas that fall outside AASHTO traffic assumptions. Its modules cover traffic (a vehicle database that can be edited for handlers and cranes), design by CBR or layered-elastic methods with seasonal sets and frost design, evaluation, FWD back-calculation, and a DCP module. The DCP module converts blows and penetration to CBR, k or modulus for a 17.6-lb or 10.1-lb hammer, with “all soils”, lean-clay or heavy-clay correlations. It breaks the profile into layers automatically, and the resulting layer structure can be imported directly into the evaluation module.

Source: U.S. Army Corps of Engineers (2010). PCASE 2.09 User Manual. Transportation Systems Center / ERDC

CBR and modulus ranges for the UIC subgrade classes

UIC links its subgrade quality classes (S0–S3) to ranges of modulus of elasticity and CBR (Figure 7.3-11). This lets CBR results from yard or access-road work be read against the track-subgrade classification in Chapter 2.3. Rock subgrades have moduli of the order of 430,000 psi. Profillidis defines CBR as the load producing 0.1 in. of penetration in the sample, divided by the load producing the same penetration in a standard reference material.

Figure 7.3-11. Modulus of elasticity (kp/cm²) and CBR (%) ranges for subgrade classes S0, S1, S2 and S3. Profillidis Fig. 9.5.
Figure 7.3-11. Modulus of elasticity (kp/cm²) and CBR (%) ranges for subgrade classes S0, S1, S2 and S3. Profillidis Fig. 9.5.

He adapts Dormon’s rule from highway engineering for the effect of traffic on subgrade stress: σ1/σ2 = (N2/N1)λ, with λ ≈ 0.2.

After Profillidis (2014), §9.6, §9.8, Fig. 9.5. Full reference under Supplemental References.

Estimating subgrade strength by feel

Table 7.3-8. Guide for estimating subgrade soil strength in the field
FeelField indicationSPT (blows)Shear strength (psf)CBR
Very softPerson standing sinks > 3 in.< 2< 250< 0.4
SoftPerson walking sinks 2–3 in.2–4250–5000.4–0.8
MediumPerson walking sinks ~1 in.4–8500–1,0000.8–1.6
StiffPickup ruts 0.47–1 in.8–151,000–2,0001.6–3.2
Very stiffLoaded dump truck ruts 1–3 in.15–302,000–4,0003.2–6.4
HardInsignificant ruts under loaded dump truck> 30> 4,000> 6.4

Values as given in the course reference; use for screening, not design.

Figure 7.3-13. Course reference table for estimating subgrade consistency.
Figure 7.3-13. Course reference table for estimating subgrade consistency.

After Geotechnology for Railroaders Program, Module 2; §10. Full reference under Supplemental References.

Case study: 7.3.15.1 Chasing a CBR of 7% into competent rock (Look 2023), in §19.15 Case Studies.

7.3.3 AASHTO 1993 Flexible Pavement Design
7.3.3.1 Structural Number Equation

The AASHTO 1993 design equation for flexible pavement structural number (SN) is:

Pavement Design
Pavement Design
log W18 = ZR ⋅ S0 + 9.36 ⋅ log(SN + 1) - 0.20 + log[Δ PSI4.2 - 1.5]0.40 + 1094(SN+1)5.19 + 2.32 ⋅ log(Mr) - 8.07

Where:

  • W₁₈ = design ESAL (Equivalent Single 18-kip Axle Loads)
  • Z_R = standard normal deviate for reliability R (Z_R = −1.645 for R = 95%; −1.282 for R = 90%)
  • S₀ = combined standard error (typically 0.45 for flexible, 0.35 for rigid)
  • ΔPSI = change in present serviceability index (PSI_i − PSI_f; typically 4.2 − 2.0 = 2.2 for heavy industrial)
  • M_r = subgrade resilient modulus (psi)
  • SN = structural number (in.)

Solve iteratively for SN given W₁₈, R, S₀, and M_r.

Inputs for the equations in this section (6)
SymbolWhat it isComes fromHow to get itTypical range
W₁₈design ESAL (Equivalent Single 18-kip Axle Loads)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
ZRstandard normal deviate for reliability R (Z_R = −1.645 for R = 95%Design criterionSet by the owner railroad's standards, AREMA, AASHTO, USACE or the project specification.project-specific
S₀combined standard error (typically 0.45 for flexible, 0.35 for rigid)Design criterionSet by the owner railroad's standards, AREMA, AASHTO, USACE or the project specification.typically 0.45 for flexible, 0.35 for rigid
ΔPSIchange in present serviceability index (PSI_i − PSI_fDesign criterionSet by the owner railroad's standards, AREMA, AASHTO, USACE or the project specification.typically 4.2 − 2.0 = 2.2 for heavy industrial
Mrsubgrade resilient modulus (psi)Lab test (or correlation)Repeated-load triaxial (AASHTO T 307), or Mr ≈ 2,555·CBR0.64 (MEPDG).fine-grained 3,000–14,000 psi · by USCS group
SNstructural number (in.)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
7.3.3.2 Layer Coefficients and Structural Number
SN = a1 D1 + a2 D2 m2 + a3 D3 m3

Where:

  • a_i = layer coefficient for each pavement layer
  • D_i = layer thickness (in.)
  • m_i = drainage coefficient for unbound layers (1.0 for good drainage; 0.80 for fair)
Anatomy of a Modern Road — Layers, Geogrid & Subdrainage
Anatomy of a Modern Road — Layers, Geogrid & Subdrainage
Road Pavement Layer Details
Road Pavement Layer Details
Table 7.3-4: AASHTO Layer Coefficients for Railroad Facility Pavements
Layer Materiala_iTypical D_i (in.)Notes
Dense-graded HMA (surface/binder)0.444–8AASHTO M 320; PG 76-22 for heavy truck
Emulsified asphalt treated base0.344–8Used as intermediate base layer
Crushed aggregate base (CAB)0.146–12AASHTO M 147; CBR ≥ 80%
Granular subbase (GSB)0.116–18CBR ≥ 20%; used for frost protection
Portland cement concrete (JPCP)—8–14Rigid design uses k/slab thickness method
Cement-treated base (CTB)0.236–10Unconfined compressive strength ≥ 300 psi
Lime-stabilized subgrade0.106–12PI reduction to < 12
Racetrack-shaped test track diagram showing 14 numbered test sections with different lime, cement, and fiber contents and the number of passes to failure for ea
Photo 7.3.3-1. Test section design, numbering scheme, and number of passes to failure. From Crockford, Grogan, and Chill (1993), Transportation Research Record 1418, Figure 4, p. 63.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
A cylindrical soil sample specimen, hand-labeled, prepared for laboratory testing
Photo 7.3.3-2. Fiber-reinforced soil sample prepared for laboratory testing. From the US Army Corps of Engineers.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
A tractor-mounted rotary mixer working fibers into soil in the field, with a pile of fiber material alongside
Photo 7.3.3-3. Fiber-soil field mixing. From the US Army Corps of Engineers. The Fact Sheet document's own cover image is a closely related photograph of the same mixing operation.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Flexible Pavement Layers — Subgrade to Asphalt
Flexible Pavement Layers — Subgrade to Asphalt
Inputs for the equations in this section (3)
SymbolWhat it isComes fromHow to get itTypical range
ailayer coefficient for each pavement layerChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Dilayer thickness (in.)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
midrainage coefficient for unbound layers (1.0 for good drainageChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
7.3.3.3 Equivalent Single Axle Load Conversion

Loaded container handler (reach stacker): 180,000 lb GVW; tandem steer axle ~50,000 lb; drive axle ~130,000 lb.

ESALfactor = (P18,000)4    (4th power law, simplified)

Treating the 130,000-lb drive axle as a tandem: ESAL_factor = (130,000/32,000)^4.0 ≈ 272 ESALs per pass (about 2,700 if treated as a single axle). A terminal handling 500 loaded container moves per day generates approximately:

W18,annual = 500 moves/day × 2 passes/move × 272 ESAL/pass × 365 ≈ 99,000,000 ESAL/yr

The fourth-power law is unreliable this far outside the AASHO Road Test loads, so do not rely on a 10–15M ESAL total for an active terminal. Design container-handler areas with heavy-industrial methods (for example, the PCA heavy industrial or port pavement methods) using the actual wheel loads and repetitions.

Inputs for the equations in this section (1)
SymbolWhat it isComes fromHow to get itTypical range
ESALfactorintermediate value computed on this pageAnother equationComputed: ESAL_factor = ( P 18,000 )^4    (4th power law, simplified)project-specific
Supplemental reference

Asphalt under the track: HMA trackbed thickness design

Where yard tracks, grade crossings or intermodal loading tracks share a paved area, the same layered-elastic logic used for pavements applies to the track. Huang, Rose and Khoury (University of Kentucky) developed a thickness method using the KENTRACK program and two criteria: horizontal tensile strain at the bottom of the HMA (fatigue cracking) and vertical compressive stress — not strain, as in highway practice — on top of the subgrade (permanent deformation).

  • Two configurations: underlayment (HMA mat under the ballast, acting as subballast; most widely used and cheaper, and conventional surfacing still works) and overlayment (ties directly on the HMA with crib aggregate; for light traffic, good subgrade, limited clearance, highway crossings and intermodal yards).
  • Traffic: count each car as one repetition of two 33,000-lb wheels at 70 in. For design, one loaded-car repetition ≈ 160 gross tons (empties ignored). For transit cars, count two repetitions per car.
  • Design life: 30 years for fatigue; for permanent deformation, 30 years under overlayments but only 5 years under underlayments, because ballast surfacing corrects deformation.
  • Inputs: HMA modulus from the October ground temperature 12 in. below the surface; subgrade Es = 1,500 × CBR (saturated), taken at the weakest (spring) condition; mat width 12 ft.
  • Minimum HMA thickness: 3 in. on excellent, 4 in. on good or fair, and 6 in. on poor subgrade (thicker mats compact better on weak support). More thickness does not always extend fatigue life.
  • Conclusions: overlayments are not feasible unless the subgrade is good or excellent. Underlayments on poor subgrade (CBR ≈ 2) need very thick ballast, so it is usually cheaper to improve the subgrade first with a thick granular layer or old ballast (the authors suggest more than 2 ft under an overlayment).

Source: Huang, Y. H., Rose, J. G. and Khoury, C. J. (c. 1987). “Thickness Design for Hot-Mix Asphalt Railroad Trackbeds.” Proc. Association of Asphalt Paving Technologists, pp. 427–453 (scanned; text recovered by OCR)

7.3.3.4 Hot-Mix Asphalt Trackbed Thickness Check

Hot-mix asphalt (HMA) has been used under track since the late 1960s, first in test sections and later at turnouts, crossings, tunnels and bridge approaches. It is placed either as an underlayment, a mat beneath the ballast in place of granular subballast (the more common and usually more economical choice, because the mat can be thinner and normal surfacing still works), or as an overlayment, with ties set directly on the mat and held by cribbing aggregate (suited to light traffic, limited clearance, crossings and yards, and only on a good or improved subgrade). The thickness design by Huang, Rose and Khoury applies the same two criteria as a highway pavement.

7.3.3.4.1 Method

Equation 7.3-1. Failure criteria

Fatigue cracking: Nf = 0.0795 εt−3.291 E1−0.853   Subgrade deformation: Nd = 4.837 × 10−5 σc−3.734 Es3.583

εt = horizontal tensile strain at the bottom of the HMA; σc = vertical stress on the subgrade (psi); E1, Es = HMA and subgrade moduli (psi); Es ≈ 1,500 CBR.

