↑ Parent Menu⌂ Main Menu
← Chapter 3.8 Risk Ratings and Ground Hazard Risk Assessment
GHRM
Railway Ground Hazard Risk Management · 3.0 · Risk Management
Sections · open a dropdown to go to a section or subsection

References

Rating ground hazard risk now, and how much each solution will reduce it: triggering mechanisms, current risk, and risk reduction ratings.
Author: Daniel P. Colwell
References
  • Caine, N. (1980). The rainfall intensity–duration control of shallow landslides and debris flows. Geografiska Annaler, Series A, 62(1–2), 23–27.Find source ↗
  • Cruden, D.M. and Varnes, D.J. (1996). Landslide types and processes. In Landslides: Investigation and Mitigation, TRB Special Report 247.Find source ↗
  • Hungr, O., Leroueil, S. and Picarelli, L. (2014). The Varnes classification of landslide types, an update. Landslides, 11, 167–194.Find source ↗
  • Selig, E.T. and Waters, J.M. (1994). Track Geotechnology and Substructure Management. Thomas Telford.Find source ↗
  • Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press, Boca Raton, Florida. Cited as 2015 in Ruel (2026b).Find source ↗
  • Federal Railroad Administration, Track Safety Standards, 49 CFR Part 213 (incl. §213.239 Special inspections).eCFR Part 213 ↗
  • FHWA, HEC-18, Evaluating Scour at Bridges, 5th edition, FHWA-HIF-12-003 (2012), the current edition.Find source ↗
  • ASTM D6230, Standard Test Method for Monitoring Ground Movement Using Probe-Type Inclinometers.Official page ↗
  • Bunce, C. (forthcoming). Chapter 11, Railway tunnel hazards. In Canadian Railway Geohazard Manual. Railway Ground Hazard Research Program, Canada.Find source ↗
  • CSA (Canadian Standards Association) (1997). Risk Management: Guideline for Decision-Makers. CAN/CSA-Q850-97. Canadian Standards Association, Mississauga, Ontario.Find source ↗
  • CSA (Canadian Standards Association) (2022). CSA R114: Canadian Methodology for Risk Evaluation and Assessment for Railways (CMREA). CSA Group, Toronto, Ontario.Find source ↗
  • ISO (International Organization for Standardization) (2018). ISO 31000:2018, Risk Management — Guidelines. ISO, Geneva.Find source ↗
  • Keegan, T.R. (2007). Methodology for Risk Management of Railway Ground Hazards. Ph.D. thesis, Department of Civil and Environmental Engineering, University of Alberta, Edmonton, Alberta.Find source ↗
  • Keegan, T.R. (n.d.). A Railway Ground Hazard Risk Analysis Methodology Overview. Klohn Crippen Berger Ltd., Vancouver, British Columbia.Find source ↗
  • Macciotta, R. (forthcoming). Chapter 2, Risk assessment methodologies. In Canadian Railway Geohazard Manual. Railway Ground Hazard Research Program, Canada.Find source ↗
  • RGHRP (Railway Ground Hazard Research Program) (forthcoming). Canadian Railway Geohazard Manual. Railway Ground Hazard Research Program, Canada.Find source ↗
  • Roghani, A. (2021). Quantifying the effect of freeze–thaw cycles on track surface deformation and degradation of railway track geometry; case study. Transportation Geotechnics, 30, 100601.Find source ↗
  • Roghani, A., Caldwell, R., Hiedra-Cobo, J. and Charbachi, P. (2021). Lessons learned from a long-term frost heave monitoring under a railway embankment. Proceedings of the 1st Canadian and Cold Regions Rail Research Conference (CCRC 2021), National Research Council Canada.Find source ↗
  • Roghani, A., Liu, Y. and Burgess, P. (2021). Investigating the impact of frost heave and thaw softening on changing the vertical force at wheel/rail interface. Proceedings of the 1st Canadian and Cold Regions Rail Research Conference (CCRC 2021), National Research Council Canada.Find source ↗
  • Ruel, M. (2024). Railway ballast, Chapter 12. In Canadian Railway Geohazard Manual (forthcoming). Proceedings of the 77th Canadian Geotechnical Conference (GeoMontréal 2024), Montréal, Québec, September 15–18, 2024.Find source ↗
  • Ruel, M. (2026a). Recommended Method 1606: Spring Preparedness. A Canadian passenger railroad, Montréal, Québec.Find source ↗
  • Ruel, M. (2026b). Railway frost geohazards: winter to spring break-up, frost heave and soft subgrade. Chapter 9 (final draft, September 3, 2026), Canadian Railway Geohazard Manual. Railway Ground Hazard Research Program, Canada. Source of Sections 3.8.7 and 3.8.8 and Figures 3.8.7-1 to 3.8.8-18.Find source ↗
  • TSB (Transportation Safety Board of Canada) (1992). Derailment, Class I railroad Company, Train No. 303-18, Mile 133.5, Caramat subdivision, Nakina, Ontario, 19 July 1992. Railway Investigation Report R92T0183. TSB, Gatineau, Québec.Find source ↗
← Previous · 3.0 Risk Management Chapter 3.7 — Cost Estimates
Next · 3.0 Risk Management → Chapter 3.9 — Geotechnical Investigation Planning and Scope