Authors: Daniel P. Colwell and Mario Ruel. This part was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management. Sections 3.8.7 and 3.8.8 are adapted from Mario Ruel’s chapter on railway frost geohazards for the Railway Ground Hazard Research Program (Ruel 2026b).
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
References
- Caine, N. (1980). The rainfall intensity–duration control of shallow landslides and debris flows. Geografiska Annaler, Series A, 62(1–2), 23–27.Find source ↗
- Cruden, D.M. and Varnes, D.J. (1996). Landslide types and processes. In Landslides: Investigation and Mitigation, TRB Special Report 247.Find source ↗
- Hungr, O., Leroueil, S. and Picarelli, L. (2014). The Varnes classification of landslide types, an update. Landslides, 11, 167–194.Find source ↗
- Selig, E.T. and Waters, J.M. (1994). Track Geotechnology and Substructure Management. Thomas Telford.Find source ↗
- Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press, Boca Raton, Florida. Cited as 2015 in Ruel (2026b).Find source ↗
- Federal Railroad Administration, Track Safety Standards, 49 CFR Part 213 (incl. §213.239 Special inspections).eCFR Part 213 ↗
- FHWA, HEC-18, Evaluating Scour at Bridges, 5th edition, FHWA-HIF-12-003 (2012), the current edition.Find source ↗
- ASTM D6230, Standard Test Method for Monitoring Ground Movement Using Probe-Type Inclinometers.Official page ↗
- Bunce, C. (forthcoming). Chapter 11, Railway tunnel hazards. In Canadian Railway Geohazard Manual. Railway Ground Hazard Research Program, Canada.Find source ↗
- CSA (Canadian Standards Association) (1997). Risk Management: Guideline for Decision-Makers. CAN/CSA-Q850-97. Canadian Standards Association, Mississauga, Ontario.Find source ↗
- CSA (Canadian Standards Association) (2022). CSA R114: Canadian Methodology for Risk Evaluation and Assessment for Railways (CMREA). CSA Group, Toronto, Ontario.Find source ↗
- ISO (International Organization for Standardization) (2018). ISO 31000:2018, Risk Management — Guidelines. ISO, Geneva.Find source ↗
- Keegan, T.R. (2007). Methodology for Risk Management of Railway Ground Hazards. Ph.D. thesis, Department of Civil and Environmental Engineering, University of Alberta, Edmonton, Alberta.Find source ↗
- Keegan, T.R. (n.d.). A Railway Ground Hazard Risk Analysis Methodology Overview. Klohn Crippen Berger Ltd., Vancouver, British Columbia.Find source ↗
- Macciotta, R. (forthcoming). Chapter 2, Risk assessment methodologies. In Canadian Railway Geohazard Manual. Railway Ground Hazard Research Program, Canada.Find source ↗
- RGHRP (Railway Ground Hazard Research Program) (forthcoming). Canadian Railway Geohazard Manual. Railway Ground Hazard Research Program, Canada.Find source ↗
- Roghani, A. (2021). Quantifying the effect of freeze–thaw cycles on track surface deformation and degradation of railway track geometry; case study. Transportation Geotechnics, 30, 100601.Find source ↗
- Roghani, A., Caldwell, R., Hiedra-Cobo, J. and Charbachi, P. (2021). Lessons learned from a long-term frost heave monitoring under a railway embankment. Proceedings of the 1st Canadian and Cold Regions Rail Research Conference (CCRC 2021), National Research Council Canada.Find source ↗
- Roghani, A., Liu, Y. and Burgess, P. (2021). Investigating the impact of frost heave and thaw softening on changing the vertical force at wheel/rail interface. Proceedings of the 1st Canadian and Cold Regions Rail Research Conference (CCRC 2021), National Research Council Canada.Find source ↗
- Ruel, M. (2024). Railway ballast, Chapter 12. In Canadian Railway Geohazard Manual (forthcoming). Proceedings of the 77th Canadian Geotechnical Conference (GeoMontréal 2024), Montréal, Québec, September 15–18, 2024.Find source ↗
- Ruel, M. (2026a). Recommended Method 1606: Spring Preparedness. A Canadian passenger railroad, Montréal, Québec.Find source ↗
- Ruel, M. (2026b). Railway frost geohazards: winter to spring break-up, frost heave and soft subgrade. Chapter 9 (final draft, September 3, 2026), Canadian Railway Geohazard Manual. Railway Ground Hazard Research Program, Canada. Source of Sections 3.8.7 and 3.8.8 and Figures 3.8.7-1 to 3.8.8-18.Find source ↗
- TSB (Transportation Safety Board of Canada) (1992). Derailment, Class I railroad Company, Train No. 303-18, Mile 133.5, Caramat subdivision, Nakina, Ontario, 19 July 1992. Railway Investigation Report R92T0183. TSB, Gatineau, Québec.Find source ↗
Case studies
- Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §3.8Find source ↗Library entry
Project management sources
- Bissonette, M. M. (2016). Project Risk Management: A Practical Implementation Approach. Newtown Square, PA: Project Management InstituteFind source ↗
- Skill Right (2013). Project Management Tools and Techniques: An Introductory Course in Project Management Foundations [training slides sponsored by Texas Instruments, Inc.; minor modifications by N. Santiago, Spring 2013 version]Find source ↗