Table 7.3-9. Design inputs
ItemRecommendation
Load repetitionsFreight: one per loaded car, about one per 160 gross tons with empties included; transit: two per car
Design lifeOverlayment 30 years for both criteria; underlayment 30 years fatigue, 5 years deformation (surfacing corrects it)
HMA modulusFrom the October ground temperature at 12 in. depth (national map in the paper)
Subgrade modulusWeakest (spring) condition; raise it only where a thick granular layer is placed
Chart correctionsWheel load (P/33 kips), rail section, tie spacing and moduli

The allowable strain and stress follow from the design repetitions. The strain and stress for a trial thickness are read from the charts in the paper, which were computed with the KENTRACK program for a standard case, and are multiplied by the correction factors. The trial thickness is increased until both are within the allowables. The authors present the method as conservative and as a guide until more field performance data are available.

7.3.3.4.2 Worked examples from the paper

Table 7.3-10. Overlayment checks (calculator output)
CaseAllowable strainAllowable stressTrial result
Freight, 100,000 repetitions per year, E1 200,000 psi, Es 15,000 psi2.11 x 10-413.1 psi14 in. required (paper)
Transit, 12.5-kip wheels, 150,000 per year, 5 in. trial1.86 x 10-411.7 psistrain 1.78 x 10-4, stress 9.59 psi: 5 in. adequate

Both allowables match the paper (2.1 and 1.86 × 10−4; 13.1 and 11.7 psi), and the 5 in. transit check reproduces 1.78 × 10−4 and 9.59 psi.

Open the HMA trackbed calculator →
Allowable tensile strain and subgrade stress from the design repetitions, and the check of chart values for a trial thickness after correction factors.

7.3.3.4.3 Sources in the library

These documents are in the reference library. The method summaries above are paraphrased; equations are standard or published forms.

  • Huang, Rose and Khoury, Thickness Design for Hot-Mix Asphalt Railroad Trackbeds (scanned paper; text read by OCR).Find source ↗
  • Design and Construction of Pavements and Rail Tracks (Balkema): asphalt and processed materials in trackbeds.Find source ↗
  • Railway Geotechnics (Li, Hyslip, Sussmann and Chrismer, 2016), Chapter 10: asphalt trackbed applications.Find source ↗
7.3.4 AASHTO 1993 Rigid Pavement Design

For jointed plain concrete pavement (JPCP), the AASHTO 1993 rigid pavement design equation is:

DLC (Dry Lean Concrete)
DLC (Dry Lean Concrete)
log W18 = ZR S0 + 7.35 log(D+1) - 0.06 + log[Δ PSI4.5-1.5]1 + 1.624 × 107(D+1)8.46 + (4.22 - 0.32 pt) log[S'c ⋅ Cd (D0.75 - 1.132)215.63 ⋅ J (D0.75 - 18.42(Ec/k)0.25)]

Where:

  • D = slab thickness (in.)
  • S'_c = concrete modulus of rupture (psi); typically 600–700 psi for 4,000-psi concrete
  • C_d = drainage coefficient (0.80–1.20)
  • J = load transfer coefficient (3.2 for doweled joints; 4.4 for undoweled)
  • E_c = elastic modulus of concrete (psi); E_c = 57,000√f'_c ≈ 3.6 × 10⁶ psi for f'_c = 4,000 psi
  • k = effective modulus of subgrade reaction (pci)
  • p_t = terminal serviceability (typically 2.5 for heavy industrial)
7.3.5 Frost Design
7.3.5.1 Frost Penetration Depth

For facilities in northern climates, frost penetration depth Z_f (ft) is estimated using the modified Berggren equation:

Zf = √48 kf FIL    (Stefan form; modified Berggren with λ = 1)

Where:

  • k_f = thermal conductivity of frozen soil (BTU/hr·ft·°F); typically 0.75–1.50
  • F_I = freezing index (°F-days); defined as cumulative degree-days below 32°F
  • L = volumetric latent heat of fusion (BTU/ft³) = 144 × w × γ_d; 144 BTU/lb = latent heat of water; w = water content (decimal); γ_d = dry unit weight (pcf)

Z_f is in feet. The full modified Berggren equation multiplies the right-hand side by the correction coefficient λ (≤ 1, from the thermal ratio and fusion parameter), so this simplified form is conservative (deeper).

Figure 7.3-14. Ice lenses forming as the cold front deepens.
Figure 7.3-14. Ice lenses forming as the cold front deepens.

Source: Aldrich, H.P. and Paynter, H.M. (1953), Analytical Studies of Freezing and Thawing of Soils, ACFEL Tech. Rep. 42; UFC 3-130-06 / TM 5-852-6, Calculation Methods for Determination of Depths of Freeze and Thaw in Soils; Pavement Interactive, "Modified Berggren Formula."

Design freezing indices by location (99% confidence level):

LocationDesign F_I (°F-days)Typical Z_f (ft)
Winnipeg, MB3,8007.5–9.0
Edmonton, AB3,2006.5–8.0
Thunder Bay, ON3,0006.0–7.5
Chicago, IL1,2003.5–4.5
Minneapolis, MN1,8004.5–5.5
Kansas City, MO8002.5–3.5
Atlanta, GA1500.5–1.0
Inputs for the equations in this section (5)
SymbolWhat it isComes fromHow to get itTypical range
kfthermal conductivity of frozen soil (BTU/hr·ft·°F)Published dataKersten charts in UFC 3-130-06 (TM 5-852-6) for the measured γd and w.fine-grained 0.8–1.4 BTU/hr·ft·°F · by USCS group
FIfreezing index (°F-days)Published hazard / climate dataDesign freezing index from NOAA climate records per UFC 3-130-06 (average of the 3 coldest winters in 30 years).project-specific
Lvolumetric latent heat of fusion (BTU/ft³)Another equationComputed: L = 144 × w × γ_d; 144 BTU/lb = latent heat of waterproject-specific
wwater content (decimal)Lab testOven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938).gravels/sands 3–25%, clays 15–70% · by USCS group
γddry unit weight (pcf)Lab or field testLab: ASTM D7263 on tube samples. Field: nuclear gauge (ASTM D6938), sand cone (D1556) or drive cylinder (D2937). Or γd = γ/(1 + w).sands 90–125, clays 80–115 pcf · by USCS group
7.3.5.2 Frost Heave and Frost Susceptibility

Frost susceptibility is classified per the USACE system (modified for pavement applications):

Table 7.3-5: Frost Susceptibility Classification
GroupFrost SusceptibilitySoil TypesApprox. lab heave rate class (in./day)Design Action
NFSNegligibleClean gravels and sands (< 3% finer than 0.02 mm)< 0.02No frost protection needed
F1LowGravelly soils with 3–10% finer than 0.02 mm0.02–0.08Minimal protection; monitor
F2MediumGravelly soils with 10–20% finer than 0.02 mm; sands with 3–15%0.08–0.16Partial replacement with non-frost-susceptible material
F3HighGravelly soils > 20% finer than 0.02 mm; sands > 15% (except very fine silty sands); clays with PI > 120.16–0.31Full replacement to Z_f or frost protection layer
F4Very HighAll silts; very fine silty sands > 15% finer than 0.02 mm; clays with PI < 12; varved clays> 0.31Full replacement; subgrade stabilization; drainage mandatory

In cold regions, replace F3 and F4 subgrade materials within the frost depth with granular material meeting: P-200 ≤ 3%, CBR ≥ 40%, non-plastic.

7.3.5.3 Reduced Subgrade Strength During Spring Thaw

During spring thaw, subgrade strength may be reduced to as low as 20–30% of the non-frozen value due to saturated, softened conditions. Owner railroads may apply a seasonal correction factor:

Mr,thaw = fthaw × Mr,design

Where f_thaw = 0.20 to 0.35 (conservative range during thaw period). The AASHTO 1993 finds the effective M_r from the average relative damage over the 12 months:

uf = 1.18 × 108 × Mr−2.32;   Mr,eff = (ūf / 1.18 × 108)−1/2.32

Because u_f rises steeply as M_r falls, the low-strength thaw months govern the design.

Inputs for the equations in this section (2)
SymbolWhat it isComes fromHow to get itTypical range
fthaw0.20 to 0.35 (conservative range during thaw period)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Mrresilient modulusLab test (or correlation)Repeated-load triaxial (AASHTO T 307), or Mr ≈ 2,555·CBR0.64 (MEPDG).fine-grained 3,000–14,000 psi · by USCS group
Supplemental reference

How a railway frost check differs from a pavement check (SNCF practice)

Mauduit, Livet and Piau summarize the French approach, which is useful where track and paved yard areas share frost-susceptible subgrade:

  • Frost susceptibility is classed from the frost-swelling test (NF P 98-234-2) by the slope of the swelling curve: SGn (frost-resistant) ≤ 0.0015, SGp (slightly susceptible) 0.0015–0.012, SGt (highly susceptible) > 0.012 in./(°F·h)1/2. Without a test, the class comes from the soil classification or the grading of the fraction passing the No. 10 sieve.
  • Roads compare a reference atmospheric frost index (e.g., the exceptional winter since 1951, or a 10-year winter) with the index the structure can withstand. They may accept a shortfall if thaw barriers (load restrictions) will be imposed.
  • Track (current SNCF method): the thickness of frost-resistant layers (ballast, sub-ballast, non-susceptible capping) must exceed the frost depth of a 20-year winter so that the first frost-susceptible layer is penetrated no more than 2 in.. Otherwise a resistant layer is thickened in 2-in. steps. The frost depth may be multiplied by 0.9 only where soils are not highly susceptible and drainage is very good. A frost-swelling test is recommended where the frost front could penetrate a susceptible layer by 2 in..
  • Why railways are stricter: track evenness tolerates little heave; railways cannot impose thaw barriers or add material at the surface; rain passes through the ballast; and ballast attrition keeps changing material properties. A statistical review of 1,600 frost-swelling tests found that the existing SNCF sub-layer and capping specification (ST590B) was not severe enough to guarantee frost-resistant soils.

Source: Mauduit, C., Livet, J. and Piau, J-M. (2007). “Frost Design Method for Roadways and Railways – State of the Art in France.” In Gomes Correia, A., Momoya, Y. and Tatsuoka, F. (eds.), Design and Construction of Pavements and Rail Tracks. Taylor & Francis/Balkema

Frost index and required protection thickness

The frost index is the integral of below-freezing temperature over time (°F-days or °F-hours). It is chosen for a design return period: F2, F5, F10 or F100 correspond to a 50%, 20%, 10% or 1% chance of freezing through in a given winter. For track, the required ballast-plus-subballast thickness rises from about 20 in. at 360°F-days to over 6.6 ft at 2,900°F-days, depending on mean annual temperature (Figure 7.3-12). The same chart is a reasonable cross-check for granular protection under yard pavements built on frost-susceptible silts. Chapter 2.3, §2.5 has the full frost discussion.

Figure 7.3-12. Required ballast + subballast thickness against frost penetration vs. frost index and mean annual temperature. Profillidis Fig. 12.6.
Figure 7.3-12. Required ballast + subballast thickness against frost penetration vs. frost index and mean annual temperature. Profillidis Fig. 12.6.

After Profillidis (2014), §9.11.1, §12.5.2, Table 9.6, Fig. 12.6. Full reference under Supplemental References.

The five conditions for frost heave

Heave requires saturated soil, frost-susceptible soil (silt), sub-zero temperature, a slowly advancing freezing front, and a water supply from below. Remove any one and it stops. For yards and access roads, that means drainage that keeps the water table down and clean, low-fines granular base. Fines-rich material compacts well dry but heaves and loses strength when wet.

After Geotechnology for Railroaders Program, Module 6.6, Module 2; Module 6.6 §02; Module 2 §09. Full reference under Supplemental References.

