dirtbert.com › GHRM › Manual contents › Section 2.0
GHRM · Section 2.0

The Underworld

Track foundation, failure mechanisms, soil and rock, track substructure, problem soils and groundwater.

13 chapters

About this section

Section 2.0 describes the ground the railroad is built on and in: the elements that make up the track foundation, how they fail and what sets failures off, and the soils, rock and groundwater that control their behavior. It includes chapters on the problem soils that cause the most trouble on railroad corridors, from soft clays, silts and peats to collapsible soils, old fills, karst and reactive mudrocks.

This is the “what can go wrong and why” section. The mechanisms and triggers described here are the ones the risk ratings in Section 3.0 score, the exploration in Section 4.0 looks for, and the analyses in Section 6.0 check.

How it fits: Feeds the triggering mechanisms and hazard ratings in Section 3.0, and the soil parameters used in Sections 5.0 to 7.0.

Chapters

Chapter 2.1

Track Foundation Elements

Everything beneath the subgrade surface that the track depends on — embankments, cuts, foundation soils, drainage structures, bridge approaches and the structural foundations that share the right-of-way.

22 subsections
Chapter 2.2

Soil and Rock Classification

Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…

21 subsections
Chapter 2.3

Track Substructure: Ballast, Subballast and Subgrade

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.

22 subsectionsFormerly Geo Rail Chapter 13
Chapter 2.4

Silts: Properties, Typical Values and Liquefaction

Silt sits between sand and clay: too fine to drain freely, too coarse and too weakly plastic to hold together when wet. That combination makes it the…

22 subsections
Chapter 2.5

Clays: Properties, Typical Values and Behavior

Clay is the soil whose behavior depends most on water and time: it is strong when dry and weak when wet, it consolidates for years under new fill, it…

20 subsections
Chapter 2.6

Peats and Organic Soils: Properties, Typical Values and Behavior

Peat and organic soil are mostly water held in plant remains. They are the weakest and most compressible ground a railroad crosses: they settle for…

17 subsections
Chapter 2.7

Rock and Sand: Properties, Typical Values and Behavior

Sand and rock are usually the good ground on a railroad, but each has its own hazards: loose sand settles, scours, runs and liquefies; rock falls,…

20 subsections
Chapter 2.8

Groundwater Characterization and Seepage

Groundwater is the single most consequential subsurface variable in railroad geotechnical engineering.

19 subsections
Chapter 2.9

Collapsible Soils: Identification, Testing and Railroad Impacts

Dry, low-density soils that hold their shape until they get wet, then lose volume suddenly under the load they already carry.

10 subsections
Chapter 2.10

Non-Engineered Fills: Old Embankments, Waste and Made Ground

Most of the railroad network sits on fill placed before modern compaction control. This chapter covers how to characterize it and how it behaves.

8 subsections
Chapter 2.11

Soluble Ground and Karst: Sinkholes, Voids and Dissolution

Limestone, dolomite, gypsum and salt dissolve. The voids they leave, and the soil that ravels into them, cause some of the most sudden failures under track.

9 subsections
Chapter 2.12

Sulfates, Sulfides and Problem Mudrocks

Ground chemistry that attacks concrete, heaves stabilized subgrades and turns fresh shale into soil within a few seasons of exposure.

8 subsections
Chapter 2.13

Residual, Tropical and Arid Soils

Soils formed in place by weathering, and soils shaped by dry climates: why the usual sedimentary-soil rules do not fit them.

8 subsections

Apps

15 apps