Empirical Equations — Use and Limitations

Rating ground hazard risk now, and how much each solution will reduce it: triggering mechanisms, current risk, and risk reduction ratings.
Author: Daniel P. Colwell
Empirical Equations — Use and Limitations

The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.

IDCorrelationGives
RK-12Rockfall Hazard Rating System scoringRHRS score
LS-08Rainfall intensity–duration threshold (Caine)I
LS-01Reach angle (Fahrböschung) vs. volume — rock avalanchesH/L
LS-03Debris-flow travel distanceL
LS-06Debris-flow velocity from superelevationv
LS-09Rainfall intensity–duration threshold (global update)I
LS-10Newmark sliding displacement (regression)Dₙ
RK-06Slope Mass RatingSMR
RK-11Rockfall shadow angleβ (shadow)