7.3.6 Subgrade Preparation and Compaction Criteria
7.3.6.1 Compaction Standards

Subgrade preparation specifications reference ASTM D698 (Standard Proctor) or ASTM D1557 (Modified Proctor):

RC = γd,fieldγd,max × 100%
Table 7.3-6: Subgrade Compaction Criteria
RailroadTest MethodMin RC (Top 12 in.)Min RC (Below 12 in.)Moisture RangeNotes
TypicalASTM D69895%90%±3%Common practice; confirm with owner
Proctor Compaction Test
Proctor Compaction Test
Why Moisture Content Matters Before Compaction
Why Moisture Content Matters Before Compaction
7.3.6.2 Subgrade Stabilization

When in-situ subgrade does not meet minimum CBR or M_r criteria, stabilization options include:

  • Lime stabilization: Add 3–8% hydrated lime (ASTM C977) to reduce PI and increase M_r. PI reduction target: PI_final < 12 for CL, CH soils. M_r improvement: typically 1.5–3× improvement over unstabilized value.
  • Cement stabilization: Add 4–8% Portland cement (ASTM C150) to achieve unconfined compressive strength q_u ≥ 300 psi at 7 days (ASTM D1633, withdrawn 2026). This yields a_i = 0.23 per Table 7.3-4.
  • Geosynthetic reinforcement: Biaxial geogrids (ASTM D6637; aperture size 1.0–1.5 in.) placed at subgrade/subbase interface to improve bearing and reduce differential settlement. Aperture Stability Modulus (ASM) ≥ 0.24 ft·lb/deg preferred for heavy container crane loads.
  • Full subgrade replacement: Remove and replace F3/F4 materials to frost depth or 5 ft below finished grade, whichever governs.
Yellow hydraulic excavator scooping soil from a deep excavation pit, revealing distinct soil layers, with a shopping center visible in the background
Photo 7.3.6-1. Excavation of unsuitable soil using hydraulic excavator in Columbus, Mississippi. Photograph courtesy of David M. Coleman.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Four cross-section diagrams labeled Case 1 through Case 4, showing complete, partial-depth, center-portion, and toe-portion excavation and replacement of soft m
Photo 7.3.6-2. Typical use of excavation and replacement methods for improving site conditions. Rollings and Rollings (1996).Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Hydraulic excavator working atop an excavation pit backfilled with granular material and geogrid reinforcement
Photo 7.3.6-3. After excavation, geogrid and granular replacement fill, Columbus, Mississippi. From the files of David M. Coleman.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Muddy roadway cut through a forested hillside showing an area requiring excavation and replacement, with construction equipment in the distance
Photo 7.3.6-4. Area requiring excavation and replacement, Sandlake-Galloway Road Project. From Tillamook County, Oregon.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Black geosynthetic fabric being unrolled into an excavated roadway trench alongside standing water, with a worker and construction equipment present
Photo 7.3.6-5. Excavation and geosynthetic placement prior to replacement, Sandlake-Galloway Road Project. From Tillamook County, Oregon.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Self-propelled yellow pan scraper hauling excavated soil on a highway construction site
Photo 7.3.6-6. Self-propelled pan scraper on Stage C of Highway 14, Waseca, MN. From EquipmentImages.net.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Tractor towing two tandem pan scrapers loaded with soil on a highway construction site
Photo 7.3.6-7. Towed scrapers on Stage C of Highway 14, Waseca, MN. From EquipmentImages.net.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
A steel-wheel roller compacting granular fill over a geosynthetic laid across a gravel road under construction, with a bulldozer and parked vehicles in the back
Photo 7.3.6-8. Placement of geosynthetic in roadway. Courtesy of National Highway Institute.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
An excavator and dump truck placing granular fill over a geosynthetic laid across a sandy road alignment under construction
Photo 7.3.6-9. Placement of geosynthetic in roadway. Courtesy of Kansas Department of Transportation.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Workers unrolling a geosynthetic across a sandy road base, with an excavator, dump trucks, and a pickup truck staged along the alignment
Photo 7.3.6-10. Placement of geosynthetic in roadway. From Kansas Department of Transportation.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
A wider view of workers placing a geosynthetic across a sandy road base ahead of fill placement by excavator and dump trucks
Photo 7.3.6-11. Placement of geosynthetic in roadway. From Kansas Department of Transportation.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Cement Treated Base (CTB)
Cement Treated Base (CTB)
Steps of Soil Lime Treatment
Steps of Soil Lime Treatment
Supplemental reference

Geotextile separation and geocell confinement (FHWA SHRP2 R02)

Table 19-S1. Separation vs. confinement for yard and access-road subgrades

Geotextile separatorGeocell confinement
FunctionKeeps base aggregate out of soft subgrade and subgrade fines out of the base; secondary filtration, drainage, reinforcement3-D honeycomb (HDPE or novel polymeric alloy) confines infill, raising stiffness and strength; reduces rutting and required base thickness
Where it fitsSubgrade soaked CBR 3–8 (Class 2 moderate-strength geotextile); seasonally weak, high-fines or pumping-susceptible soils. Little need where the soil stays dry.Soft to firm subgrade; most cost-effective with sand or rounded gravel infill (e.g., local material that would not otherwise qualify as base)
Design basisEmpirical (FHWA NHI-07-092 / AASHTO M 288 survivability, retention, permeability); separation does not reduce the base thickness needed for trafficNo FHWA method; research methods (e.g., KENLAYER damage analysis, modified Giroud–Han), modulus improvement factor capped at 7.6 for NPA cells
Construction notesEnd-dump base from the edge of the fabric; compact with a smooth-drum roller rather than vibratory compaction; maintain overlaps; hard to place in windStretch and pin cells, usually over a nonwoven separator; fill and compact (compaction inside cells is a known difficulty)
LimitationsNot in AASHTO M-E; life-cycle benefit not yet demonstrated; not economical where good base is cheapLimited design, QC/QA methods and long-term data; product cost
Types of Rollers
Types of Rollers
Soil Compaction and Maximum Dry Density
Soil Compaction and Maximum Dry Density
Smooth-Drum Vibratory Roller
Smooth-Drum Vibratory Roller
Padfoot (Sheepsfoot) Roller
Padfoot (Sheepsfoot) Roller

For railroad use, the same separation criteria apply beneath subballast on fine-grained subgrade, and geocells are an option for access roads and laydown areas that must carry heavy equipment over weak ground (Figures 19-S1 and 19-S2).

Placement of base course over a geotextile separator (photo: Minnesota DOT, via SHRP2 GeoTechTools).
Supplemental Figure 19-S1. Placement of base course over a geotextile separator (photo: Minnesota DOT, via SHRP2 GeoTechTools). Source: SHRP2 R02 / GeoTechTools (2012). Geosynthetic Separation in Pavement Systems — fact sheet, design guidance and photographs.

Source: SHRP2 R02 / GeoTechTools (2012). Geosynthetic Separation in Pavement Systems — fact sheet, design guidance and photographs · SHRP2 R02 / GeoTechTools (2012). Geocell Confinement in Pavement Systems — fact sheet, design guidance and photographs

Geocell-reinforced road construction (photo: J. Han, University of Kansas, via SHRP2 GeoTechTools).
Supplemental Figure 19-S2. Geocell-reinforced road construction (photo: J. Han, University of Kansas, via SHRP2 GeoTechTools). Source: SHRP2 R02 / GeoTechTools (2012). Geocell Confinement in Pavement Systems — fact sheet, design guidance and photographs.

Case study: 7.3.15.2 Desiccation cracks cut subgrade modulus by about a third (Look 2023), in §19.15 Case Studies.

Close-up of a geocell honeycomb structure with cells filled with soil, some cells filled and some awaiting infill
Photo 7.3.6-12. Geocell infilled with soil. From the files of Jie Han, University of Kansas. A closely related crop of this same photograph appears as the Fact Sheet document's own cover image.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
A wheel loader dumping fill material onto an installed geocell field at a construction site, with a worker in a high-visibility vest observing
Photo 7.3.6-13. Geocell-reinforced road construction. From the files of Jie Han, University of Kansas. A closely related crop of this same photograph appears as the Fact Sheet document's own cover image.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
A gravel logging road with a geosynthetic fabric berm along one edge, cleared timber and brush beyond it
Photo 7.3.6-14. Geosynthetic-reinforced temporary, unpaved road. From a National Highway Institute lecture. The Fact Sheet document's own cover image reuses this same photograph at higher resolution, reproduced here.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Construction equipment placing granular fill onto a geotextile fabric laid across a graded roadbed
Photo 7.3.6-15. Placement of geotextile during roadway construction. From the Kansas Department of Transportation. The Fact Sheet document's own cover image reuses this same photograph at higher resolution, reproduced here.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
A straightedge laid across a paved road surface at a measurement point marked with red paint, used to gauge pavement rutting on a test section
Photo 7.3.6-16. Straightedge rut-depth measurement on a test section. From the project case history document; caption not provided in the source.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Cross-section diagram of base aggregate resting on a geotextile over subgrade, labeling caking of aggregate above the geotextile, blinding of the geotextile's t
Photo 7.3.6-17. Definition of blinding, clogging, and caking. Black and Holtz (1999); with permission from ASCE.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
A motor grader spreading gravel base course over a geotextile laid across a road under construction, with a flagger and traffic signs along the alignment
Photo 7.3.6-18. Placement of base course materials over the geotextile in roadway. From Minnesota Department of Transportation.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
A roll of geotextile unrolled over a gravel road bed, with white PVC pipe cores from spent rolls lying alongside the seam
Photo 7.3.6-19. Placement of geotextile in roadway. From National Highway Institute Lecture notes.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Yellow grader working a wide rock cap aggregate roadway with a line of trucks behind it
Photo 7.3.6-20. Grading of rock cap aggregate. From Uhlmeyer et al. (2003), Transportation Research Record 1821, Figure 5(c), p. 45. Copyright, National Academy of Sciences. Reproduced with permission of the Transportation Research Board.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Cross-section diagram of a rock cap pavement system, labeled Asphalt Surface, Crushed Stone Base, Rock Cap Aggregate, and Prior Pavement or Subgrade
Photo 7.3.6-21. Rock cap overlaid with crushed stone subbase (cross-section). From Uhlmeyer et al. (2003), Transportation Research Record 1821, Figure 2(a), p. 41. Copyright, National Academy of Sciences. Reproduced with permission of the Transportation Research Board.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Green belly dump truck unloading rock cap aggregate onto a roadway under construction
Photo 7.3.6-22. Placement of rock cap with belly dump trucks. From Uhlmeyer et al. (2003), Transportation Research Record 1821, Figure 5(b), p. 45. Copyright, National Academy of Sciences. Reproduced with permission of the Transportation Research Board.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
A bulldozer pushing gravel base material across a black geotextile fabric laid over subgrade
Photo 7.3.6-23. Placement of base material on top of the geotextile. Photograph from www.tencate.com, courtesy of TenCate Geosynthetics North America.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
A tractor pulling a compaction roller unit over a gravel roadway on top of a geogrid
Photo 7.3.6-24. Compaction of base material on top of the geogrid. Photograph courtesy of North Dakota DOT. This same photograph is also used as the Fact Sheet document's cover image.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
7.3.7 Intermodal Yard Crane Rail Foundation Subgrade

Rail-mounted gantry cranes (RMG) impose wheel loads of 75–150 kips per wheel on crane rail foundation beams. The geotechnical design challenge is controlling differential settlement between adjacent crane rail beam pile caps:

Differential settlement criterion:

Δ Sallow = Lspan500    (crane rail alignment tolerance)

For a 50-ft span between crane rail beam pile caps: ΔS_allow = 50 × 12 in. / 500 = 1.2 in. maximum differential. Some owners tighten this to L/750 (0.80 in.) for high-cycle operations. Rubber-tired gantries (RTG) run on paved runways rather than rails, so their runways are designed as heavy-duty pavement.

Crane rail foundation design is addressed in Chapter 6.1 (bearing capacity) and Chapter 6.2 (settlement). The subgrade evaluation output for crane rail areas includes:

  • Subgrade CBR (minimum 10 for unpaved laydown zones; 15 for crane lane shoulders)
  • Settlement profile under crane wheel loads (Boussinesq stress distribution at depth)
  • Differential settlement estimate between pile cap locations
  • Subgrade variability assessment (coefficient of variation of CBR along crane runway ≤ 25%)

Case study: 7.3.15.3 Temporary haul road for a one-off heavy load (Look 2023), in §19.15 Case Studies.

Common Road Defects
Common Road Defects
Road Defects
Road Defects
7.3.8 Worked Examples
The three examples cover a flexible pavement, a rigid pavement and the seasonal subgrade modulus in a frost climate, for intermodal yards. Each is laid out as Given, Required, Equations, a flow chart of the steps with a spot check at each, and the Solution.
Example 7.3-1: Flexible Pavement for Reach Stacker Lanes

New reach stacker lanes at an intermodal yard expansion on a Class I railroad located in Kansas City, Missouri. The AASHTO 1993 equation gives the structural number the subgrade needs for the design traffic; the layers are then chosen to supply it. The example then shows how much a treated subgrade saves.

Reach stacker lanesAsphalt a1, D1 = ?Base a2, m2 = 0.90, D2 = ?Subbase m3 = 0.90, D3 = ?(Option) 5% lime, 12 in., Mr 9,000CL subgrade, CBR 4%, Mr = 6,000 psiSN = ? Section?GivenW18 = 8,000,000 ESALsCBR 4%; Mr = 6,000 psiZR = −1.645; S0 = 0.45ΔPSI = 2.2; m2 = m3 = 0.90Lime-treated Mr = 9,000 psiRequiredRequired SNLayer section with and without limeBlack = given; red = required
Given and required for Example 7.3-1.

Given

VariableValueDescription
W188,000,000 ESALs20-year design (assumed for illustration)
SubgradeCL; soaked CBR = 4%; Mr = 1,500 × 4 = 6,000 psi
ZR, S0−1.645 (R = 95%); 0.45
ΔPSI4.2 − 2.0 = 2.2
m2, m30.90Fair drainage
Treated Mr9,000 psi5% lime, top 12 in.

Required

  • Required SN
  • A layer section that supplies it, with and without lime treatment

Equations

  1. Eq. 1 (AASHTO 1993): log W18 = ZRS0 + 9.36 log(SN + 1) − 0.20 + log(ΔPSI/2.7)/[0.40 + 1,094/(SN + 1)5.19] + 2.32 log Mr − 8.07 — solve for SN by trial
  2. Eq. 2: SN = a1D1 + a2D2m2 + a3D3m3 — layer coefficients a = 0.44 (HMA), 0.14 (base), 0.11 (subbase)

Steps

Step 1 · Trial SN = 6.0 (Eq. 1)
−0.740 + 7.909 − 0.20 − 0.204 + 8.765 − 8.07
W18 = 28.8M: too high
↓
Step 2 · Trial SN = 4.5
−0.740 + 6.930 − 0.20 − 0.160 + 8.765 − 8.07
W18 = 3.35M: too low
↓
Step 3 · Solve
SN = 5.07 for 8.0M
↓
Step 4 · Sections (Eq. 2)
4-8-10: 1.76 + 1.01 + 0.99 = 3.76; 6-10-12: 2.64 + 1.26 + 1.19
3.76 (deficient); 5.09 ≥ 5.07
↓
Step 5 · With lime (Mr = 9,000 psi)
SN required 4.46; 6-8-9: 2.64 + 1.01 + 0.89
SN = 4.54 ≥ 4.46
Spot check: Saves 2 in. of base and 3 in. of subbase, about 56 lb/ft² of aggregate.
↓
Solution
SN = 5.07: 6 in. HMA, 10 in. base, 12 in. subbase; or 6-8-9 on lime-treated subgrade.

Solution

Required SN = 5.07. On the untreated subgrade use 6 in. HMA, 10 in. base and 12 in. subbase (SN 5.09). With the top 12 in. lime-treated, 6 in. HMA, 8 in. base and 9 in. subbase (SN 4.54) suffice.

The aggregate saved is worth roughly $0.50/ft² at an assumed $18/ton, which must be weighed against the cost of the lime treatment. Treatment also lifts the subgrade CBR above an assumed 8% minimum, which matters for construction traffic as much as for the design.

Example 7.3-2: Rigid Pavement for a Crane Runway

An RTG crane runway and reach stacker lanes at an intermodal terminal on a Class I railroad located in Winnipeg. The silty sand subgrade is frost-susceptible to a design frost depth of 8 ft and is replaced with granular material, which also raises the support for the slab.

Crane runwayDoweled concrete slab D = ?Granular replacement to 8.0 ft (keff = 200 pci)SM subgrade, CBR 7%, F3D = ?GivenW18 = 12,000,000 ESALsZR −1.645; S0 0.35; ΔPSI 2.5f′c 4,500; S′c 650 psiEc = 3.82×106 psiJ = 3.2; Cd = 1.0; keff 200 pciRequiredSlab thickness DBlack = given; red = required
Given and required for Example 7.3-2.

Given

VariableValueDescription
W1812,000,000 ESALs
ZR, S0−1.645; 0.35
ΔPSI, pt2.5; 2.5
SubgradeSM, CBR 7%, F3: replaced to 8.0 ft with granular subbase
keff200 pciOn the replacement subbase
Concretef′c = 4,500 psi; S′c = 650 psi; Ec = 3.82×106 psi
J, Cd3.2 (doweled); 1.0

Required

  • Slab thickness D

Equations

  1. Eq. 1 (AASHTO 1993): log W18 = ZRS0 + 7.35 log(D + 1) − 0.06 + log(ΔPSI/3.0)/[1 + 1.624×107/(D + 1)8.46] + (4.22 − 0.32pt) log{S′cCd(D0.75 − 1.132) / [215.63J(D0.75 − 18.42/(Ec/k)0.25)]} — rigid pavement; solve for D by trial

Steps

Step 1 · D = 11 in.
(Ec/k)0.25 = 11.76; ratio term log(3,580/3,494) = 0.0105
W18 ≈ 18.5M ≥ 12M
↓
Step 2 · D = 10 in.
W18 ≈ 10.1M < 12M
↓
Step 3 · Thickness
D = 11 in. governs
↓
Solution
11-in. doweled JPCP.

Solution

An 11-in. doweled jointed plain concrete slab (about 18.5M ESAL capacity); 10 in. carries only about 10M.

Use #5 dowels at 12 in. across transverse joints spaced at 15 ft. Replace the F3 subgrade to 8.0 ft with non-frost-susceptible granular fill (no more than 3% passing the No. 200 sieve) over a geotextile separator; without it, frost heave would break the slab regardless of its thickness.

Example 7.3-3: Frost Depth and Effective Seasonal Resilient Modulus

Access roads at a terminal on a Class I railroad located in Winnipeg. The subgrade is stiff when frozen and very soft during the spring thaw. Averaging the moduli would hide the thaw; the AASHTO relative damage method weights each month by the damage it does.

2000400060008000MonthMr (psi)JunJulAugSepOctNovDecJanFebMarAprMayFrost depth = ? Effective Mr = ?GivenCL: w = 22%; γd = 95 pcfFI = 3,500 °F-dayskf = 1.10 BTU/hr·ft·°FMr by month (chart)RequiredFrost depthEffective seasonal Mr Black = given; red = required
Given and required for Example 7.3-3.

Given

VariableValueDescription
SubgradeCL; w = 22%; γd = 95 pcf
FI3,500 °F-daysDesign freezing index
kf1.10 BTU/hr·ft·°FFrozen conductivity
Mr by month5,500 (Jun–Oct); 4,000 (Nov); 8,000 (Dec–Feb); 2,000 (Mar); 1,375 (Apr–May) psi

Required

  • Frost depth
  • Effective Mr

Equations

  1. Eq. 1: L = 144 w γd; Zf = √(48 kf FI / L) — latent heat and Stefan frost depth, ft
  2. Eq. 2: uf = 1.18×108 Mr−2.32; Mr,eff = (ūf/1.18×108)−1/2.32 — AASHTO relative damage

Steps

Step 1 · Latent heat
144 × 0.22 × 95
3,010 BTU/ft³
↓
Step 2 · Frost depth
√(48 × 1.10 × 3,500 / 3,010) = √61.4
Zf = 7.8 ft
↓
Step 3 · Monthly damage
0.248, 0.519, 0.104, 2.59, 6.18
ūf = (5×0.248 + 0.519 + 3×0.104 + 2.59 + 2×6.18)/12 = 1.42
↓
Step 4 · Mr,eff
(1.42/1.18×108)−1/2.32
2,590 psi
Spot check: The harmonic mean would give 3,440 psi; the two thaw months carry 83% of the damage.
↓
Solution
Zf = 7.8 ft; design Mr = 2,590 psi.

Solution

Frost penetrates about 7.8 ft, and the effective design Mr is about 2,590 psi, less than half the summer value of 5,500 psi.

Recompute SN with this value. Replacing the frost-susceptible subgrade with granular material through the frost depth removes most of the thaw weakening at the depths that matter.

7.3.9 Representative Data Table
Table 7.3-7: Laboratory Subgrade Testing Results — Class I railroad Intermodal Expansion located in Kansas City
Sample IDDepth (ft)USCSLLPLPIP-200 (%)γ_d (pcf)w_opt (%)CBR soaked (%)M_r (psi)FS Class
TP-1 / 0–20.5CL3819196898163.55,250F3
TP-1 / 2–43.0CL4120217296183.04,500F3
TP-2 / 0–20.5ML3224874100144.06,000F3
TP-2 / 2–43.0CL4422227895192.53,750F3
TP-3 / 0–20.5SM2821738108128.512,750F2
TP-3 / 2–43.0SC35181752102155.58,250F3
TP-4 / 0–20.5GC30181218118101827,000F2
TP-4 / 2–43.0GM26161022116111522,500F2

All CBR values at Modified Proctor 95% RC, soaked 4 days per ASTM D1883. M_r estimated from CBR using Heukelom & Klomp (CBR ≤ 10) and NCHRP 1-37A (MEPDG) (CBR > 10).

7.3.10 Reference Photographs
Flexible Pavement Layers — Subgrade to Asphalt
Flexible Pavement Layers — Subgrade to Asphalt
TxDOT Soil Classes C1–C4 for Embankment and Subgrade
TxDOT Soil Classes C1–C4 for Embankment and Subgrade
Pavement Design
Pavement Design
Cone Penetration Test
Cone Penetration Test
Pile Foundation Execution Inspection
Pile Foundation Execution Inspection
7.3.11 Practical Recommendations
  1. Test the subgrade at finished-grade elevation, not natural grade. Many intermodal yard designs involve cut-and-fill grading of 3–8 ft. The pavement subgrade is the constructed fill surface, not the existing ground surface. Obtain CBR and M_r from test pits or undisturbed samples at the design subgrade elevation. Conducting CBR testing only at the surface of existing ground produces non-representative values when significant earthwork is planned.
  2. Perform soaked CBR as the design value — never unsoaked. Intermodal yards in humid regions (the Southeast and the Mid-Atlantic) experience frequent storm events and elevated seasonal groundwater. Unsoaked CBR values commonly exceed soaked CBR by 3–8× for CL and CH soils. Owner railroads may require soaked CBR per ASTM D1883 as the governing design value.
  3. Separate crane rail foundation design from reach stacker lane design. RMG crane rails impose point loads 5–10× greater than reach stacker distributed loads. Design crane rail foundation beams on piles (Chapter 6.1) independently of the pavement structural number calculation. Intermodal crane runway serviceability is governed by differential settlement (Chapter 6.2), not pavement structural number.
  4. Address frost-susceptible materials at design stage, not during construction. Frost susceptibility classification (Table 7.3-5) must be completed during the geotechnical investigation, not deferred to construction. Discovering F4 material at frost depth during grading operations triggers costly change orders and schedule impacts. Budget for complete soil profiling to Z_f + 3 ft at all facility locations above 44°N latitude.
  5. Apply lime or cement stabilization conservatively in freeze-thaw zones. Lime-stabilized clay subgrades in climates with frequent freeze-thaw cycling (Winnipeg, Chicago, Minneapolis) may experience swell and strength loss from ettringite formation where soluble sulfate exceeds about 3,000 ppm. Test for sulfates (ASTM D4327) before specifying lime treatment on the prairies. Cement and fly ash are also affected, so follow the NLA guidance in Chapter 7.2.
  6. Document subgrade variability along crane runway alignments. Crane runway alignment over variable subgrade produces differential settlement that disrupts crane operations. Minimum investigation for crane runways: CBR at 50-ft intervals along each rail, with test pits to 10-ft depth. Flag locations where CBR coefficient of variation exceeds 25% for additional investigation or localized improvement.
  7. Include a pavement management monitoring program in deliverables. Owner railroads may maintain facility pavement management systems. The geotechnical GDR should include a subgrade baseline data table suitable for direct import into the client's PAVER or similar pavement management system, with unique asset IDs, GPS coordinates, subgrade M_r, design ESAL, and year of construction for each pavement section.
Yellow resonant breaker machine rubblizing an existing pavement surface on a highway, with workers in orange safety vests alongside
Photo 7.3.11-1. Rubblization using RMI Resonant Breaker. Photograph courtesy of Resonant Machines, Inc., 2005.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Semi-log plot of percent finer versus particle size for ten gradation test stations of recycled pavement material, showing a broadly graded distribution
Photo 7.3.11-2. Particle distribution of the recycled pavement material (RPM). Li et al. (2007); with permission from ASCE.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Overhead view of a hot in-place recycling train of equipment working along a multi-lane urban road
Photo 7.3.11-3. Hot In-place Recycling (HIR) train. Photograph courtesy of ARRA (2001).Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Black and white photograph of a multi-unit cold in-place recycling train of equipment along a rural road
Photo 7.3.11-4. Multi-unit Cold In-place Recycling train. Photograph courtesy of ARRA (2001).Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Tanker truck and reclaiming machine performing full-depth reclamation on a gravel road, with workers in orange safety vests
Photo 7.3.11-5. Full-Depth Reclamation (FDR). From FHWA-SA-98-042; Kandhal and Mallick (1997).Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Dump truck being loaded with milled asphalt material via conveyor from a cold milling machine on a highway
Photo 7.3.11-6. Cold milling. From FHWA-SA-98-042; Kandhal and Mallick (1997).Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Large red break-and-seat breaker implement being towed by a semi truck along a rural road
Photo 7.3.11-7. Break and seat operation. Photograph courtesy of Antigo Construction, Inc.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Multi-head breaker machine with several hammer heads actively rubblizing pavement into small fragments on a highway shoulder
Photo 7.3.11-8. Rubblization using MHB Badger Breaker. Photograph courtesy of Antigo Construction, Inc.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Supplemental reference

Case: rubblizing a failed concrete entrance road inside a 7-day curfew (Class I railroad Intermodal located in Lathrop, CA)

The only access road to the railroad's Lathrop, CA intermodal facility (about 300,000 lifts/yr) was 7.5-in. unreinforced, undoweled PCC panels with corner breaks, cracking and faulting, and signs of weak subgrade. Grinding the faults would not have fixed the rocking panels. Full-depth replacement was estimated at about twice the rehabilitation budget. About 15,100 yd2 were instead rubblized in place with a multi-head breaker and overlaid with HMA within the seven-day road curfew. The authors estimate about 250% savings versus full-depth PCC for the same 20-year life. Geotechnical points from the project:

Longitudinal Cracks Between Asphalt Lanes
Longitudinal Cracks Between Asphalt Lanes
  • Drainage first: trapped water under the slabs defeats rubblization. Guidance cited in the paper recommends edge drains working at least two weeks beforehand unless the section drains freely (Lathrop sat on an embankment with side swales). The new HMA can then trap moisture, so permanent drainage matters.
  • Subgrade support: the breaker must not punch rubble into the subgrade. Buncher’s airfield chart relating subgrade CBR and slab thickness put Lathrop (CBR ≈ 7.8) in the low-risk category; slabs ≥ 9 in. or with substantial subbase are rarely a problem. Bid a contingency quantity of full-depth replacement for soft spots, and proof-roll behind the breaker with a heavy vibratory steel-wheel roller.
  • Test strip and test pit to confirm fragment size, no contamination of the rubblized layer by subgrade fines, and no shear distortion of the subgrade.
  • Vibration: four shallow culverts were protected by removing the pavement full depth over five panel lengths centered on each pipe instead of rubblizing over them.
  • Production was about 400 linear ft/hr (≈ 350 yd2/hr).

Source: Limburg, A. and Nielsen, D. (2019). “Fast-Tracked Pavement Maintenance Using Concrete Rubblization.” AREMA 2019 Annual Conference Proceedings

Project management · Bull (2015)

Counting Closures in a Life-Cycle Cost Comparison: The I-710 Case

In Bull’s volume, Lee, Kim and Harvey (Chapter 3.8) check the pavement type chosen for Caltrans’ I-710 Long Beach rehabilitation. They follow the Caltrans life-cycle cost procedure: a 60-year analysis period, a 4% real discount rate and no salvage value. Three alternatives were compared: innovative long-life asphalt (the design actually built), standard asphalt, and long-life concrete. Two tools were used. CA4PRS estimated the construction schedule, the number of closures, and the work-zone user delay for the initial work and for every future maintenance and rehabilitation event. RealCost then discounted the agency and user costs.

Potholes in Asphalt Pavement & Repair Methods
Potholes in Asphalt Pavement & Repair Methods
Types of Asphalt Pavement Distresses
Types of Asphalt Pavement Distresses
Stacked life-cycle present values for the three I-710 alternatives, split into agency cost (by section type), annual maintenance and road user cost.
Figure 19-PM1. Stacked life-cycle present values for the three I-710 alternatives, split into agency cost (by section type), annual maintenance and road user cost. Source: Bull (2015), Figure 4.4.

Agency cost started from unit prices × quantities, taken from the contractor bid database. Allowances for traffic handling, drainage, storm-water protection, minor items, mobilization, supplemental work and a 20% contingency were then applied as cumulative multipliers. Together these multiplied the bare pavement cost by 1.80.

The closure count proved central. The built design needed 10 fifty-five-hour weekend closures at first and about 296 seven-hour night closures over 60 years. The concrete option needed 30 weekend closures at first, a further 18 at year 50, and about 148 nights.

Table 19-PM1. Table: 60-year present values (after Lee, Kim and Harvey in Bull 2015, Table 4.3)

AlternativeAgency costUser costTotal
Innovative long-life AC$33.2M$5.8M$39.0M
Standard AC$41.1M$12.1M$53.2M
Long-life PCC$50.4M$9.8M$60.2M

The standard asphalt option had the lowest initial cost but the highest life-cycle user cost, about twice that of the design that was built.

For railroad work: for intermodal yard pavements, crane-rail runways and grade-crossing approaches, compare subgrade treatment and pavement options the way Caltrans did. For each alternative:

  • Lay out its maintenance and rehabilitation sequence over the full period.
  • Count the yard-track, lane or crane outages each event needs.
  • Price those outages as a user cost, using lost lifts, terminal dwell or train delay.

The same accounting applies to track itself: count the track windows each subgrade option needs over its life, not only the windows for first construction. State the markups explicitly, as the cumulative multiplier table does, so that a reviewer can see how much of the estimate is contingency.

Source: Bull, J. W. (ed.) (2015). Life Cycle Costing for the Analysis, Management and Maintenance of Civil Engineering Infrastructure. Dunbeath, Scotland: Whittles Publishing, pp. 91–108. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • RK-10 UCS from point load index σ꜀Use: Hard, isotropic rock; quick strength index in field. Limits: K varies widely with rock type and anisotropy; calibrate with lab UCS. Unreliable in weak rock (σc < ~3,600 psi).
7.3.12 Pavement Subgrade Evaluation Checklist

Checklist · Part VIII · Pavements

Pavement Subgrade Evaluation Checklist

Site Investigation Phase0 of 6
Laboratory Testing Phase0 of 7
Design Phase0 of 8
Deliverable Phase0 of 6
Ticks are saved in this browser.
Plain text version

Site Investigation Phase

  • [ ] Confirm finished-grade elevation from grading plan before scheduling test pits
  • [ ] Excavate test pits to Z_f + 3 ft depth at northern facilities
  • [ ] Collect undisturbed (Shelby tube) or bulk samples at 1-ft intervals to subbase depth
  • [ ] Measure depth to groundwater and document seasonal high-water table records
  • [ ] Test for sulfate content (ASTM D4327) at all sites where lime stabilization is planned
  • [ ] Photograph and log each test pit with USCS classification and frost susceptibility group noted

Laboratory Testing Phase

  • [ ] Run Modified Proctor (ASTM D1557) for all subgrade materials intended for compaction
  • [ ] Perform soaked CBR at 95% Modified Proctor RC (ASTM D1883)
  • [ ] Run Atterberg Limits (ASTM D4318) on all fine-grained samples
  • [ ] Run grain size analysis (ASTM D7928 / D6913) with P-200 determination on all samples
  • [ ] Confirm frost susceptibility classification per Table 7.3-5 for all samples in frost zones
  • [ ] Test lime or cement-stabilized specimens for CBR at 7-day cure (if stabilization is proposed)
  • [ ] Conduct sulfate test if PI > 20 or existing lime treatment has shown distress
5 Major Pavement Distress
5 Major Pavement Distress

Design Phase

  • [ ] Calculate design ESAL for target traffic (reach stackers, truck tractors, service vehicles)
  • [ ] Select reliability R and S₀ per the owner railroad's standard
  • [ ] Confirm design M_r from soaked CBR; apply the AASHTO seasonal effective M_r if frost zone
  • [ ] Calculate SN (flexible) or D (rigid) per AASHTO 1993
  • [ ] Design layer thicknesses using layer coefficients (Table 7.3-4) and drainage coefficients
  • [ ] Check crane runway differential settlement criteria separately from pavement SN
  • [ ] Specify compaction criteria per Table 7.3-6 for client
  • [ ] Specify subgrade stabilization scope and method if CBR < client minimum

Deliverable Phase

  • [ ] Provide test pit logs with CBR, M_r, FS class, and USCS symbol for each sample
  • [ ] Include pavement design calculation summary (AASHTO inputs and SN/D result)
  • [ ] Include typical pavement cross-section detail with annotated layer materials and thicknesses
  • [ ] Provide subgrade improvement specification (lime, cement, geosynthetic) if applicable
  • [ ] Provide frost design calculations (Z_f, seasonal M_r) for all northern facility sites
  • [ ] Provide subgrade baseline data table formatted for client's pavement management system
7.3.13 Practice Questions
Each question is worked in the same five parts as the examples.
Question 7.3-1: Structural Number for a Florida Yard

Problem Statement

A Class I railroad located in Florida is paving a new intermodal yard on a lean clay subgrade with a soaked CBR of 5%. The design traffic from trucks and container handlers is 10 million ESALs. The engineer must find the resilient modulus and the required structural number and select a flexible pavement section.

The method of Example 7.3-1.

Florida intermodal yardAsphalt D1 = ?Base D2 = ?Subbase D3 = ?CL subgrade, soaked CBR 5%Mr, SN = ? Section?GivenCBR 5% soaked (CL)W18 = 10,000,000 ESALsR = 95%; S0 = 0.45; ΔPSI 2.2RequiredMr SNA sectionBlack = given; red = required
Given and required for Question 7.3-1.

Given

VariableValueDescription
CBR5% soaked; CL
W1810,000,000 ESALs
R, S0, ΔPSI95%; 0.45; 2.2

Required

  • Mr, SN and a section

Equations

  1. Eq. 0: Mr = 1,500 CBR — Heukelom and Klomp
  2. Eq. 1 (AASHTO 1993): log W18 = ZRS0 + 9.36 log(SN + 1) − 0.20 + log(ΔPSI/2.7)/[0.40 + 1,094/(SN + 1)5.19] + 2.32 log Mr − 8.07 — solve for SN by trial
  3. Eq. 2: SN = a1D1 + a2D2m2 + a3D3m3 — layer coefficients a = 0.44 (HMA), 0.14 (base), 0.11 (subbase)

Steps

Step 1 · Mr
1,500 × 5
7,500 psi
↓
Step 2 · Trial SN = 5.0
W18 = 12.2M: slightly high
↓
Step 3 · Solve
SN = 4.87
↓
Step 4 · Sections
6-8-10: 2.64 + 1.01 + 0.99 = 4.64; 6-10-10: 2.64 + 1.26 + 0.99 = 4.89
Use 6-10-10
↓
Solution
SN = 4.87: 6 in. HMA, 10 in. base, 10 in. subbase.

Solution

Mr = 7,500 psi; required SN = 4.87; use 6 in. HMA, 10 in. base and 10 in. subbase (SN 4.89).

A 6-8-10 section (SN 4.64) is about 5% short. Lime treatment of the subgrade to an assumed 8% CBR would reduce the required SN and is worth pricing.

Question 7.3-2: Frost Depth in a Silt Subgrade

Problem Statement

A railroad intermodal terminal located in Regina, Saskatchewan has a silt subgrade with the water content, density and thermal conductivity shown, and a design freezing index of 3,200 °F-days. The engineer must estimate the frost penetration depth and frost group and recommend how to protect the yard pavement.

The method of Example 7.3-3.

Yard pavementSilt (ML): w = 18%, γd = 102 pcffrost lineFrost depth = ?Frost group = ? Protection?GivenFI = 3,200 °F-days (Regina, SK)ML; w = 18%; γd = 102 pcfkf = 1.05 BTU/hr·ft·°FRequiredFrost penetration depthFrost groupPavement protectionBlack = given; red = required
Given and required for Question 7.3-2.

Given

VariableValueDescription
FI3,200 °F-daysRegina, Saskatchewan
SoilML; w = 18%; γd = 102 pcf
kf1.05 BTU/hr·ft·°F

Required

  • Frost depth and frost group

Equations

  1. Eq. 1: L = 144 w γd; Zf = √(48 kf FI / L)

Steps

Step 1 · L
144 × 0.18 × 102
2,644 BTU/ft³
↓
Step 2 · Zf
√(161,280/2,644)
7.8 ft
↓
Step 3 · Frost group
Silt: F4
↓
Solution
Zf = 7.8 ft; F4.

Solution

Frost depth about 7.8 ft; the silt is group F4, the most susceptible.

Replace the silt to the frost depth with non-frost-susceptible granular material (no more than 3% fines) over a drainage blanket at the subgrade interface.

Question 7.3-3: ESALs From a Reach Stacker

Problem Statement

Reach stackers will move containers at a railroad intermodal yard about 300 times a day, with the loaded and empty tandem loads shown. The pavement designer needs the traffic in equivalent loads. The engineer must estimate the ESALs per move and per year by the fourth-power rule and compare them with a typical yard pavement design life.

Equivalent loads from heavy container handlers by the fourth-power rule.

Reach stackerContainerLoaded tandem 110,000 lbEmpty tandem 66,000 lbESALs per move = ? Per year = ?300 moves/day; reference 32,000-lb tandem = 1GivenLoaded tandem 110,000 lbEmpty tandem 66,000 lb (60%)32,000-lb tandem = 1 equivalent300 moves/dayRequiredESALs per moveESALs per yearCompare with design lifeBlack = given; red = required
Given and required for Question 7.3-3.

Given

VariableValueDescription
Loaded tandem110,000 lb
Empty tandem66,000 lb (60% assumed)
Reference32,000-lb tandem = 1 equivalent (simplified)
Traffic300 moves/day

Required

  • ESALs per move and per year

Equations

  1. Eq. 1: ESAL = (P/Pref)4 — fourth-power rule

Steps

Step 1 · Loaded
(110/32)4 = 3.43754
139.6
↓
Step 2 · Empty
(66/32)4
18.1
↓
Step 3 · Annual
157.7 × 300 × 365
About 17.3 million
↓
Solution
About 158 ESALs per move; 17.3M per year.

Solution

About 158 ESALs per move and 17.3 million per year.

One year of this traffic exceeds a typical 8M-ESAL design life, so either the traffic estimate must be refined or the pavement should be rigid. The fourth-power rule with a 32-kip tandem reference is a simplification; use the AASHTO load equivalency tables for design.

Question 7.3-4: Slab Thickness From a Laboratory Mr

Problem Statement

A crane runway slab is planned at a railroad intermodal terminal on a subgrade with the laboratory resilient modulus shown. The design traffic is 15 million ESALs, with the other design inputs listed. The engineer must find the modulus of subgrade reaction and the required thickness of a jointed concrete slab.

The method of Example 7.3-2.

Crane runwayJointed concrete slab D = ?Subgrade, laboratory Mr = 4,500 psik = ? D = ?GivenMr = 4,500 psiW18 = 15M ESALsR 95%; S0 0.35; S′c 650 psiJ 3.2; Cd 1.0; pt 2.5Requiredk (modulus of subgrade reaction)Slab thicknessBlack = given; red = required
Given and required for Question 7.3-4.

Given

VariableValueDescription
Mr4,500 psi
W1815M ESALs
OtherR = 95%, S0 = 0.35, S′c = 650 psi, J = 3.2, Cd = 1.0, pt = 2.5

Required

  • k and slab thickness

Equations

  1. Eq. 0: k = Mr/19.4 — AASHTO
  2. Eq. 1 (AASHTO 1993): log W18 = ZRS0 + 7.35 log(D + 1) − 0.06 + log(ΔPSI/3.0)/[1 + 1.624×107/(D + 1)8.46] + (4.22 − 0.32pt) log{S′cCd(D0.75 − 1.132) / [215.63J(D0.75 − 18.42/(Ec/k)0.25)]} — rigid pavement; solve for D by trial

Steps

Step 1 · k
4,500/19.4
232 pci
↓
Step 2 · D = 11 in.
W18 ≈ 19.4M ≥ 15M
↓
Step 3 · D = 10.5 in.
W18 ≈ 14.4M < 15M
↓
Solution
11 in. required.

Solution

k ≈ 232 pci; an 11-in. slab is required (10.5 in. carries only about 14.4M).

Use 11-in. doweled JPCP on a 6-in. base, with #5 dowels at transverse joints spaced at 15 ft.

Question 7.3-5: Group Index and Treatment of a Fat Clay Subgrade

Problem Statement

A subgrade sample from a railroad intermodal yard located in Thunder Bay, Ontario has the Atterberg limits, fines and CBR shown. The engineer must classify the soil in the AASHTO system with its group index and decide whether it can support the yard pavement or must be treated or replaced.

102030405060708090102030405060A-lineU-lineCLCHMLMH or OHLL = 50Liquid limit, LL (%)Plasticity index, PI (%)Yard subgrade: LL 62, PI 40AASHTO group, GI = ?GivenLL = 62; PL = 22 (PI 40)F = 88% passing No. 200CBR = 2%Thunder Bay, Ontario yardRequiredAASHTO group and group indexSuitability and treatmentBlack = given; red = required
Given and required for Question 7.3-5.

Given

VariableValueDescription
LL, PL62; 22
F88%Passing No. 200
CBR2%

Required

  • AASHTO group and GI
  • Suitability and treatment

Equations

  1. Eq. 2.2-10: GI = (F − 35)[0.2 + 0.005(LL − 40)] + 0.01(F − 15)(PI − 10)

Steps

Step 1 · PI
40
↓
Step 2 · GI
53 × 0.31 + 0.01 × 73 × 30 = 16.4 + 21.9
GI = 38
↓
Step 3 · Group
A-7-6(38): very poor
↓
Step 4 · Frost
Clay with PI > 12: F3
↓
Solution
A-7-6(38); remove and replace or treat.

Solution

A-7-6 with GI = 38: unsuitable as subgrade.

Remove and replace the clay to the frost depth with non-frost-susceptible granular fill over a drainage blanket, or, where the removal depth exceeds about 8 ft and crane rail settlement governs, consider deep soil mixing (Chapter 7.2). With Mr of only about 3,000 psi, any pavement placed directly on it would be very thick.

7.3.14 Cross-References
TopicRefer To
Soil classification (USCS and AASHTO)Chapter 2.2, Sections 2.2.2–2.2.5
In situ testing for M_r (PLT, DCP)Chapter 5.1, Section 5.1.3
Groundwater depth and seasonal variationChapter 2.8, Sections 2.8.2–2.8.4
Bearing capacity under crane rail loadsChapter 6.1, Sections 6.1.2–6.1.4
Settlement under surcharge / crane loadsChapter 6.2, Sections 6.2.3–6.2.5
Ground improvement for subgrade upgradeChapter 7.2
Subgrade compaction testingChapter 5.3, Sections 5.3.1–5.3.2
Laboratory CBR, Proctor, Atterberg LimitsChapter 5.2, Sections 5.2.2, 5.2.5, 5.2.6
Report format for geotechnical pavement dataChapter 8.4, Section 8.4.4

End of Chapter 7.3 — Pavement Subgrade Evaluation

7.3.15 Case Studies

Field case studies by Burt G. Look, from Earthworks: Theory to Practice – Design and Construction (CRC Press/Balkema, 2023), chosen for this chapter’s topics. Each is summarized from the book with its key figures and a closing note on railroad application added by the authors of this manual. Credit for the case material belongs to Look; see item S10 under Supplemental References.

Case Study 19.15.1 — Chasing a CBR of 7% into competent rock
Case study · Look (2023) §6.11

Related section: 7.3.2 Subgrade Strength Testing

Urban road works at Kelvin Grove, Brisbane (2002) required a soaked subgrade CBR of 7% over residual soil and near-surface phyllite. The weathered rock at subgrade level degraded to soil after rain. Samples were taken from the degraded surface with its clay seams, and the laboratory removed the “stone” sizes. The CBR came back at 5% or less. Two further rounds of excavation, each needing a rock-breaker attachment to reach the next sample depth, also failed, ending 4.9 ft below design level, with about AU$100,000 of claims for “unsuitable subgrade” and delays in a busy urban area.

Look’s review found that only the top 4 in had degraded. Below it was competent rock (it needed a rock breaker) with a CBR well above 10%, and once the pavement covered it no further degradation would occur. The tests themselves were unrepresentative because the stone fraction was discarded, so the low CBR could be disregarded.

For railroad work: the same cycle can play out under a new track or yard pavement in weathered shale or phyllite. Protect the formation from rain, trim the softened skin, and check whether the sample is representative before ordering more over-excavation.

The over-excavation cycle at Kelvin Grove: each round of clay-rich samples with stone removed failed CBR 7%.
Figure 19-LK1. The over-excavation cycle at Kelvin Grove: each round of clay-rich samples with stone removed failed CBR 7%. Source: Look (2023), Figure 6.11-1, p. 193.

Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §6.11, pp. 192–194. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.

Case Study 19.15.2 — Desiccation cracks cut subgrade modulus by about a third
Case study · Look (2023) §10.16

Related section: 7.3.6 Subgrade Preparation and Compaction Criteria

An expansive clay subgrade passed its density tests (above 95% standard MDD) and was then left uncovered for several weeks of wind and heat. Desiccation cracks appeared, and the question was whether the design modulus of 7,200 psi (CBR about 5%) still held. Plate load tests on cracked and uncracked areas, using the site roller as reaction, showed the cracked areas reached about 60% of the uncracked modulus on the first load cycle and 70% on the second, which is used for fill. The target was EV2 above 7,200 psi at formation level and above 4,350 psi below it. A one-third loss of strength or modulus is typical for fissured or desiccated clays in design.

Table 19-LK1. Plate load tests on uncracked and cracked compacted clay (after Look 2023, Table 10.18)

Load cycleUncracked E (psi)Cracked E (psi)Ratio
First4,6002,760~60%
Second11,6008,10070%

For railroad work: a finished clay subgrade awaiting subballast should be covered or kept moist. If it cracks, re-test it before placing subballast; a passing density test from before the drying no longer applies.

Plate load test on a cracked area, using the site roller as reaction.
Figure 19-LK2. Plate load test on a cracked area, using the site roller as reaction. Source: Look (2023), Figure 10.17-2, p. 367.

Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §10.16, pp. 366–368. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.

Case Study 19.15.3 — Temporary haul road for a one-off heavy load
Case study · Look (2023) §11.7

Related section: 7.3.7 Intermodal Yard Crane Rail Foundation Subgrade

Wind-farm and substation access roads may carry a single heavy delivery, where a bogged transporter can cost over a million dollars. A 22-ton or 44-ton axle exerts about 92 or 116 psi at the running surface. These are wheeled loads, so the BR470 working-platform method for tracked plant does not apply, and neither does ordinary road pavement design; the Giroud and Han (2004) method is typically used. Roads and hardstands typically need 5,200 and 6,300 psf allowable bearing, more on grades above about 5%.

Soaked tests and drainage are usually left out of a one-off design for cost reasons, so rain is the main risk: Look treats more than about 0.8 in of rain as high risk when an unsoaked CBR was used. At this site the proof roll failed the day before the move, after 2.1 in. and 1.1 in. of rain two and three days earlier. No passing proof roll was seen, but the equipment went on anyway, with significant consequences. Deep ruts under one wheel and none under the other showed non-uniform construction or support.

Recommended field data: DCP, vane shear, light falling-weight deflectometer and plate load tests, with plate tests kept to hardstands and critical spots. The maximum plate pressure reached is not the allowable bearing capacity. In one example a 1,250 psf design subgrade strength, with influence extending 24–31 in, gave calculated ruts above 2 in.

Table 19-LK2. Ground contact pressure by axle load (after Look 2023, Table 11.5)

Axle load (tons)Wheel load (tons)Contact area (in.²)Contact pressure
136.616780 psi
221724092 psi
4422380116 psi

For railroad work: the same logic applies to crane pads and temporary access for bridge erection, transformer delivery to traction substations and intermodal heavy lifts. Hold the move on a failed proof roll after rain.

Deep rutting under one wheel and little under the other: non-uniform support across the road.
Figure 19-LK3. Deep rutting under one wheel and little under the other: non-uniform support across the road. Source: Look (2023), Figure 11.7-2, p. 391.

Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §11.7, pp. 390–392. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.

7.3.16 Apps and Tools21

The web apps and the Geotechnical Analysis Suite calculators and workbook guides for this chapter, gathered here from across the manual in the November 2026 restructure: 21 tools (21 interactive calculators). Where a tool applies to a particular section of this chapter it is also placed in that section in an orange tools strip. Each row lists the chapters and sections where the tool is used. Calculators open on dirtbert.com (sign-in required).

Apps

Each app runs in a web browser on a desktop or a phone, with nothing to install. How to use the apps (1.0.3).

Tools

Pavements, Subgrade & Frost
PVAASHTO AC OverlayUsed in Chapter 7.3, 7.3.3 AASHTO 1993 Flexible Pavement DesignCalculator ▸Guide
PVAASHTO Equivalent Axle Load FactorsUsed in Chapter 7.3, 7.3.3 AASHTO 1993 Flexible Pavement DesignCalculator ▸Guide
PVAASHTO Flexible PavementUsed in Chapter 7.3, 7.3.3 AASHTO 1993 Flexible Pavement DesignCalculator ▸Guide
PVAASHTO PCCVBA errorUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVAASHTO Rigid PavementUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVAsphalt Institute Flexible Pavement — HeavyUsed in Chapter 7.3, 7.3.3 AASHTO 1993 Flexible Pavement DesignCalculator ▸Guide
PVCBR CorrelationsUsed in Chapter 2.2, 2.2.5 AASHTO M 145 Classification; Chapter 1.4, Applies to the chapter as a whole; Chapter 5.2, Applies to the chapter as a whole; Chapter 7.3, 7.3.2 Subgrade Strength TestingCalculator ▸Guide
PVCBR Statistical ValuesUsed in Chapter 5.2, 5.2.3 Test Methods — ASTM Standards and English Unit Outputs; Chapter 6.3, 7.3.2 Subgrade Strength TestingCalculator ▸Guide
PVContainer Handler Wheel LoadsUsed in Chapter 7.3, 7.3.7 Intermodal Yard Crane Rail Foundation SubgradeCalculator ▸Guide
PVDowel Bar DesignUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVDowel Bar Design — IntermodalUsed in Chapter 7.3, 7.3.7 Intermodal Yard Crane Rail Foundation SubgradeCalculator ▸Guide
PVFAA P-501 Random SamplingUsed in Chapter 5.3, 5.3.2 Compaction TestingCalculator ▸Guide
PVFinished Subgrade ElevationUsed in Chapter 7.3, 7.3.6 Subgrade Preparation and Compaction CriteriaCalculator ▸Guide
PVGRDSLAB — Concrete Slab on GradeUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVILDOT (no precore)Used in Chapter 7.3, 7.3.6 Subgrade Preparation and Compaction CriteriaCalculator ▸Guide
PVOptimized Aggregate Gradation (HWS)Used in Chapter 7.3, 7.3.6 Subgrade Preparation and Compaction CriteriaCalculator ▸Guide
PVOptimized Aggregate Gradation (TxDOT)Used in Chapter 7.2, 7.2.4 Stone Columns; Chapter 7.3, 7.3.6 Subgrade Preparation and Compaction CriteriaCalculator ▸Guide
PVPCA Heavy Industrial PCC PavementUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVRCC Thickness DesignUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVRoller Compacted Concrete (RCC) DesignUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVWheel Load Conversion — Dual to SingleUsed in Chapter 7.3, 7.3.3 AASHTO 1993 Flexible Pavement DesignCalculator ▸Guide
7.3.18 AASHTO 1993 Pavement Design for Crossings, Access Roads and Yards

Railroads own a surprising amount of highway-type pavement: approaches to grade crossings, maintenance and access roads, yard and intermodal driveways, and parking areas at facilities. These are designed with the AASHTO Guide for Design of Pavement Structures (1993), which most state DOTs and railroads still accept for this work. The Guide turns traffic in 18-kip equivalent single axle loads (ESALs), a reliability level, the allowable loss of serviceability and the subgrade resilient modulus into a required structural number (flexible pavement) or slab thickness (rigid pavement). The nomographs in the Guide solve two equations; the calculators below solve the equations directly, which is more precise than reading the charts.

7.3.18.1 Method

Equation 7.3-2. AASHTO flexible pavement design equation (Guide Figure 3.1)

log10W18 = ZRS0 + 9.36 log10(SN + 1) − 0.20 + log10[ΔPSI/(4.2 − 1.5)] / [0.40 + 1094/(SN + 1)5.19] + 2.32 log10MR − 8.07;   SN = a1D1 + a2m2D2 + a3m3D3

ZR = standard normal deviate for reliability R; S0 = overall standard deviation (0.40 to 0.50); ΔPSI = p0 − pt; MR = effective roadbed resilient modulus (psi); ai = layer coefficients (a2 = 0.249 log EBS − 0.977; a3 = 0.227 log ESB − 0.839); mi = drainage coefficients; Di = layer thicknesses (in.).

Equation 7.3-3. AASHTO rigid pavement design equation (Guide Figure 3.7)

log10W18 = ZRS0 + 7.35 log10(D + 1) − 0.06 + log10[ΔPSI/(4.5 − 1.5)] / [1 + 1.624×107/(D + 1)8.46] + (4.22 − 0.32pt) log10{{S′cCd(D0.75 − 1.132) / [215.63J(D0.75 − 18.42/(Ec/k)0.25)]}}

D = slab thickness (in.); S′c = modulus of rupture (psi); Cd = drainage coefficient; J = load transfer coefficient; Ec = concrete modulus (psi); k = effective modulus of subgrade reaction (pci), or MR/19.4 with no subbase.

In layered flexible design (Guide Section 4.1.5) the equation is solved three times: with the base modulus in place of MR to find the structural number the asphalt must provide above the base (SN1), with the subbase modulus for SN2, and with the roadbed modulus for the total SN3. Each layer is then sized from the remaining structural number and rounded up, subject to the Guide’s minimum thicknesses (asphalt 1.0 to 4.0 in. and base 4 to 6 in., increasing with traffic).

Table 7.3-11. Calculator against the AASHTO nomograph examples
CaseInputsGuide (chart)Calculator (equation)
Flexible, Figure 3.1W18 = 5×106, R = 95%, S0 = 0.35, MR = 5,000 psi, ΔPSI = 1.9SN = 5.0SN = 4.98
Rigid, Figure 3.7W18 = 5.1×106, R = 95%, S0 = 0.29, ΔPSI = 1.7, S′c = 650 psi, Cd = 1.0, J = 3.2, Ec = 5×106 psi, k = 72 pciD = 10.0 in.D = 9.72 in. (10.0 in. rounded up)

The small differences are the reading precision of the nomographs; the Guide notes that the equations are the more precise solution.

7.3.18.2 Worked example

Example 7.3-4: Flexible Pavement for a Grade-Crossing Approach

A public road crossing on a Class I railroad located in Michigan is being reconstructed, and the road authority asks for a flexible pavement on the approaches matching the AASHTO 1993 Guide. The design traffic is 5 million ESALs; the subgrade is a silty clay with an effective resilient modulus of 5,000 psi.

D1 = ?D2 = ?D3 = ?roadbed MR = 5,000 psiasphalt, a1 = 0.44base EBS 30,000 psisubbase ESB 15,000 psiW18 = 5 × 10⁶GivenW18 = 5,000,000 ESALsR = 95%, S0 = 0.35; ΔPSI = 1.9MR = 5,000 psia1 0.44; EBS 30,000; ESB 15,000; m = 1.0RequiredRequired SND1, D2, D3
Flexible pavement section for the crossing approach: asphalt, crushed base and granular subbase over the roadbed soil.

Given

VariableValueDescription
W185,000,000 ESALsDesign lane, performance period
R, S095% (ZR = −1.645); 0.35Urban arterial
p0, pt4.2; 2.3 (ΔPSI = 1.9)
MR5,000 psiRoadbed, seasonally adjusted
Asphalta1 = 0.44Dense-graded
BaseEBS = 30,000 psi, m2 = 1.0Crushed aggregate, fair drainage
SubbaseESB = 15,000 psi, m3 = 1.0Granular

Required

  • Required structural number
  • Layer thicknesses by the layered procedure
  • Check of the structural number provided

Equations

  1. Eq. 7.3-2: log W18 = ZRS0 + 9.36 log(SN + 1) − 0.20 + … + 2.32 log MR − 8.07 — solved for SN
  2. Eq. 7.3-2: a2 = 0.249 log EBS − 0.977; a3 = 0.227 log ESB − 0.839
  3. Eq. 7.3-2: D1 ≥ SN1/a1; D2 ≥ (SN2 − a1D1)/(a2m2); D3 ≥ (SN3 − a1D1 − a2m2D2)/(a3m3) — layered design

Steps

Step 1 · Total SN (roadbed MR = 5,000 psi)
Solve with log W18 = 6.699
SN3 = 4.98
Spot check: The Guide’s Figure 3.1 example with these inputs reads SN = 5.0.
↓
Step 2 · SN above base and subbase
Same equation with MR = 30,000 psi, then 15,000 psi
SN1 = 2.63; SN2 = 3.40
↓
Step 3 · Layer coefficients
0.249 log 30,000 − 0.977; 0.227 log 15,000 − 0.839
a2 = 0.138; a3 = 0.109
↓
Step 4 · Asphalt
2.63/0.44 = 5.99 in.
D1 = 6.0 in. (minimum 3.5 in.)
↓
Step 5 · Base
(3.40 − 0.44 × 6.0)/(0.138 × 1.0) = 5.5 in.
D2 = 6.0 in. (minimum 6 in.)
↓
Step 6 · Subbase
(4.98 − 2.64 − 0.138 × 6.0)/(0.109 × 1.0) = 13.9 in.
D3 = 14.0 in.
Spot check: SN provided = 0.44(6.0) + 0.138(6.0) + 0.109(14.0) = 2.64 + 0.83 + 1.53 = 4.99 ≥ 4.98.
↓
Solution
6.0 in. asphalt on 6.0 in. crushed base on 14.0 in. granular subbase (SN = 4.99).

Solution

The approaches need SN = 4.98: 6 in. of asphalt on 6 in. of crushed aggregate base on 14 in. of granular subbase.

At a crossing the pavement meets the crossing surface and the track structure, so match the road authority’s section to the crossing panels, carry the subbase drainage away from the track ballast, and keep the subgrade under the approaches at least as stiff as under the track to avoid a bump at the panels.

Open the AASHTO flexible pavement calculator →
Required structural number from the 1993 equation, layer coefficients from moduli, the layered design of asphalt, base and subbase with minimum thicknesses, and an SN-versus-ESAL chart.

Open the AASHTO rigid pavement calculator →
Slab thickness from the 1993 rigid equation for the design ESALs, reliability, serviceability, concrete properties, load transfer, drainage and k-value, with a sensitivity check on k.

7.3.18.3 Sources

The summaries above are paraphrased in original wording; equations and tabulated values are standard or published. Individual railroads, clients, companies and projects are not named.

  • AASHTO, Guide for Design of Pavement Structures (1993): Part II, Chapter 2 (design requirements, Tables 2.2 to 2.6) and Chapter 3 (Figures 3.1 and 3.7, layered design and minimum thicknesses).Find source ↗
  • T.G. Hicks (ed.), Handbook of Civil Engineering Calculations, McGraw-Hill (2000): Section 5, highway pavement design procedures.Find source ↗Library entry
Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

Primary sources

Supplemental references

  • Huang, Y. H., Rose, J. G. and Khoury, C. J. (c. 1987). “Thickness Design for Hot-Mix Asphalt Railroad Trackbeds.” Proc. Association of Asphalt Paving Technologists, pp. 427–453 (scanned; text recovered by OCR)Find source ↗
  • Limburg, A. and Nielsen, D. (2019). “Fast-Tracked Pavement Maintenance Using Concrete Rubblization.” AREMA 2019 Annual Conference ProceedingsFind source ↗
  • SHRP2 R02 / GeoTechTools (2012). Geosynthetic Separation in Pavement Systems — fact sheet, design guidance and photographsFind source ↗
  • SHRP2 R02 / GeoTechTools (2012). Geocell Confinement in Pavement Systems — fact sheet, design guidance and photographsFind source ↗
  • U.S. Army Corps of Engineers (2010). PCASE 2.09 User Manual. Transportation Systems Center / ERDCFind source ↗
  • Mauduit, C., Livet, J. and Piau, J-M. (2007). “Frost Design Method for Roadways and Railways – State of the Art in France.” In Gomes Correia, A., Momoya, Y. and Tatsuoka, F. (eds.), Design and Construction of Pavements and Rail Tracks. Taylor & Francis/BalkemaFind source ↗
  • Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §6.11, §10.16, §11.7Find source ↗Library entry

File locations for these documents are listed under Supplemental References.

Project management sources

  • Bull, J. W. (ed.) (2015). Life Cycle Costing for the Analysis, Management and Maintenance of Civil Engineering Infrastructure. Dunbeath, Scotland: Whittles PublishingFind source ↗
Supplemental References

Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S9 for railroad clients; tables are condensed from the book and its figures are not reproduced. The Case Studies section summarizes case studies from item S10 by Burt G. Look; its figures are reproduced from the book for internal reference use, and the closing “For railroad work” note in each case study is added by the authors of this manual. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.

  1. Huang, Y. H., Rose, J. G. and Khoury, C. J. (c. 1987). “Thickness Design for Hot-Mix Asphalt Railroad Trackbeds.” Proc. Association of Asphalt Paving Technologists, pp. 427–453 (scanned; text recovered by OCR)Find source ↗
  2. Limburg, A. and Nielsen, D. (2019). “Fast-Tracked Pavement Maintenance Using Concrete Rubblization.” AREMA 2019 Annual Conference ProceedingsFind source ↗
  3. SHRP2 R02 / GeoTechTools (2012). Geosynthetic Separation in Pavement Systems — fact sheet, design guidance and photographsFind source ↗
  4. SHRP2 R02 / GeoTechTools (2012). Geocell Confinement in Pavement Systems — fact sheet, design guidance and photographsFind source ↗
  5. U.S. Army Corps of Engineers (2010). PCASE 2.09 User Manual. Transportation Systems Center / ERDCFind source ↗
  6. Mauduit, C., Livet, J. and Piau, J-M. (2007). “Frost Design Method for Roadways and Railways – State of the Art in France.” In Gomes Correia, A., Momoya, Y. and Tatsuoka, F. (eds.), Design and Construction of Pavements and Rail Tracks. Taylor & Francis/BalkemaFind source ↗
  7. Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
  8. Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
  9. Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: ch. 10Find source ↗Library entry
  10. Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. Leiden: CRC Press/Balkema (Taylor & Francis). ISBN 978-1-032-10470-6. Case studies used on this page: §6.11, §10.16, §11.7Find source ↗Library entry
  11. Bull, J. W. (ed.) (2015). Life Cycle Costing for the Analysis, Management and Maintenance of Civil Engineering Infrastructure. Dunbeath, Scotland: Whittles Publishing. Used on this page for project-management materialFind source ↗

Photograph credits

The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.

  1. Photo 7.3.3-1 — Test section design, numbering scheme, and number of passes to failure. From Crockford, Grogan, and Chill (1993), Transportation Research Record 1418, Figure 4, p. 63. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  2. Photo 7.3.3-2 — Fiber-reinforced soil sample prepared for laboratory testing. From the US Army Corps of Engineers. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  3. Photo 7.3.3-3 — Fiber-soil field mixing. From the US Army Corps of Engineers. The Fact Sheet document's own cover image is a closely related photograph of the same mixing operation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  4. Photo 7.3.6-1 — Excavation of unsuitable soil using hydraulic excavator in Columbus, Mississippi. Photograph courtesy of David M. Coleman. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  5. Photo 7.3.6-2 — Typical use of excavation and replacement methods for improving site conditions. Rollings and Rollings (1996). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  6. Photo 7.3.6-3 — After excavation, geogrid and granular replacement fill, Columbus, Mississippi. From the files of David M. Coleman. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  7. Photo 7.3.6-4 — Area requiring excavation and replacement, Sandlake-Galloway Road Project. From Tillamook County, Oregon. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  8. Photo 7.3.6-5 — Excavation and geosynthetic placement prior to replacement, Sandlake-Galloway Road Project. From Tillamook County, Oregon. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  9. Photo 7.3.6-6 — Self-propelled pan scraper on Stage C of Highway 14, Waseca, MN. From EquipmentImages.net. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  10. Photo 7.3.6-7 — Towed scrapers on Stage C of Highway 14, Waseca, MN. From EquipmentImages.net. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  11. Photo 7.3.6-8 — Placement of geosynthetic in roadway. Courtesy of National Highway Institute. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  12. Photo 7.3.6-9 — Placement of geosynthetic in roadway. Courtesy of Kansas Department of Transportation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  13. Photo 7.3.6-10 — Placement of geosynthetic in roadway. From Kansas Department of Transportation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  14. Photo 7.3.6-11 — Placement of geosynthetic in roadway. From Kansas Department of Transportation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  15. Photo 7.3.6-12 — Geocell infilled with soil. From the files of Jie Han, University of Kansas. A closely related crop of this same photograph appears as the Fact Sheet document's own cover image. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  16. Photo 7.3.6-13 — Geocell-reinforced road construction. From the files of Jie Han, University of Kansas. A closely related crop of this same photograph appears as the Fact Sheet document's own cover image. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  17. Photo 7.3.6-14 — Geosynthetic-reinforced temporary, unpaved road. From a National Highway Institute lecture. The Fact Sheet document's own cover image reuses this same photograph at higher resolution, reproduced here. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  18. Photo 7.3.6-15 — Placement of geotextile during roadway construction. From the Kansas Department of Transportation. The Fact Sheet document's own cover image reuses this same photograph at higher resolution, reproduced here. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  19. Photo 7.3.6-16 — Straightedge rut-depth measurement on a test section. From the project case history document; caption not provided in the source. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  20. Photo 7.3.6-17 — Definition of blinding, clogging, and caking. Black and Holtz (1999); with permission from ASCE. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  21. Photo 7.3.6-18 — Placement of base course materials over the geotextile in roadway. From Minnesota Department of Transportation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  22. Photo 7.3.6-19 — Placement of geotextile in roadway. From National Highway Institute Lecture notes. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  23. Photo 7.3.6-20 — Grading of rock cap aggregate. From Uhlmeyer et al. (2003), Transportation Research Record 1821, Figure 5(c), p. 45. Copyright, National Academy of Sciences. Reproduced with permission of the Transportation Research Board. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  24. Photo 7.3.6-21 — Rock cap overlaid with crushed stone subbase (cross-section). From Uhlmeyer et al. (2003), Transportation Research Record 1821, Figure 2(a), p. 41. Copyright, National Academy of Sciences. Reproduced with permission of the Transportation Research Board. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  25. Photo 7.3.6-22 — Placement of rock cap with belly dump trucks. From Uhlmeyer et al. (2003), Transportation Research Record 1821, Figure 5(b), p. 45. Copyright, National Academy of Sciences. Reproduced with permission of the Transportation Research Board. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  26. Photo 7.3.6-23 — Placement of base material on top of the geotextile. Photograph from www.tencate.com, courtesy of TenCate Geosynthetics North America. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  27. Photo 7.3.6-24 — Compaction of base material on top of the geogrid. Photograph courtesy of North Dakota DOT. This same photograph is also used as the Fact Sheet document's cover image. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  28. Photo 7.3.11-1 — Rubblization using RMI Resonant Breaker. Photograph courtesy of Resonant Machines, Inc., 2005. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  29. Photo 7.3.11-2 — Particle distribution of the recycled pavement material (RPM). Li et al. (2007); with permission from ASCE. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  30. Photo 7.3.11-3 — Hot In-place Recycling (HIR) train. Photograph courtesy of ARRA (2001). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  31. Photo 7.3.11-4 — Multi-unit Cold In-place Recycling train. Photograph courtesy of ARRA (2001). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  32. Photo 7.3.11-5 — Full-Depth Reclamation (FDR). From FHWA-SA-98-042; Kandhal and Mallick (1997). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  33. Photo 7.3.11-6 — Cold milling. From FHWA-SA-98-042; Kandhal and Mallick (1997). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  34. Photo 7.3.11-7 — Break and seat operation. Photograph courtesy of Antigo Construction, Inc. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  35. Photo 7.3.11-8 — Rubblization using MHB Badger Breaker. Photograph courtesy of Antigo Construction, Inc. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